Study guide

12.1 Activity Specific Operating Guidelines (ASOG)

Nautical Institute DP Operator DPO

Track your progress as you read

Finished sections get a check mark.

1 Introduction & NI Scheme

1.1 Current Exam Facts 1.2 Phases A–E Pathway 1.3 Certificates, Eligibility & Revalidation

2 DP Principles Fundamentals

2.1 What is Dynamic Positioning & Degrees of Freedom 2.2 Seven Components of a DP System 2.3 The DP Operator & Human-Machine Interface

3 Controller, Model & Environmental Sensors

3.1 DP Controller & Mathematical Model 3.2 Kalman Filtering & Current Estimation 3.3 Gyrocompass & Heading Feedback 3.4 Wind Sensor, MRU & UPS

4 GNSS & Acoustic Position References

4.1 DGNSS & Differential Correction 4.2 Relative GNSS / RTK Concepts 4.3 Hydroacoustics USBL/SSBL 4.4 Long Baseline (LBL) Systems

5 Relative PRS, Selection & Voting

5.1 Light Taut Wire 5.2 Laser Relative References (Fanbeam/CyScan) 5.3 Radar/Microwave Relative References (RadaScan) 5.4 Reference Selection, Voting & Common-Mode Failure

6 Power Generation & PMS

6.1 Diesel-Electric Power Architecture 6.2 Power Management System 6.3 Load Sharing, Load Shedding & Spinning Reserve

7 Bus Configuration & Power Failures

7.1 Open vs Closed Bus-Tie 7.2 Blackout & Blackout Recovery 7.3 Drive-Off vs Drift-Off

8 Thrusters & Allocation

8.1 Tunnel, Azimuth & Retractable Thrusters 8.2 Thrust Allocation, Forbidden Zones & Bias 8.3 Thruster Interaction & Faulty Thruster Response

9 Control Modes

9.1 Auto DP Mode 9.2 Joystick & Independent Joystick System 9.3 Mode Selection & Practical Setup

10 DP Equipment Classes

10.1 IMO Equipment Classes 1, 2 and 3 10.2 MSC.1/Circ.1580 vs MSC/Circ.645 10.3 Sensor Redundancy & 2-out-of-3 Voting

11 FMEA, Worst Case Failure & Consequence Analysis

11.1 FMEA & Annual DP Trials 11.2 Worst Case Failure 11.3 Consequence Analysis

12 ASOG, CAM & TAM

12.1 Activity Specific Operating Guidelines (ASOG) 12.2 Critical Activity Mode (CAM) 12.3 Task Appropriate Mode (TAM)

13 Capability Plots & Approach Planning

13.1 DP Capability Plots 13.2 Footprint Plots & Weather-Optimal Heading 13.3 500 m Zone Approach & Escape Routes

14 Watchkeeping & Industry Guidance

14.1 Watchkeeping & Handover 14.2 Checklists, Alarms & Time to Terminate 14.3 IMCA M103/M117 Guidance Context

15 Integrated Operations & Assessment Strategy

15.1 Multi-System Failure Scenarios 15.2 Integrated Operations Case Studies 15.3 Induction Assessment Strategy

12.1 Activity Specific Operating Guidelines (ASOG)

Key Takeaways Explain This Topic AI

An ASOG is an activity-specific bridge decision tool that maps equipment and environmental conditions to defined actions — not a generic SMS procedure page

Status names and colours vary by vessel and company; use the active ASOG’s exact condition bands and prescribed actions

ASOG rows link plant and system states — generators online, bus configuration, PRS enabled, thrusters available, weather/current — to continue/notify/suspend/abort responses

Ownership sits with the vessel/company DP authority chain (often Master, DP superintendent, and worksite client); the ASOG is reviewed when activity, location, plant, or risk changes

Time to terminate must be built into ASOG limits so critical external work can be stopped safely before conditions exceed residual capability

Last updated: July 2026

From philosophy to an activity-specific decision matrix

Class notation, FMEA, worst-case failure (WCF), and consequence analysis explain what the plant can survive . They do not, by themselves, tell the DPO what to do at 02:00 when a generator trips and a laser target is degraded. That bridge-level decision tool is the Activity Specific Operating Guidelines (ASOG) — sometimes called activity-specific operating guidelines, DP operating guidelines, or a company-branded equivalent. Industry guidance (notably IMCA operational practice) expects vessels to define clear limits and responses for the work at hand; the ASOG is how most DP crews implement that expectation.

