6.3 Battery Sizing and Secondary Power

NICET Fire Alarm Systems Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Orientation: NICET FAS Levels, Exams, and Application Path

1.1 Program Purpose and Technician Role 1.2 Levels I Through IV and Role Expectations 1.3 Exam Counts, Times, Fees, and Format 1.4 Application, Work History, and Verification 1.5 Scheduling, Security, Scoring, and Retakes 1.6 Certification Maintenance and Study Planning

2 Code Navigation, References, and Exam Strategy

2.1 Reference Stack by Level 2.2 Physical and On-Screen Reference Rules 2.3 NFPA 72 Navigation Strategy 2.4 NFPA 70, Ugly's, and Electrical Reasoning 2.5 Building, Life Safety, and Management References 2.6 Timing, Exhibits, and Multi-Answer Strategy

3 Fire Alarm System Fundamentals and Components

3.1 System Architecture and Signal Flow 3.2 Control Units, Annunciators, and Interfaces 3.3 Initiating Devices and Detection Concepts 3.4 Notification Appliances and Occupant Signaling 3.5 Power Supplies, Circuits, and Supervision Basics 3.6 Basic Electricity, Electronics, and Field Vocabulary

4 Installation, Pathways, Devices, and Job-Site Safety

4.1 Work Plans, Drawings, and Field Conditions 4.2 Pathways, Raceways, and Cable Routing 4.3 Mounting Boxes and Peripheral Devices 4.4 Terminating Conductors and Labeling Circuits 4.5 Job-Site Safety for Fire Alarm Technicians 4.6 Commissioning Prep, Punch Lists, and Turnover Readiness

5 Inspection, Testing, Maintenance, and Impairments

5.1 Maintenance Domain Map for NICET FAS 5.2 Inspection, Testing, and Maintenance Distinctions 5.3 Periodic Testing Workflow 5.4 Deficiencies, Impairments, and Corrective Action 5.5 Documentation, Records, and Service History 5.6 Restoration, Troubleshooting, and Closeout

6 Power Supplies, Circuits, Loading, and Calculations

6.1 Power and Loading Domain Map for NICET FAS 6.2 Standby and Alarm Load Logic 6.3 Battery Sizing and Secondary Power 6.4 Notification Appliance Circuit Loading 6.5 Initiating and Signaling Circuit Supervision 6.6 Voltage Drop and Wire Resistance

7 Submittals, Technical Drawings, and System Layout

7.1 Drawing Package Purpose and Blueprint Fit 7.2 Site-Condition Surveys and Field Verification 7.3 Shop Drawing Content and Coordination 7.4 Layout Decisions for Devices, Pathways, and Interfaces 7.5 Drawing Review, Approval, and Level Responsibility 7.6 As-Builts, Closeout Packets, and Record Discipline

8 Commissioning, Acceptance, Troubleshooting, and Closeout

8.1 Commissioning Readiness and Systematic Startup 8.2 Acceptance Testing and Witness Coordination 8.3 Troubleshooting Faults and Deficiencies 8.4 Exam Exhibits, Scenario Logic, and Multi-Answer Items 8.5 Coordination with AHJ, Owner, Contractor, and Trades 8.6 Turnover, Closeout, and Post-Acceptance Support

9 Supervision, Project Coordination, and Work History

9.1 Level III and IV Supervision Boundaries 9.2 Coordinating Work Activities and Site Constraints 9.3 Leading Installation and Commissioning Teams 9.4 Managing Testing, Deficiencies, and Impairments 9.5 Documentation, As-Builts, Closeout, and Records 9.6 Work History, Verification, Recommendations, and Major Project Evidence

10 Complex Systems, Interfaces, and Specialty Operations

10.1 Level IV Complex Operations Frame 10.2 Suppression System Interfaces and Release Coordination 10.3 Networked Control Units and Distributed Systems 10.4 Smoke Control and High-Rise Interface Coordination 10.5 Air Sampling and Specialty Detection Strategy 10.6 Voice Evacuation, Emergency Radio, and Industry Coordination

11 Level-by-Level Review and Domain Remediation

11.1 Blueprint-First Review Method 11.2 Level I Remediation: Installation and Maintenance 11.3 Level II Remediation: Layout, Commissioning, and Coordination 11.4 Level III Remediation: Supervision, Records, and Approval 11.5 Level IV Remediation: Complex Operations and Leadership 11.6 Score Report Remediation and Practice Routing

12 Integrated NICET FAS Scenarios and Final Readiness

12.1 Integrated Scenario Reading Method 12.2 Final Seven-Day Study Plan 12.3 Exam-Day Reference and Logistics Checklist 12.4 Testing Interface, Timing, and NDA Readiness 12.5 Retake Decision Tree and Rescheduling 12.6 After Passing: Certification and Recertification

6.3 Battery Sizing and Secondary Power

Key Takeaways Explain This Topic AI

Required amp-hours = (standby amps × 24 h) + (alarm amps × alarm hours), then × the derating factor.

NFPA 72-2022 uses a 1.25 (25%) derating/safety factor (10.6.10.1); NFPA 72-2019 and earlier used 1.20.

Series-connected batteries add voltage, not amp-hour capacity — two 12 V/18 Ah batteries give 24 V at 18 Ah.

Select the next-larger standard battery; the charger must also be sized to recharge the battery within the listed time.

