6.6 Overcurrent Relay Testing (50/51): Pickup, Timing, Reset, and Curve Selection
NICET Electrical Power Testing Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Electrical Safety, Standards, and Work Practices (NFPA 70E & OSHA)
1.1 NFPA 70E Framework, Electrically Safe Work Conditions, and Approach Boundaries 1.2 Arc Flash Hazard Analysis, Incident Energy, and PPE Category Selection 1.3 Hazardous Energy Control: OSHA 1910.147 Lockout/Tagout & Grounding Procedures 1.4 Confined Spaces, Hazard Communication, and Job Site Safety Management 1.5 Voltage Classes, Approach Boundaries in Practice, and Equipment Isolation 1.6 Temporary Protective Grounding: ASTM F855, OSHA 1910.269(n), and the Equipotential Zone 1.7 Fall Protection, Ladders, Scaffolds, and Elevated Work 1.8 Fire Hazards, Extinguisher Classes, Emergency Response, First Aid, and CPR
2 Chapter 2: Electrical Power Theory, Test Instrumentation, and Basic Measurements
2.1 AC/DC Power Fundamentals, Three-Phase Systems, and Power Factor Concepts 2.2 Insulation Resistance Testing Fundamentals, Megohmmeters, DAR, and PI (IEEE 43) 2.3 Low-Resistance Measurement: Contact Resistance, DLROs, and Micro-ohmmeters 2.4 High-Voltage Test Equipment: AC/DC Hipots, VLF Sets, and Dielectric Withstand Principles 2.5 DC Circuit Analysis: Ohm's Law, Series and Parallel Networks, and Power 2.6 Test Equipment Identification, Selection, Ranges, and Calibration Control 2.7 Insulation Power Factor and Dissipation Factor Instrumentation: GST, GSTg, and UST Modes
3 Chapter 3: Power Transformers, Regulators, and Insulating Fluids
3.1 Transformer Visual Inspection, Nameplate Interpretation, and Vector Groups 3.2 Transformer Turns Ratio (TTR) and Winding Resistance Testing 3.3 Insulation Power Factor & Dissipation Factor Testing (Doble Test & Bushings) 3.4 Insulating Liquid Testing: Dielectric Breakdown (ASTM D877/D1816) and Physical Properties 3.5 Dissolved Gas Analysis (DGA, ASTM D3612), Duval Triangle, and Fault Interpretation 3.6 Excitation Current, Core Insulation, and Applied and Induced Potential Tests 3.7 Load Tap Changers, Voltage Regulators, and Insulating Liquid Processing
4 Chapter 4: Circuit Breakers, Switchgear, and Motor Control Centers
4.1 Low-Voltage Circuit Breakers (MCCB/LVPCB) and Electronic Trip Unit Testing (LSIG) 4.2 Medium- and High-Voltage Circuit Breakers: Vacuum, SF6, and Air Magnetic Breakers 4.3 Circuit Breaker Timing, Motion/Travel Analysis, and Contact Velocity 4.4 Switchgear, Switchboards, MCC Buswork, and Interlock Systems 4.5 Overcurrent Device Testing: Primary Injection, Secondary Injection, and Time-Current Curves 4.6 Vacuum Interrupter Integrity Testing and SF₆ Gas Quality Management 4.7 Fuses, Medium-Voltage Switches, and Disconnecting Devices
5 Chapter 5: Power Cables, Busways, and Terminations
5.1 Medium-Voltage Cable Construction, Shielding, and Termination Inspection 5.2 Cable Insulation Resistance, DC Withstand, and VLF Field Testing (IEEE 400.2) 5.3 Advanced Cable Diagnostics: Tan-Delta / Dissipation Factor and Partial Discharge (IEEE 400.3) 5.4 Busways, Duct Banks, and Cable Shield Continuity Testing 5.5 Cable Fault Location: TDR, Thumping, Arc Reflection, and Sectionalizing
6 Chapter 6: Protective Relaying and Instrument Transformers
6.1 Current Transformers (CTs): Ratio, Polarity, Excitation/Saturation, and Burden Testing 6.2 Voltage Transformers (VTs/PTs) and Control Power Transformers (CPTs) 6.3 Protective Relaying Fundamentals, Device ANSI Numbers (50/51, 87, 21, 27/59, 81), and Coordination 6.4 Electromechanical, Solid-State, and Digital/Microprocessor Relay Testing Methods 6.5 Differential Protection (87T, 87B, 87G) and Impedance/Distance Protection (21) 6.6 Overcurrent Relay Testing (50/51): Pickup, Timing, Reset, and Curve Selection 6.7 Protective Device Coordination, Short-Circuit, and Arc Flash Studies 6.8 Watt-Hour Meters, Transducers, and Power Quality Analysis 6.9 SCADA, Substation Automation, Functional Test Plans, and P&C Troubleshooting
7 Chapter 7: Grounding Systems and Ground-Fault Protection
7.1 Ground Resistance Testing: Fall-of-Potential (IEEE 81), 62% Rule, and Clamp-On Methods 7.2 Soil Resistivity Measurement (Wenner 4-Pin Method) and Ground Grid Integrity 7.3 Equipment Grounding, System Grounding, and Bonding Verification 7.4 Ground-Fault Protection Systems (GFPE): Sensor, Relay, and Injection Testing (NEC 230.95) 7.5 Step and Touch Potential and Ground Grid Design Criteria (IEEE 80)
