Study guide

11.1 IEEE C37.2 Device Function Numbers, IEEE 315 Symbols, and NEMA Ratings

NICET Electrical Power Testing Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Electrical Safety, Standards, and Work Practices (NFPA 70E & OSHA)

1.1 NFPA 70E Framework, Electrically Safe Work Conditions, and Approach Boundaries 1.2 Arc Flash Hazard Analysis, Incident Energy, and PPE Category Selection 1.3 Hazardous Energy Control: OSHA 1910.147 Lockout/Tagout & Grounding Procedures 1.4 Confined Spaces, Hazard Communication, and Job Site Safety Management 1.5 Voltage Classes, Approach Boundaries in Practice, and Equipment Isolation 1.6 Temporary Protective Grounding: ASTM F855, OSHA 1910.269(n), and the Equipotential Zone 1.7 Fall Protection, Ladders, Scaffolds, and Elevated Work 1.8 Fire Hazards, Extinguisher Classes, Emergency Response, First Aid, and CPR

2 Chapter 2: Electrical Power Theory, Test Instrumentation, and Basic Measurements

2.1 AC/DC Power Fundamentals, Three-Phase Systems, and Power Factor Concepts 2.2 Insulation Resistance Testing Fundamentals, Megohmmeters, DAR, and PI (IEEE 43) 2.3 Low-Resistance Measurement: Contact Resistance, DLROs, and Micro-ohmmeters 2.4 High-Voltage Test Equipment: AC/DC Hipots, VLF Sets, and Dielectric Withstand Principles 2.5 DC Circuit Analysis: Ohm's Law, Series and Parallel Networks, and Power 2.6 Test Equipment Identification, Selection, Ranges, and Calibration Control 2.7 Insulation Power Factor and Dissipation Factor Instrumentation: GST, GSTg, and UST Modes

3 Chapter 3: Power Transformers, Regulators, and Insulating Fluids

3.1 Transformer Visual Inspection, Nameplate Interpretation, and Vector Groups 3.2 Transformer Turns Ratio (TTR) and Winding Resistance Testing 3.3 Insulation Power Factor & Dissipation Factor Testing (Doble Test & Bushings) 3.4 Insulating Liquid Testing: Dielectric Breakdown (ASTM D877/D1816) and Physical Properties 3.5 Dissolved Gas Analysis (DGA, ASTM D3612), Duval Triangle, and Fault Interpretation 3.6 Excitation Current, Core Insulation, and Applied and Induced Potential Tests 3.7 Load Tap Changers, Voltage Regulators, and Insulating Liquid Processing

4 Chapter 4: Circuit Breakers, Switchgear, and Motor Control Centers

4.1 Low-Voltage Circuit Breakers (MCCB/LVPCB) and Electronic Trip Unit Testing (LSIG) 4.2 Medium- and High-Voltage Circuit Breakers: Vacuum, SF6, and Air Magnetic Breakers 4.3 Circuit Breaker Timing, Motion/Travel Analysis, and Contact Velocity 4.4 Switchgear, Switchboards, MCC Buswork, and Interlock Systems 4.5 Overcurrent Device Testing: Primary Injection, Secondary Injection, and Time-Current Curves 4.6 Vacuum Interrupter Integrity Testing and SF₆ Gas Quality Management 4.7 Fuses, Medium-Voltage Switches, and Disconnecting Devices

5 Chapter 5: Power Cables, Busways, and Terminations

5.1 Medium-Voltage Cable Construction, Shielding, and Termination Inspection 5.2 Cable Insulation Resistance, DC Withstand, and VLF Field Testing (IEEE 400.2) 5.3 Advanced Cable Diagnostics: Tan-Delta / Dissipation Factor and Partial Discharge (IEEE 400.3) 5.4 Busways, Duct Banks, and Cable Shield Continuity Testing 5.5 Cable Fault Location: TDR, Thumping, Arc Reflection, and Sectionalizing