On Induction MCQs and Simulator debriefs, ASOG questions test whether you treat it as a living, activity-bound decision matrix , not a binder of generic safety slogans.

What an ASOG is (definition for exams)

An ASOG is a structured set of limits and responses tailored to a specific DP activity (for example saturation diving, platform approach, heavy lift critical phase, ROV close work, pipe-lay, or open-water standby). It lists key equipment and environmental parameters and assigns each a condition or action level with a matching response . When a parameter leaves the normal band, the DPO does not invent a response: the active ASOG already maps the condition to its required response.

ASOG is… ASOG is not…

Activity-specific decision guidance for this job at this location A one-size-fits-all SMS chapter used unchanged for every voyage

A bridge/worksite tool linking plant status to operational action Only an engineer’s generator start schedule

Vessel-defined condition → response logic; some matrices use traffic-light colours A substitute for FMEA design calculations

  • Agreed with company and often client for the task A secret personal DPO checklist never shown to the Master
  • Updated when risk, plant, or activity changes Permanent wallpaper that never needs review

Important

Exam trap: “The ASOG is the vessel’s generic SMS emergency procedure for any casualty.” Wrong framing. SMS remains company safety management; the ASOG is the DP activity-specific bridge tool that converts equipment and environment status into graded operational actions for this task.

Status and action labels are vessel-specific

Many ASOGs use traffic-light or multi-band schemes, but the names, colours, thresholds, and required actions are not universal. The table below is only an example; the active vessel ASOG governs:

Status Typical meaning Typical DPO / worksite action

Green Within normal limits for the activity; residual capability after WCF remains adequate Continue the task; maintain normal monitoring and logging

Advisory / yellow Degraded but still controllable; margin reduced or a single failure path is closer Notify Master/client/worksite; heighten monitoring; prepare contingency; consider modifying the task (heading, footprint, concurrent work)

Red Limits breached or residual capability after design failure no longer acceptable for the activity Suspend critical external work, abort the activity phase, recover people/equipment, and move to a safe condition

Some company matrices add amber bands, “blue” recovery states, or separate columns for “advise client” versus “prepare to terminate.” Learn the principle that worsening conditions require increasingly protective action, then follow the exact labels and instructions in the active ASOG rather than memorising a universal colour code.

Linking plant status to actions

A good ASOG is not only weather numbers. It ties observable plant and system states to responses. Typical rows include:

Parameter family Example normal-condition criteria Example degraded / terminate triggers Linked action idea

Generators online Minimum gensets and spinning reserve per CAM/activity One set offline; reserve below threshold Start standby; notify; if the terminate condition applies, suspend critical work

Bus configuration Open bus (or proven closed-bus CAM arrangement) Unexpected closed bus; protection inhibit Restore CAM config or stop critical phase

Thrusters available Minimum thrusters / force axes per residual capability Thruster fail / deselected Consequence check; ASOG downgrade if residual lost

PRS enabled Required independent references voting Loss of one PRS family; high rejection rate Select alternate PRS; advisory; red if below min set

Sensors (gyro/MRU/wind) Redundant healthy sensors Dual failure path emerging Maintain voting; prepare abort if the terminate condition applies

Environment Wind, wave, current within analysed limits Rising trend toward limit Optimise heading; notify; terminate with time margin

Position / footprint Within agreed watch circle Growing excursion; consequence analysis alarm Investigate; follow graded ASOG path

Worksite interface Dive/crane/ROV status compatible with DP mode Concurrent high-risk operations stacking Coordinate stop of external work

The power of the matrix is decision speed under stress . When a generator trips during diving, the DPO should already know whether the active matrix requires notification and restoration or controlled recovery and termination. Arguing philosophy after the trip is too late.

Time to terminate

Time to terminate is the time required to safely conclude the external activity — recover divers, set down a load, disconnect a hose, clear the 500 m zone approach path — and move the vessel to a safer condition. ASOG environmental and equipment limits must account for that duration. If weather is rising and it takes forty minutes to recover divers, you cannot wait until red weather limits are already exceeded before starting recovery. Exam stems that mention “time to terminate” are testing proactive stop decisions, not last-second panic.