8 Chapter 8: Rotating Machinery, Specialty Equipment, and Commissioning Management
8.1 AC/DC Motors and Generators: Stator, Rotor, Surge Comparison, and High-Potential Testing 8.2 Stationary Battery Systems, UPS, and DC Distribution Testing (IEEE 450 / 1188) 8.3 Automatic Transfer Switches and Emergency Power Transfer 8.4 NETA Acceptance vs. Maintenance Standards, Test Data Trending, and Temperature Correction 8.5 Electrical Commissioning: The Phased Sequence from Receipt to Full Load 8.6 Surge Arresters: Types, MCOV, Application, and Field Evaluation 8.7 Capacitors, Reactors, and Harmonic Filter Banks
9 Chapter 9: Infrared Thermography and Condition-Based Assessment
9.1 Infrared Thermography Fundamentals: Emissivity, Reflectivity, and Camera Setup 9.2 Conducting and Evaluating Thermographic Surveys (NETA Section 9, Table 100.18) 9.3 Ultrasonic, Corona, and Vibration Survey Techniques
10 Chapter 10: Test Data Evaluation, Troubleshooting, and Failure Analysis
10.1 Reading Electrical Drawings: One-Lines, Three-Lines, Schematics, and Site Plans 10.2 Evaluating Test Results Against NETA, Manufacturer, and Baseline Data 10.3 Serviceability Determination and Energization Readiness 10.4 Failure Modes, Root-Cause Analysis, and Corrective Recommendations
11 Chapter 11: Documentation, Reporting, and Standards Literacy
11.1 IEEE C37.2 Device Function Numbers, IEEE 315 Symbols, and NEMA Ratings 11.2 Test Data Recording, Field Forms, and Data Integrity 11.3 Technical Report Writing, Data Trending, and Communicating Deficiencies 11.4 Standards and Regulatory Literacy: NETA, IEEE, NFPA, ASTM, ANSI, and OSHA
12 Chapter 12: Job Planning, Switching, Supervision, and Professional Practice
12.1 Site-Specific Safety Plans, Job Hazard Analysis, and Safety Audits 12.2 Project Testing (Job) Plans, Scheduling, and Resource Management 12.3 Switching Procedures: Development, Review, Confirmation, and Execution 12.4 Supervising Test Crews, Training, and Assigning Personnel 12.5 NICET Code of Ethics, Client Relations, and Certification Maintenance
6.6 Overcurrent Relay Testing (50/51): Pickup, Timing, Reset, and Curve Selection
Key Takeaways Explain This Topic AI
Device 51 is time overcurrent with an intentional inverse delay; device 50 is instantaneous overcurrent with no intentional delay.
Pickup is verified by slowly ramping current until the element asserts, and dropout is verified on the way back down to confirm the reset ratio.
Timing is verified at defined multiples of pickup, commonly 2, 3, and 5 times, and compared against the published curve for the selected time dial.
The tap setting selects the pickup current and the time dial shifts the entire curve vertically without changing its shape.
Electromechanical induction disc relays have a real reset time that must be respected between timing shots, and coordination with reclosing relies on it.
Last updated: August 2026
Overcurrent Relay Testing (50/51): Pickup, Timing, Reset, and Curve Selection
Quick Answer: Level II task 2.1e.2 requires "testing of basic devices, including motor overload relays, relay trip devices, over current relays , under/over voltage relays, and ammeters/voltmeters," with the graded skills including "read and interpret time/current characteristic curves" and "operate a protective relay test set." 51 is time overcurrent — pickup plus an intentional inverse delay. 50 is instantaneous — pickup with no intentional delay.
1. The device numbers and what they do
- Device Name Behaviour
- 50 Instantaneous overcurrent Operates with no intentional time delay above its pickup
- 51 AC time overcurrent Operates after an inverse time delay that shortens as current rises
- 50N / 51N Neutral (residual) overcurrent Fed from the residual connection of three CTs; sees ground current
- 50G / 51G Ground overcurrent Fed from a dedicated ground CT, such as a core-balance or window CT
- 67 Directional overcurrent Overcurrent that operates only for current in one direction
- 46 Negative sequence / phase balance Detects unbalance and single-phasing
- 49 Thermal overload Models thermal capacity
The 50/51 combination in one relay gives a curve with an inverse portion for coordination with downstream devices and a vertical cutoff for close-in high-magnitude faults.