6 Chapter 6: Protective Relaying and Instrument Transformers

6.1 Current Transformers (CTs): Ratio, Polarity, Excitation/Saturation, and Burden Testing 6.2 Voltage Transformers (VTs/PTs) and Control Power Transformers (CPTs) 6.3 Protective Relaying Fundamentals, Device ANSI Numbers (50/51, 87, 21, 27/59, 81), and Coordination 6.4 Electromechanical, Solid-State, and Digital/Microprocessor Relay Testing Methods 6.5 Differential Protection (87T, 87B, 87G) and Impedance/Distance Protection (21) 6.6 Overcurrent Relay Testing (50/51): Pickup, Timing, Reset, and Curve Selection 6.7 Protective Device Coordination, Short-Circuit, and Arc Flash Studies 6.8 Watt-Hour Meters, Transducers, and Power Quality Analysis 6.9 SCADA, Substation Automation, Functional Test Plans, and P&C Troubleshooting

7 Chapter 7: Grounding Systems and Ground-Fault Protection

7.1 Ground Resistance Testing: Fall-of-Potential (IEEE 81), 62% Rule, and Clamp-On Methods 7.2 Soil Resistivity Measurement (Wenner 4-Pin Method) and Ground Grid Integrity 7.3 Equipment Grounding, System Grounding, and Bonding Verification 7.4 Ground-Fault Protection Systems (GFPE): Sensor, Relay, and Injection Testing (NEC 230.95) 7.5 Step and Touch Potential and Ground Grid Design Criteria (IEEE 80)

8 Chapter 8: Rotating Machinery, Specialty Equipment, and Commissioning Management

8.1 AC/DC Motors and Generators: Stator, Rotor, Surge Comparison, and High-Potential Testing 8.2 Stationary Battery Systems, UPS, and DC Distribution Testing (IEEE 450 / 1188) 8.3 Automatic Transfer Switches and Emergency Power Transfer 8.4 NETA Acceptance vs. Maintenance Standards, Test Data Trending, and Temperature Correction 8.5 Electrical Commissioning: The Phased Sequence from Receipt to Full Load 8.6 Surge Arresters: Types, MCOV, Application, and Field Evaluation 8.7 Capacitors, Reactors, and Harmonic Filter Banks

9 Chapter 9: Infrared Thermography and Condition-Based Assessment

9.1 Infrared Thermography Fundamentals: Emissivity, Reflectivity, and Camera Setup 9.2 Conducting and Evaluating Thermographic Surveys (NETA Section 9, Table 100.18) 9.3 Ultrasonic, Corona, and Vibration Survey Techniques

10 Chapter 10: Test Data Evaluation, Troubleshooting, and Failure Analysis

10.1 Reading Electrical Drawings: One-Lines, Three-Lines, Schematics, and Site Plans 10.2 Evaluating Test Results Against NETA, Manufacturer, and Baseline Data 10.3 Serviceability Determination and Energization Readiness 10.4 Failure Modes, Root-Cause Analysis, and Corrective Recommendations

11 Chapter 11: Documentation, Reporting, and Standards Literacy

11.1 IEEE C37.2 Device Function Numbers, IEEE 315 Symbols, and NEMA Ratings 11.2 Test Data Recording, Field Forms, and Data Integrity 11.3 Technical Report Writing, Data Trending, and Communicating Deficiencies 11.4 Standards and Regulatory Literacy: NETA, IEEE, NFPA, ASTM, ANSI, and OSHA

12 Chapter 12: Job Planning, Switching, Supervision, and Professional Practice

12.1 Site-Specific Safety Plans, Job Hazard Analysis, and Safety Audits 12.2 Project Testing (Job) Plans, Scheduling, and Resource Management 12.3 Switching Procedures: Development, Review, Confirmation, and Execution 12.4 Supervising Test Crews, Training, and Assigning Personnel 12.5 NICET Code of Ethics, Client Relations, and Certification Maintenance

11.1 IEEE C37.2 Device Function Numbers, IEEE 315 Symbols, and NEMA Ratings

Key Takeaways Explain This Topic AI

Level II task 2.4.1 requires recognizing and interpreting IEEE electrical device function numbers and NEMA ratings, citing IEEE C37.2 Sections 3 and 4, IEEE 315, and NEMA ICS 19.

The 2026 Level II outline restates this as task 2.3.3, identify the most common IEEE and ANSI electrical device function numbers.

Suffix letters qualify a device number: 87T is transformer differential, 87B bus differential, 51N neutral time overcurrent, 51G ground time overcurrent.

