Study guide
1.2 Phases A–E Pathway
Nautical Institute DP Operator DPO
Track your progress as you read
Finished sections get a check mark.
1 Introduction & NI Scheme
1.1 Current Exam Facts 1.2 Phases A–E Pathway 1.3 Certificates, Eligibility & Revalidation
2 DP Principles Fundamentals
2.1 What is Dynamic Positioning & Degrees of Freedom 2.2 Seven Components of a DP System 2.3 The DP Operator & Human-Machine Interface
3 Controller, Model & Environmental Sensors
3.1 DP Controller & Mathematical Model 3.2 Kalman Filtering & Current Estimation 3.3 Gyrocompass & Heading Feedback 3.4 Wind Sensor, MRU & UPS
4 GNSS & Acoustic Position References
4.1 DGNSS & Differential Correction 4.2 Relative GNSS / RTK Concepts 4.3 Hydroacoustics USBL/SSBL 4.4 Long Baseline (LBL) Systems
5 Relative PRS, Selection & Voting
5.1 Light Taut Wire 5.2 Laser Relative References (Fanbeam/CyScan) 5.3 Radar/Microwave Relative References (RadaScan) 5.4 Reference Selection, Voting & Common-Mode Failure
6 Power Generation & PMS
6.1 Diesel-Electric Power Architecture 6.2 Power Management System 6.3 Load Sharing, Load Shedding & Spinning Reserve
7 Bus Configuration & Power Failures
7.1 Open vs Closed Bus-Tie 7.2 Blackout & Blackout Recovery 7.3 Drive-Off vs Drift-Off
8 Thrusters & Allocation
8.1 Tunnel, Azimuth & Retractable Thrusters 8.2 Thrust Allocation, Forbidden Zones & Bias 8.3 Thruster Interaction & Faulty Thruster Response
9 Control Modes
9.1 Auto DP Mode 9.2 Joystick & Independent Joystick System 9.3 Mode Selection & Practical Setup
10 DP Equipment Classes
10.1 IMO Equipment Classes 1, 2 and 3 10.2 MSC.1/Circ.1580 vs MSC/Circ.645 10.3 Sensor Redundancy & 2-out-of-3 Voting
11 FMEA, Worst Case Failure & Consequence Analysis
11.1 FMEA & Annual DP Trials 11.2 Worst Case Failure 11.3 Consequence Analysis
12 ASOG, CAM & TAM
12.1 Activity Specific Operating Guidelines (ASOG) 12.2 Critical Activity Mode (CAM) 12.3 Task Appropriate Mode (TAM)
13 Capability Plots & Approach Planning
13.1 DP Capability Plots 13.2 Footprint Plots & Weather-Optimal Heading 13.3 500 m Zone Approach & Escape Routes
14 Watchkeeping & Industry Guidance
14.1 Watchkeeping & Handover 14.2 Checklists, Alarms & Time to Terminate 14.3 IMCA M103/M117 Guidance Context
15 Integrated Operations & Assessment Strategy
15.1 Multi-System Failure Scenarios 15.2 Integrated Operations Case Studies 15.3 Induction Assessment Strategy
1.2 Phases A–E Pathway
Key Takeaways Explain This Topic AI
Phase A is the DP Induction Course plus the online invigilated MCQ; Phase C is the Simulator Course with online examination and practical assessment.
Phases B and D each require a minimum of 60 DP sea-time days, with Phase B also requiring the task section on DP Class 1/2/3 vessels and company confirmation.
A DP sea-time day counts only when the vessel spends at least two hours in active or passive DP operations under the scheme rules.
Phase B allows a maximum of 90 days logged toward that phase, with limited carry of excess active days into D and a cap on passive days in B; optional Sea Time Reduction can cut Phase D by 30 days (not for the jack-up scheme).
Phase E is the Master’s Statement of Suitability; applications and logbooks run through the NI Alexis Platform.
Last updated: July 2026
The pathway is linear — skip a phase and you are not certified
The offshore NI DPO scheme is deliberately sequential. Each phase unlocks the next: classroom knowledge, supervised experience, advanced simulation, more experience, then formal suitability. Understanding day definitions , caps , and documentation is as important as thruster theory, because invalid sea time is the most common career delay .
Phase table (memorise this map)
- Phase Name What you must complete
- A DP Induction Course NI-accredited course + online invigilated MCQ assessment
B DP sea time (first block) Minimum 60 DP sea-time days , task section on DP Class 1/2/3 vessels, company confirmation
- C DP Simulator Course NI-accredited simulator course + online examination and practical assessment
- D DP sea time (second block) Minimum 60 DP sea-time days (subject to STR reduction if eligible)
- E Suitability & certificate Master’s Statement of Suitability and application via NI Alexis Platform
- Phase A — Induction + online exam
Phase A introduces the DP system architecture: controller and model, position references, power plant and PMS concepts, thrusters, equipment classes, and basic operational procedures. Delivery is classroom plus training equipment at an NI-accredited centre . Exit assessment is the online invigilated multiple-choice exam (40 items, 1h15m, 70% ). Passing Phase A alone does not authorise independent DP watches as a certified DPO; it opens the sea-time and logbook pathway.