N versus G is a real distinction. A 51N element derives its current from the residual connection of the three phase CTs, so its accuracy is limited by CT mismatch and it can misoperate on heavy through-fault current when the CTs saturate unequally. A 51G element uses a single window CT encircling all conductors, which measures true residual current directly and can be set far more sensitively — often to a few amperes — because it does not depend on three CTs matching.
2. Pickup testing
Pickup is the current at which the element just begins to operate.
Procedure:
Connect the test set to the relay's current input, isolating the relay's trip output from the breaker unless a full functional trip is intended.
Apply current below the expected pickup.
Ramp slowly upward and record the current at which the element asserts. Ramping too quickly overshoots and reports a high pickup.
Ramp back down and record the current at which it drops out.
Dropout / reset ratio is dropout current divided by pickup current, and it is a real diagnostic. A typical electromechanical induction disc relay resets around 90-95 % of pickup. A markedly low reset ratio in an electromechanical relay indicates mechanical drag — dirty bearings, a rubbing disc, a damaged jewel, or a bent contact. Microprocessor relays have programmable reset characteristics.
Tolerance: compare against the manufacturer's published tolerance and the setting sheet. NETA's instruction, as always, is the manufacturer's data first.
3. Timing tests
Timing verifies that the relay follows its published curve.
Standard test points: 2×, 3×, and 5× pickup. Multiple points are needed because a single point can be met by a relay whose curve shape is wrong — for example a relay set to the wrong curve family that happens to cross the correct value at one current.
Procedure at each point:
Compute the required current: multiple × pickup × (CT ratio if testing at primary values).
Apply the current as a step , not a ramp — the timing clock starts when current is applied.
Record the time from application to contact closure.
Compare against the published curve at the selected time dial .
Allow the relay to fully reset before the next shot.
That last step is not a formality on an electromechanical relay. The induction disc physically rotates from its rest position toward the contact; if the next test begins before the disc has returned home, it starts partway along its travel and reports a falsely short time. Reset time on an induction disc can be several seconds and is itself a published characteristic.
4. Curve families and the time dial
The two effects are independent, and confusing them is a classic error:
Tap (or pickup setting) selects the current at which the relay starts timing. Changing tap shifts the curve horizontally .
Time dial (or time multiplier setting) scales the operating time . Changing the time dial shifts the whole curve vertically without changing its shape .
Curve families, standardized in IEEE C37.112 and IEC 60255:
- Family Character Typical use
- Definite time Fixed delay regardless of magnitude Simple backup, some ground elements
- Moderately inverse Mild slope Where source impedance dominates and fault current varies little
- Inverse Moderate slope General distribution
- Very inverse Steeper Coordinating with downstream fuses
- Extremely inverse Steepest Coordination with fuses and reclosers , and transformer inrush riding
Why extremely inverse coordinates with fuses: a fuse's melting characteristic is also steeply inverse — a thermal I²t behaviour. Matching the relay curve shape to the fuse shape keeps the two curves roughly parallel across the fault current range, preserving a consistent coordination interval instead of having them converge at one end.
Coordination time interval (CTI) between an upstream relay and the device below it is conventionally on the order of 0.2 to 0.4 seconds for microprocessor relays and longer for electromechanical, allowing for downstream breaker clearing time, relay overtravel, and CT and relay tolerances.
5. Instantaneous (50) testing
The 50 element is verified by applying current in steps and finding the level at which it operates. Use short applications — these are high currents and continuous application heats the relay, the test set, and the leads.
Transient overreach is the property to understand: a fault current with a DC offset can cause an instantaneous element to operate below its steady-state setting, because the offset raises the peak the element responds to. Modern relays filter for it; older electromechanical instantaneous units are specified with an overreach figure. This is why a 50 element is typically set above the maximum asymmetrical current the relay should not see — such as transformer inrush or motor starting.
6. Connections and safety
Never open an energized CT secondary. Short the CT before disconnecting anything in its circuit. An open CT secondary on a loaded primary develops a dangerously high voltage and can destroy the CT.
Isolate the trip circuit with test switches or shorting blocks before injecting, unless the intent is a full functional trip. An unintended breaker operation during testing is both a safety and an availability event.
Use the test switch or FT-1 style test block where installed; that is what it is for.
Record as-found settings before changing anything , and verify as-left settings against the coordination study when finished. As-found data is what tells the owner whether the relay had drifted or had been mis-set.
Exam trap: A question describes a technician who performs three consecutive timing shots on an electromechanical induction disc relay in rapid succession and finds the times growing progressively shorter. The relay is not degrading — the disc has not fully reset between shots and each test starts partway through the disc's travel.