Study guide

8.2 Three-Year Air-Leakage Options and Annual Air-Pressure Supervisory Testing

NICET Inspection and Testing of Water-Based Systems Level II Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Personal Safety, PPE & Equipment

1.1 PPE Requirements & Maintenance 1.2 Tool Safety, Electrical Safety & Stored-Energy Hazards in Charged Piping 1.3 Environmental Hazards, Hazardous Materials & Worksite Illumination

2 Chapter 2: High-Hazard Safety: LOTO, Confined Space & Working at Heights

2.1 Lockout/Tagout (LOTO) Procedures 2.2 Permit-Required Confined Spaces & Atmospheric Testing 2.3 Ladder Safety, Scaffolding & Aerial Lifts

3 Chapter 3: Customer Coordination & Pre-Inspection Scope

3.1 Pre-Inspection Review, Scope of Work & Scheduling 3.2 Stakeholder Notifications: Owners, Designated Representatives & Facility Operations 3.3 Safety Impairment Procedures & Site-Specific Hazard Protocols

4 Chapter 4: Stakeholder Notification, Reporting & Impairment Procedures

4.1 Central Station Alarm Monitoring & AHJ Notifications Before/After Testing 4.2 NFPA 25 Chapter 15 Impairment Program: Coordinator, Tagging & Fire Watch Rules 4.3 ITM Documentation, Record Retention & Delivering Deficiency Reports

5 Chapter 5: Wet Sprinkler Systems ITM

5.1 Gauges, Control Valves & Visual Inspection Frequencies 5.2 Waterflow Alarm Devices: Vane-Type Paddle Switches & Mechanical Gongs 5.3 Main Drain Test Procedure & the 10% Pressure Drop Rule 5.4 Sprinkler Head Inspection, Clearance & Laboratory Testing Age Triggers

6 Chapter 6: Wet System Specialized Components: Antifreeze & Air Vents

6.1 Antifreeze Systems: Types, Listed Solutions, Backflow Isolation & Testing Procedures 6.2 Antifreeze Solution Measurement: Refractometer / Hydrometer & Freeze-Point Verification 6.3 Automatic Air Vents & Nitrogen Inerting in Wet Systems

7 Chapter 7: Dry Pipe Systems & Specialized Equipment

7.1 Dry Pipe Valve Principles, Differential Ratios & Priming Water Level 7.2 Quick-Opening Devices (QODs): Accelerators & Exhausters Inspection and Testing 7.3 Dedicated Air Compressors, Automatic Air Maintenance Devices (AMDs) & Regulators 7.4 Nitrogen Generation Systems & Gas Separation Membranes

8 Chapter 8: Dry System Testing & Operational Verification

8.1 Annual Partial Trip Test vs. Three-Year Full Flow Trip Test 8.2 Three-Year Air-Leakage Options and Annual Air-Pressure Supervisory Testing 8.3 Dry Pipe Auxiliary Drains (Drum Drips) & Condensate Management in Freezing Weather

9 Chapter 9: Standpipe Systems & Deficiency Classification

9.1 Standpipe Classes (I, II, III), System Types & Component Visual Inspections 9.2 Standpipe 5-Year Hydrostatic & Flow Testing Requirements (500 gpm / 250 gpm) 9.3 Hose Valves, Pressure Regulating Devices (PRDs/PRVs) & FDC Inspection and Testing

10 Chapter 10: Fire Pump Systems & Drivers

10.1 Fire Pump Types (Horizontal Split Case, Vertical Turbine, End Suction) & System Arrangements 10.2 Fire Pump Drivers: Electric Motors, Diesel Engines & Controller Components 10.3 Pressure-Maintenance Pumps: Purpose, Capacity, and Coordinated Settings

11 Chapter 11: Fire Pump Inspection, Testing & Maintenance

11.1 Weekly Diesel (30-Minute) & Weekly/Monthly Electric (10-Minute) No-Flow (Churn) Tests 11.2 Annual Fire Pump Flow Test: Churn (0%), 100% Rated Flow & 150% Peak Flow 11.3 Pump Performance Evaluation: Net/Gross Curves and the Complete Acceptance Criteria 11.4 Diesel Support-System Maintenance and Electric-Pump Alternate Power

12 Chapter 12: Private Fire Service Mains & Hydrants

12.1 Underground Piping ITM & 5-Year Underground Flow Testing 12.2 Fire Hydrant Inspection, Lubrication & Annual Drainage Operational Tests 12.3 NFPA 291 Water Flow Testing: Layout, Pitot Readings & Flow Math 12.4 Hydrant Classification, Color Coding & Available Flow Extrapolation at 20 psi Residual

13 Chapter 13: Water Storage Tanks

13.1 Tank Types (Suction, Elevated, Pressure) & Component Overview 13.2 Inspection Frequencies: Water Level, Temperature (Min 40°F), Exterior & Interior 13.3 Tank Heating Systems, Low-Water Alarms, Vents, Overflow & Anti-Vortex Plates

14 Chapter 14: Internal Pipe Assessment & Obstruction Triggers

14.1 NFPA 25 Five-Year Internal Piping Assessment Procedures & Non-Destructive Testing 14.2 The Sixteen NFPA 25 (2023) Obstruction-Investigation Triggers 14.3 Five-Location Obstruction Examination, Evidence, and Required Follow-Up

15 Chapter 15: Flushing Methods, Contaminants & Deficiency Classification

15.1 Obstruction Materials: Corrosion, MIC Indicators, Scale, Ice, and Foreign Debris 15.2 Hydraulic Flushing: Program Scope, Velocity Calculations, and Completion Evidence 15.3 Specialist Cleaning Methods: Suitability, Safety Controls, and Restoration 15.4 Classifying Findings: Impairments vs. Critical Deficiencies vs. Noncritical Deficiencies

8.2 Three-Year Air-Leakage Options and Annual Air-Pressure Supervisory Testing

Key Takeaways Explain This Topic AI

The three-year dry-system leakage test permits a 40 psi, two-hour, maximum 3 psi loss method or a normal-pressure, four-hour, no-low-air-alarm method.