Last updated: June 2026

Battery Sizing and Secondary Power

When primary power is lost, the secondary battery must carry the system. The NFPA 72 sizing equation combines load, time, and a safety margin:

Required capacity (Ah) = [ (Standby amps × Standby hours) + (Alarm amps × Alarm hours) ] × Derating factor

Each term:

Standby hours = 24 for protected premises.

Alarm hours = 0.0833 (5 min, general) or 0.25 (15 min, voice/ECS).

Derating factor = 1.25 under NFPA 72-2022 (10.6.10.1); 1.20 under NFPA 72-2019 and earlier. The factor accounts for battery aging, temperature, and capacity loss over the battery's service life. (This is a correction to flag: older study material — including the prior draft of this guide — used 1.20; the 2022 edition the FAS exam references uses 1.25 .)

After computing required amp-hours, you select the next standard battery rating at or above the result, never below. Common sealed lead-acid (SLA) sizes are 4, 7, 7.2, 10, 12, 18, 26, 40, and 55 Ah.

  • Step Action Watch for
  • 1 Confirm the supply/panel under review Don't include a separate booster supply's loads
  • 2 Total standby current on that supply Convert mA to A
  • 3 Total alarm current on that supply Notification appliances live here
  • 4 Multiply each total by its duration 24 h vs 0.0833 h
  • 5 Add the two amp-hour legs Keep labels
  • 6 Multiply by derating (1.25 / 1.20) Use the correct edition
  • 7 Select next-larger standard battery Round up, never down

Fully Worked Battery Calculation

Using the schedule from 6.2: total standby = 0.355 A , total alarm = 2.295 A , general fire alarm (5-minute alarm), NFPA 72-2022 in force.

Battery calculation worksheet

  • Line Quantity Result
  • A. Standby current total 0.355 A —
  • B. Standby time 24 h —
  • C. Standby amp-hours (A × B) 0.355 × 24 8.520 Ah
  • D. Alarm current total 2.295 A —
  • E. Alarm time (5 min) 0.0833 h —
  • F. Alarm amp-hours (D × E) 2.295 × 0.0833 0.191 Ah
  • G. Subtotal (C + F) 8.520 + 0.191 8.711 Ah
  • H. Derating factor (2022) × 1.25 —
  • I. Required capacity (G × H) 8.711 × 1.25 10.89 Ah
  • J. Selected battery next-larger standard 12 Ah

Step-by-step in words:

Standby leg: 0.355 A × 24 h = 8.520 Ah (the standby load dominates because it runs for a full day).

Alarm leg: 2.295 A × 0.0833 h = 0.191 Ah (large current, tiny time, so a small contribution).

Subtotal = 8.520 + 0.191 = 8.711 Ah .

Apply derating: 8.711 × 1.25 = 10.89 Ah required.

Select the next standard size ≥ 10.89 Ah → a 12 Ah battery set.

Note the result is 24 V at 12 Ah , normally two 12 V/12 Ah batteries in series . Series adds voltage, not capacity, so the set is 24 V/12 Ah — not 24 Ah.

Trap 1 — series capacity: assuming two 12 V batteries double the amp-hours. They double voltage; capacity stays the same. Trap 2 — charger vs battery: the question may give a charger output; battery sizing compares required Ah to battery Ah, while the charger must independently be able to recharge the battery within the NFPA 72 recharge time (commonly 48 hours to full). Trap 3 — wrong derating: using 1.20 when the 2022 edition (1.25) governs, which under-sizes the battery. If a battery passes at 1.20 but fails at 1.25, the 1.25 answer is the safe choice under the listed edition.

A shop-drawing review may embed this calc: the exhibit shows battery size, standby and alarm currents, NAC load, supply model, and wire distance. If the stem asks what is missing , the answer is often the calculation/worksheet or the derating basis — not a new device.

Secondary-Power Sources, Recharge, and the Charger

The secondary supply does not have to be a battery alone. NFPA 72 recognizes (a) a storage battery with an automatic charger, or (b) an engine-driven generator with a battery dedicated to starting/operating the system until the generator carries the load. In practice, the battery-plus-charger arrangement is the norm for protected-premises systems, so understand both halves:

The battery must carry the full 24 h + alarm demand (the calculation above).

The charger must independently be able to recharge a fully discharged battery to its full rated capacity within the time the standard allows (commonly 48 hours). A charger that is sized only for float maintenance, not recharge, is a design defect even if the battery itself is large enough.

This is why "battery sizing" and "charger sizing" are two questions. A stem that gives you a charger output current and asks for battery capacity is testing whether you compare required amp-hours to battery amp-hours, not to the charger.

Worked Variation: Voice/ECS System (15-Minute Alarm)

Re-run the same loads as a voice/alarm communication system, where the alarm leg becomes 15 minutes = 0.25 h :

Standby leg: 0.355 A × 24 h = 8.520 Ah (unchanged).

Alarm leg: 2.295 A × 0.25 h = 0.574 Ah (about three times the 5-minute value).

Subtotal = 8.520 + 0.574 = 9.094 Ah .

× 1.25 derating = 11.37 Ah required → still a 12 Ah battery here, but a heavier system could be pushed to the next size.

The takeaway: switching from a 5-minute to a 15-minute alarm increases only the alarm leg, and because the standby leg dominates, the change is often modest — but you must still use the correct duration the stem specifies. Trap 4 — wrong alarm duration: applying 5 minutes to a voice/ECS system (or 15 minutes to a general system) is a common error that the exam deliberately sets up by describing the system type in the stem and expecting you to choose the matching duration.