NEMA enclosure types describe environmental protection, and Type 3R is rain-tight outdoor while Type 4X adds corrosion resistance and hose-directed water.

NEMA and IEC contactor ratings are not interchangeable: NEMA sizes are conservative fixed steps while IEC ratings are matched precisely to a duty category.

Last updated: August 2026

IEEE C37.2 Device Function Numbers, IEEE 315 Symbols, and NEMA Ratings

Quick Answer: Level II task 2.4.1 requires the technician to "recognize and interpret IEEE electrical device function numbers and NEMA ratings," citing IEEE C37.2 Sections 3 and 4 , IEEE 315 , NEMA ICS 19 , and NFPA 70B Annexes F and G . The 2026 outline restates it as Level II task 2.3.3, "Identify the most common IEEE/ANSI electrical device function numbers." This is vocabulary, it is directly testable, and it is worth points that require no equipment access at all.

1. The device function numbers

IEEE C37.2 assigns a number to a device function so that a drawing produced anywhere is readable everywhere. The numbers you must know:

  • No. Function Notes
  • 21 Distance Impedance-based; line and backup protection
  • 24 Volts per hertz Overexcitation protection for transformers and generators
  • 25 Synchronizing / synchronism check Permits closing only when two sources are in step
  • 27 Undervoltage
  • 32 Directional power Reverse power on generators
  • 37 Undercurrent or underpower Loss of load, pump run-dry
  • 40 Loss of field / loss of excitation Generators
  • 46 Reverse phase or phase balance current Detects unbalance and single-phasing
  • 47 Phase sequence / phase balance voltage
  • 49 Thermal (machine or transformer) Thermal replica
  • 50 Instantaneous overcurrent No intentional delay
  • 51 AC time overcurrent Inverse time delay
  • 52 AC circuit breaker The breaker itself
  • 55 Power factor
  • 59 Overvoltage
  • 60 Voltage or current balance Blown fuse detection on VT circuits
  • 62 Time delay stopping or opening Timer
  • 63 Pressure switch Transformer sudden pressure relay
  • 64 Ground detector
  • 67 AC directional overcurrent Overcurrent qualified by direction
  • 68 Blocking
  • 74 Alarm
  • 79 AC reclosing Automatic reclosing after a trip
  • 81 Frequency Over and under, and rate of change
  • 86 Lockout relay Latching; must be manually reset
  • 87 Differential Compares current in versus current out
  • 94 Tripping or trip-free Auxiliary tripping relay

Suffix letters qualify the number , and the exam tests the combinations:

  • Combination Meaning
  • 87T Transformer differential
  • 87B Bus differential
  • 87G Generator differential
  • 87L Line differential
  • 51N Neutral time overcurrent — from the residual of three phase CTs
  • 51G Ground time overcurrent — from a dedicated ground or window CT
  • 50/51 Combined instantaneous and time overcurrent in one device
  • 52a Breaker auxiliary contact that follows the breaker — closed when the breaker is closed
  • 52b Breaker auxiliary contact that is opposite the breaker — closed when the breaker is open

52a and 52b are worth memorizing exactly , because they appear in every control schematic. Mnemonic: a = " a s the breaker" (same state); b = " b ackwards" (opposite state). A trip coil circuit is supervised by a 52a contact so the coil is only energized while the breaker is actually closed; a close coil circuit is supervised by a 52b so it can only operate when the breaker is open.

Device 86, the lockout relay , is the other one that decides questions. It is a hand-reset latching device: once operated it stays operated, and the breaker cannot be reclosed until someone physically resets it. That is deliberate — an 86 operates for faults serious enough that a human should look at the equipment before it goes back into service, such as transformer differential or sudden pressure.

2. IEEE 315 symbols

IEEE 315 (with ANSI Y32.9) defines the graphic symbols. Conventions that matter most:

Contacts are always shown de-energized and un-actuated. A normally-closed contact is drawn closed on the schematic even though it will be open in normal operation once its coil is energized. This convention catches candidates constantly.

Transformer windings are drawn as delta or wye, with the wye neutral shown grounded, resistance-grounded, reactance-grounded, or floating — each a distinct symbol carrying real information about the system.

