Study guide
11.3 Pump Performance Evaluation: Net/Gross Curves and the Complete Acceptance Criteria
NICET Inspection and Testing of Water-Based Systems Level II Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Personal Safety, PPE & Equipment
1.1 PPE Requirements & Maintenance 1.2 Tool Safety, Electrical Safety & Stored-Energy Hazards in Charged Piping 1.3 Environmental Hazards, Hazardous Materials & Worksite Illumination
2 Chapter 2: High-Hazard Safety: LOTO, Confined Space & Working at Heights
2.1 Lockout/Tagout (LOTO) Procedures 2.2 Permit-Required Confined Spaces & Atmospheric Testing 2.3 Ladder Safety, Scaffolding & Aerial Lifts
3 Chapter 3: Customer Coordination & Pre-Inspection Scope
3.1 Pre-Inspection Review, Scope of Work & Scheduling 3.2 Stakeholder Notifications: Owners, Designated Representatives & Facility Operations 3.3 Safety Impairment Procedures & Site-Specific Hazard Protocols
4 Chapter 4: Stakeholder Notification, Reporting & Impairment Procedures
4.1 Central Station Alarm Monitoring & AHJ Notifications Before/After Testing 4.2 NFPA 25 Chapter 15 Impairment Program: Coordinator, Tagging & Fire Watch Rules 4.3 ITM Documentation, Record Retention & Delivering Deficiency Reports
5 Chapter 5: Wet Sprinkler Systems ITM
5.1 Gauges, Control Valves & Visual Inspection Frequencies 5.2 Waterflow Alarm Devices: Vane-Type Paddle Switches & Mechanical Gongs 5.3 Main Drain Test Procedure & the 10% Pressure Drop Rule 5.4 Sprinkler Head Inspection, Clearance & Laboratory Testing Age Triggers
6 Chapter 6: Wet System Specialized Components: Antifreeze & Air Vents
6.1 Antifreeze Systems: Types, Listed Solutions, Backflow Isolation & Testing Procedures 6.2 Antifreeze Solution Measurement: Refractometer / Hydrometer & Freeze-Point Verification 6.3 Automatic Air Vents & Nitrogen Inerting in Wet Systems
7 Chapter 7: Dry Pipe Systems & Specialized Equipment
7.1 Dry Pipe Valve Principles, Differential Ratios & Priming Water Level 7.2 Quick-Opening Devices (QODs): Accelerators & Exhausters Inspection and Testing 7.3 Dedicated Air Compressors, Automatic Air Maintenance Devices (AMDs) & Regulators 7.4 Nitrogen Generation Systems & Gas Separation Membranes
8 Chapter 8: Dry System Testing & Operational Verification
8.1 Annual Partial Trip Test vs. Three-Year Full Flow Trip Test 8.2 Three-Year Air-Leakage Options and Annual Air-Pressure Supervisory Testing 8.3 Dry Pipe Auxiliary Drains (Drum Drips) & Condensate Management in Freezing Weather
9 Chapter 9: Standpipe Systems & Deficiency Classification
9.1 Standpipe Classes (I, II, III), System Types & Component Visual Inspections 9.2 Standpipe 5-Year Hydrostatic & Flow Testing Requirements (500 gpm / 250 gpm) 9.3 Hose Valves, Pressure Regulating Devices (PRDs/PRVs) & FDC Inspection and Testing
10 Chapter 10: Fire Pump Systems & Drivers
10.1 Fire Pump Types (Horizontal Split Case, Vertical Turbine, End Suction) & System Arrangements 10.2 Fire Pump Drivers: Electric Motors, Diesel Engines & Controller Components 10.3 Pressure-Maintenance Pumps: Purpose, Capacity, and Coordinated Settings
11 Chapter 11: Fire Pump Inspection, Testing & Maintenance
11.1 Weekly Diesel (30-Minute) & Weekly/Monthly Electric (10-Minute) No-Flow (Churn) Tests 11.2 Annual Fire Pump Flow Test: Churn (0%), 100% Rated Flow & 150% Peak Flow 11.3 Pump Performance Evaluation: Net/Gross Curves and the Complete Acceptance Criteria 11.4 Diesel Support-System Maintenance and Electric-Pump Alternate Power
12 Chapter 12: Private Fire Service Mains & Hydrants
12.1 Underground Piping ITM & 5-Year Underground Flow Testing 12.2 Fire Hydrant Inspection, Lubrication & Annual Drainage Operational Tests 12.3 NFPA 291 Water Flow Testing: Layout, Pitot Readings & Flow Math 12.4 Hydrant Classification, Color Coding & Available Flow Extrapolation at 20 psi Residual
13 Chapter 13: Water Storage Tanks
13.1 Tank Types (Suction, Elevated, Pressure) & Component Overview 13.2 Inspection Frequencies: Water Level, Temperature (Min 40°F), Exterior & Interior 13.3 Tank Heating Systems, Low-Water Alarms, Vents, Overflow & Anti-Vortex Plates
14 Chapter 14: Internal Pipe Assessment & Obstruction Triggers
14.1 NFPA 25 Five-Year Internal Piping Assessment Procedures & Non-Destructive Testing 14.2 The Sixteen NFPA 25 (2023) Obstruction-Investigation Triggers 14.3 Five-Location Obstruction Examination, Evidence, and Required Follow-Up
15 Chapter 15: Flushing Methods, Contaminants & Deficiency Classification
15.1 Obstruction Materials: Corrosion, MIC Indicators, Scale, Ice, and Foreign Debris 15.2 Hydraulic Flushing: Program Scope, Velocity Calculations, and Completion Evidence 15.3 Specialist Cleaning Methods: Suitability, Safety Controls, and Restoration 15.4 Classifying Findings: Impairments vs. Critical Deficiencies vs. Noncritical Deficiencies
11.3 Pump Performance Evaluation: Net/Gross Curves and the Complete Acceptance Criteria
Key Takeaways Explain This Topic AI
All four acceptance conditions apply: system demand, rated flow, 95% net-pressure comparison, and adequate permissible suction supply.