Ownership: who owns the ASOG?

Ownership is organisational, not “whoever printed the table.” Typical roles:

  • Role Ownership contribution
  • Company / DP authority Sets policy that ASOGs are required; defines standards and approval process
  • Master Overall vessel safety; ensures the active ASOG matches the intended activity and is briefed

Senior DPO / DP operator on watch Applies the ASOG continuously; initiates colour-status actions and communications

Chief Engineer / ECR Confirms plant configuration rows (generators, bus, thrusters available) are achievable and true

Client / worksite representative Agrees activity risk, simultaneous operations limits, and notification/abort paths

Dive / crane / ROV supervisor Owns the external activity timeline that drives time-to-terminate

On the exam, if asked who acts when the ASOG reaches a terminate/abort condition, the safe framing is: the agreed ASOG authority chain on the vessel (Master / DPO / worksite protocol) — not a random deck rating and not “wait for shore management email.” The DPO’s duty is to declare status and act within that chain without delay.

When the ASOG is written and updated

An ASOG is created or selected for the planned activity during operational planning (pre-job, SIMOPS review, DP setup meeting). It must be reviewed and updated when any of the following change materially:

Activity type — dive support ASOG is not a standby ASOG.

Location and proximity hazard — open water versus under a platform boom.

Plant configuration or defects — thruster out of service, PRS unavailable, protection system degraded.

Weather window and seasonal limits — forecast invalidates previous normal-condition bands.

Client or regulatory constraints — new simultaneous operations or restricted zones.

Lessons from trials, incidents, or FMEA revisions — residual capability numbers change.

A common exam and real-world failure mode is using yesterday’s TAM standby ASOG for today’s CAM dive . Condition bands, minimum generators, and abort criteria will be wrong. Another failure is leaving an ASOG unchanged after a thruster is locked out for maintenance: normal-condition rows that assume six thrusters become fiction.

Worked ASOG scenarios

Scenario A — Degraded-generator path. During ROV work near a structure, one of four online gensets trips. Spinning reserve falls into the advisory band. ASOG requires: notify Master and client, start standby immediately, reassess thruster power margin, continue only if residual after WCF remains acceptable. The DPO does not silently “hope the weather stays calm.”

Scenario B — Terminate-action PRS path. Two independent PRS families drop out; only one family remains. For Class 2-style critical work the active ASOG requires termination: suspend the critical phase, move clear if required, restore references before restarting. Continuing “because position still looks good” ignores single-failure philosophy.

Scenario C — Rising weather and time to terminate. Wind remains inside the normal band but trend is steep and divers need thirty minutes to recover. ASOG / company policy starts controlled recovery during an early action band rather than waiting until a terminate limit is breached. That is correct time-to-terminate thinking.

Scenario D — Wrong document. A candidate treats the ASOG as a maintenance planner or as the FMEA itself. The FMEA proves residual capability; the ASOG operates within that proof for a named activity.

Exam traps for ASOG items

  • Trap Correct framing
  • ASOG = generic SMS for any emergency ASOG is activity-specific DP operating limits and responses
  • ASOG status/action bands are only for weather ASOG bands cover equipment and environment

A terminate/abort condition means keep going carefully Follow the active ASOG’s suspend/abort action and move to a safe condition

  • Only engineers own generator rows DPO applies the matrix; engineers confirm plant truth
  • One ASOG forever Update when activity, plant, location, or risk changes

Consequence analysis alarm is decorative It is often an ASOG degradation trigger requiring the prescribed action

Operator habits that match the ASOG

Brief the active ASOG at handover: current ASOG condition, defects, open actions.

Verify plant rows match reality (generators, bus, thrusters, PRS) before critical work starts.

On any degradation, find the row , declare status, execute the prescribed communication and action.

Build time to terminate into early decisions — do not wait for the terminate limit if recovery is long.

Never “improve” normal-condition limits unilaterally to keep the client happy; change requires proper authority and documentation.

Bottom line: the ASOG is the activity-specific bridge matrix that links equipment and environmental status to continue / notify / suspend / abort actions. Know the active matrix’s condition labels and meanings, the plant rows it covers, who owns and updates it, and how time to terminate forces early stop decisions. On the exam and on watch, when status changes, follow the ASOG — do not freestyle.