Do not mix the two methods or allow replenishment to conceal leakage.

Temperature affects pressure but does not create an automatic subtraction allowance for passing a test.

Dry-system air-pressure supervisory devices are tested annually under the 2023 provision.

Last updated: October 2026

Two permitted three-year air-leakage methods

NFPA 25 (2023), 13.4.5.2.9, provides two methods for the dry-system air-leakage test at least every three years. The first uses a 40 psi test pressure for two hours, with no more than 3 psi loss. The second uses normal system air pressure with the air supply shut off for four hours, during which the low-air supervisory alarm must not operate. Do not combine the starting pressure from one method with the duration and acceptance criterion from the other. Identify the selected method in the test record.

  • Method Starting condition Duration Criterion
  • Pressure-loss method 40 psi test pressure; supply isolated Two hours Loss no more than 3 psi
  • Normal-pressure method Normal system pressure; supply shut off Four hours No low-air supervisory alarm

The second option is not permission to disable the low-air alarm so that a leaking system appears to pass. Verify that the supervisory function is operational and that the normal pressure is correct for the installed valve. Apply the impairment and notification procedures appropriate to the test. Arrange staffing and access so that an unexpected pressure decline or valve trip can be handled safely.

Conduct and record a defensible test

Use the actual valve procedure and instruments appropriate to the selected method. Avoid opening covers, adjusting regulators, or isolating unrelated equipment without understanding the arrangement. Isolate replenishment so the compressor or generator cannot hide leakage. Record system identification, date, method, starting and ending pressures, elapsed time, relevant temperatures, and alarm observations. Restore the normal supply path afterward and confirm the correct valve positions and normal pressure.

For the two-hour method, a start of 40.0 psi and finish of 37.4 psi give a loss of 2.6 psi, within the 3 psi limit. A finish of 36.7 psi gives 3.3 psi loss and fails that criterion. Do not round 3.3 down to 3 merely because a coarse installed gauge has large divisions. Use suitable test instrumentation and document the actual readings. A successful leakage test does not demonstrate hydraulic capacity or replace a trip test.

For the four-hour method, record whether the low-air signal operates at any time during the interval. A signal after three hours is a failed result even if someone restarts the compressor before the fourth-hour observation. Testing must preserve the event history. Frequent compressor cycling in normal service also merits attention even when a particular test result is acceptable.

Temperature can change pressure

At approximately constant volume, ideal-gas absolute pressure varies with absolute temperature. Use gauge pressure plus local atmospheric pressure and temperature in kelvin or degrees Rankine when explaining that relationship. At sea level, 40 psig corresponds to about 54.7 psia. At 70°F, the absolute temperature is about 529.7°R. A 10°F cooling change would produce approximately 54.7 × 10 / 529.7 = 1.03 psi pressure reduction in an ideal sealed volume.

That calculation explains a possible influence, not permission to subtract an assumed allowance and override the prescribed pass criterion. Actual gas and pipe temperatures can differ from a room thermometer. Let conditions stabilize, document changes, and repeat or evaluate an invalid or inconclusive test through the proper procedure. Heating can mask a leak as cooling can imitate one. Do not create a false pass by selecting only favorable readings.

Find the leak without creating another hazard

Inspect accessible trim, connections, couplings, and equipment using compatible leak-detection fluid or other appropriate instruments. Ultrasonic detection can help locate escaping gas in a noisy facility, but range, background ultrasound, access, and instrument skill affect performance. It is not immune to all noise and cannot guarantee detection of every concealed leak from floor level. Confirm the suspected location before repair.

Do not increase pressure beyond the prescribed test or component rating to make a leak louder. Do not inject arbitrary tracer gases or chemicals into a listed system. Refer specialized methods to qualified personnel using an approved procedure. Isolate and depressurize the affected equipment for repair, manage any impairment, and retest under the selected criterion. A nitrogen system also presents oxygen-displacement hazards in enclosed spaces.

Annual dry-system air-pressure supervisory testing

NFPA 25 (2023), 13.4.5.2.6, requires annual testing of dry-system air-pressure supervisory devices. Do not substitute the quarterly provision applicable to a different system type. The low-air signal must give warning before the dry valve operates. The actual setting and high-pressure supervision, where provided, follow the applicable installation requirements, listed equipment, and approved arrangement; this guide does not impose one pressure offset on every valve.

Coordinate the test with the receiving station, reduce pressure through the prescribed means, and record the actual pressure and signal received. Stop before an unintended trip where the procedure calls for it. Check the correct system identification, restoration signal, and receiving-station status. A local switch click alone does not prove that the intended remote indication was received. Restore normal pressure and all isolations, and notify the responsible parties of completion or any unresolved defect.

Source checked October 19, 2026: NFPA 25 (2023), 13.4.5.2.6 and 13.4.5.2.9.