Polarity marks on instrument transformers indicate the instantaneous current direction relationship and are essential for differential and directional schemes.

Ground symbols distinguish earth ground, equipment ground, and chassis or signal common.

3. NEMA enclosure types

NEMA 250 classifies enclosures by the environment they protect against. The types a testing technician meets:

  • Type Location Protects against
  • 1 Indoor Incidental contact, falling dirt
  • 3R Outdoor Rain, sleet, snow; rain-tight , with drainage provisions
  • 3 Outdoor Rain, sleet, windblown dust; external ice formation
  • 4 Indoor/outdoor Hose-directed water , splashing water, windblown dust
  • 4X Indoor/outdoor Everything Type 4 covers plus corrosion
  • 7 Indoor hazardous Class I, Groups A-D — explosion-proof
  • 9 Indoor hazardous Class II — combustible dust
  • 12 Indoor industrial Dust, falling dirt, dripping non-corrosive liquids

The pairs that get confused: 3R is rain-tight, 4 is water-tight. 3R keeps out falling rain and has weep holes to drain what does get in; Type 4 withstands a directed hose stream. 4X adds corrosion resistance — the X is the corrosion qualifier and matters in coastal, chemical, and wash-down environments. Type 7 and 9 are the hazardous location enclosures, and their construction is entirely different: they are built to contain an internal explosion and cool the escaping gases below the ignition temperature of the surrounding atmosphere, not to keep the atmosphere out.

The field consequence for a testing technician: re-installing a cover with a damaged or omitted gasket, or leaving a conduit hub unsealed, downgrades the enclosure rating. On a Type 7 enclosure it defeats the explosion containment entirely. Restoring the enclosure to its rated condition is part of completing the work, and it belongs on the checklist.

4. NEMA versus IEC control equipment

Both rate contactors and starters, and they are not interchangeable .

  • NEMA (ICS 2) IEC (60947)
  • Basis Fixed sizes (00, 0, 1, 2, 3, 4, 5…) Rated to a specific utilization category and duty

Sizing philosophy Conservative; one size covers a horsepower range with margin Precise; matched to the actual application

  • Physical size Larger for the same horsepower Smaller and lighter
  • Application flexibility Interchangeable across a range Must match the duty category
  • Electrical life Generally longer at a given rating Shorter unless a higher category is selected

Utilization categories in IEC — AC-1 for non-inductive loads, AC-3 for squirrel-cage motor starting with breaking at running speed , AC-4 for plugging and inching duty — are the key. A contactor perfectly adequate as AC-3 may be badly undersized for AC-4 service, because AC-4 requires interrupting locked-rotor current repeatedly. The field consequence is the classic one: an IEC contactor replaced with "the same amp rating" from a different category fails prematurely, and the diagnosis is a selection error rather than a defective component.

NEMA's conservatism means a NEMA Size 2 starter will do the job for anything within its horsepower band without further analysis. That is why NEMA equipment dominates US industrial installations where maintainability and interchangeability matter more than panel space.

5. Reading a nameplate

The 2026 Level II outline makes 2.3.1, "Recognize nameplate data," its own task. What to capture, by apparatus:

Transformer: kVA (all cooling stages), primary and secondary voltage, percent impedance , connection and vector group, cooling class (ONAN/ONAF/ODAF), temperature rise, BIL, tap voltages, liquid type and volume, serial number.

Circuit breaker: frame size, continuous current, interrupting rating at each voltage, voltage rating, BIL, control voltage, operation counter reading, serial number.

Motor: horsepower, voltage, full-load amperes, service factor, insulation class , temperature rise, frame, RPM, code letter, design letter, duty, enclosure.

CT: ratio (and all taps on a multi-ratio unit), accuracy class and burden (metering and relaying classes differ), thermal and mechanical rating factor, polarity marking.

Arrester: MCOV , duty-cycle rating, class.

Photograph nameplates rather than only transcribing them. A transposed digit in a percent impedance propagates into the short-circuit study, the coordination study, and the arc flash labels.

Exam trap: A schematic shows a contact labelled 52b in a circuit and the question asks its state while the breaker is closed. A 52b contact is opposite the breaker, so with the breaker closed the 52b contact is open . Candidates who reverse a and b get every close-circuit and trip-circuit question wrong.