What counts as a DP sea-time day
Under the scheme, a DP sea-time day is a day on which the vessel spends at least two hours in active or passive DP operations as defined in the NI standard. Active time is time the vessel is maintaining position/heading under DP for operational work; passive time is DP use that meets the standard’s passive criteria (for example standby or defined non-critical holding). Logging calendar days alongside a DP vessel without meeting the ≥2 hours DP ops threshold does not create valid DP days. Officers must record time carefully in the NI logbook structure so company confirmers and NI auditors can verify it.
Phase B — first sea-time block, tasks, and caps
Phase B is where theory meets the bridge:
Minimum: 60 DP sea-time days
Tasks: complete the prescribed task section while gaining experience on DP Class 1, 2, and/or 3 vessels as required by the current logbook
Confirmation: obtain company confirmation of the sea time and tasks
Maximum days countable in Phase B: 90 Phase B days (you cannot bank unlimited B time as if it were unlimited career experience for this phase)
Excess active carry: up to 30 excess active DP days beyond what Phase B needs may carry forward toward Phase D under the standard’s rules
Passive cap in B: a maximum of 30 passive DP days may count within Phase B
These caps stop candidates from completing Phase B entirely on passive time or from treating unlimited sea time as automatically Phase-B-valid. Plan rotations so you accumulate enough active time , finish tasks , and avoid a pile of unusable passive-only days.
Phase C — Simulator Course, online examination, and practical assessment
After Phase B documentation is in order, you attend the DP Simulator Course . Training escalates to multi-fault scenarios, degraded references, power splits, and operational decision-making (ASOG-style status thinking, escape planning, communication). Assessment includes an online examination and a practical component in which instructors evaluate whether you can set up, monitor, and recover a DP vessel model safely. Failing Phase C usually means remedial training and reassessment per centre/NI rules — not automatic re-entry to Phase A, but you cannot proceed to Phase D credit until Phase C is passed.
Phase D — second sea-time block
Phase D requires another minimum of 60 DP sea-time days after successful Phase C (unless reduced by an approved route). This block is intended to consolidate operator competence after simulator pressure testing. Vessel class and last sea-time composition matter for whether the eventual certificate is Limited or Unlimited (Section 1.3). Keep logging discipline identical to Phase B: ≥2 hours DP ops per counted day, correct active/passive classification, and company confirmation.
Optional Sea Time Reduction (STR)
The Sea Time Reduction (STR) course is an optional NI-recognised training route that can reduce Phase D sea time by 30 days on the standard offshore scheme . Important limits:
STR does not apply to the jack-up scheme pathway in the same way — do not assume a 30-day cut if you are on jack-up rules
STR is not a substitute for Phase A, B, C, or E
Book STR only at accredited providers and confirm the reduction will appear correctly on your Alexis application
Phase E — Master’s Statement of Suitability
Phase E is not another exam paper. The vessel’s Master (or authorised equivalent under NI rules) completes a Statement of Suitability confirming you are fit to hold the certificate based on observed competence and completed scheme requirements. Without a satisfactory Phase E statement, NI will not issue the certificate even if courses and day counts look complete on paper.
Application channel: NI Alexis Platform
Modern applications, logbook workflows, centre bookings, and certificate processing run through the NI Alexis Platform . Practical habits:
- Create/maintain your Alexis profile before Phase A where possible
- Ensure sea-time entries and company confirmations match what you will upload
- Apply for the certificate only when A–E evidence is complete and inside the five-year scheme window
- Keep scans of confirmations; platform and centre records must agree
- Worked pathway scenarios
Scenario 1 — Passive-heavy Phase B. An officer logs 60 days but 40 are passive. If the scheme allows only 30 passive days in Phase B, part of that time does not count . The officer still needs valid days (and tasks) before Phase C.
Scenario 2 — Excess active time. An officer completes 85 valid Phase B days with a strong active component. After meeting the 60-day minimum and task requirements, up to 30 excess active days may carry toward Phase D, shortening the post-simulator sea-time burden if documented correctly.
Scenario 3 — STR planning. After Phase C, an officer takes an approved STR course and reduces Phase D by 30 days , leaving a 30-day Phase D minimum on the standard scheme — still subject to class/last-sea-time rules for Unlimited vs Limited.
Order discipline
- Incorrect sequence Why it fails
- Simulator before Induction Phase C assumes Phase A (and B) foundations
- Certificate application after A only Sea time, C, D, and E still outstanding
- Sea time with no ≥2 h DP ops Days do not qualify as DP sea-time days
- Jack-up candidate relying on offshore STR cut STR reduction rules do not transfer blindly to jack-up scheme
Bottom line: complete A → B (60+ DP days, tasks, caps, company confirmation) → C → D (60 DP days or STR-reduced) → E , count only ≥2-hour DP days, and file everything through Alexis .