The 95% comparison permits the specified manufacturer, original unadjusted field, or nameplate-generated curve.
Compare equivalent flow points and retain raw data with any applicable speed/velocity corrections.
Failure to supply maximum system demand is an impairment; do not overspeed an engine to force a pass.
Last updated: October 2026
Evaluate pump condition and delivered system demand
NFPA 25 (2023), 8.3.7, evaluates both the pump assembly and its connected supply. Net performance helps assess what the pump adds. Gross performance establishes what is available to meet the connected system demand. A pump can retain its net curve while a deteriorated supply makes the overall installation inadequate. Conversely, a high municipal pressure can hide a weak pump if only the discharge gauge is considered.
Qualified personnel interpret the results. Obtain the original manufacturer's curve, original unadjusted field curve, nameplate data, prior tests, and owner-provided system demand. Use comparable flows and apply speed and velocity-pressure adjustments where applicable. Preserve the unadjusted measurements as well as any corrected values so the conclusion can be checked independently.
The four acceptance conditions
Under 8.3.7.2.3, all four conditions must be satisfied: the pump meets the flow and pressure requirements of the most demanding supplied systems from owner-provided design information; it supplies 100% of rated flow; net pressure at each flow point is at least 95% of one of the permitted reference curves; and the water-supply requirements of 8.1.5 are met. The permitted curves are the original manufacturer's curve, original unadjusted field curve, or a curve generated from the fire pump nameplate.
The wording “one of” matters. Do not declare an otherwise acceptable test failed solely because it is below 95% of a higher original field curve if another permitted curve satisfies the requirement. Do not use that flexibility to ignore the other three conditions or fabricate an undocumented curve. A missing system-demand record also cannot be replaced by assuming that the largest hose outlet is the only demand.
- Acceptance element Evidence needed
- Most demanding connected system Owner-provided design demand and gross delivery
- Rated flow Measured capacity at least 100% rated
- Net pressure At least 95% of an allowed reference curve at each applicable flow point
- Suction supply Required flow at the applicable permissible suction condition
- Net pressure calculation
For a simplified horizontal-pump example with gauges at equivalent elevations and negligible velocity-head difference, net pressure equals discharge pressure minus suction pressure. A discharge of 138 psi and suction of 36 psi give 102 psi net. Those assumptions must be stated. Elevation and velocity differences can require corrections, and a vertical turbine arrangement requires appropriate reference to the pumping water level rather than blindly subtracting a fictitious suction gauge.
For a negative suction gauge reading, subtracting a negative number adds its magnitude: 90 − (−4) = 94 psi in the simplified example. That arithmetic does not establish that negative suction is permissible at the installation. Section 8.1.5 addresses supply requirements and qualifying existing arrangements. Observe the actual allowable condition and do not force flow into unsafe suction merely to obtain a plotted point.
Apply the 95% comparison
Assume an allowed reference curve shows 100 psi net at a particular measured flow. The 95% threshold is 0.95 × 100 = 95 psi. A valid comparable 96 psi result meets that element; 94 psi does not meet it against that curve. The percentage reduction from a reference pressure is (reference − measured) / reference × 100. Thus, 100 to 94 is a 6% reduction, not 94% degradation.
Compare at the same flow. If one result is at 1,000 gpm and another at 1,200 gpm, directly dividing the pressures can misrepresent condition because the pump curve slopes. Use the appropriate curve interpretation. Do not simply compare each year's maximum discharge pressure or choose the most favorable isolated point while ignoring the others.
Speed corrections explain, not excuse
For an applicable centrifugal-pump comparison, flow scales with speed and head with speed squared. To normalize a measured point to a reference speed, the approximate factors are reference speed/measured speed for flow and its square for head. For 1,770 rpm reference and 1,750 rpm measured, the flow factor is about 1.0114 and the head factor about 1.0230. Both coordinates move; pressure correction alone can put a point at the wrong flow.
Apply these relationships only within their valid use and the standard's procedure. NFPA 25 expressly prohibits increasing engine speed beyond rated pump speed as a method of meeting rated performance. A technician must correct the actual cause of unacceptable output, not overspeed the equipment or erase unfavorable raw readings.
Action on unacceptable results
Notify the owner in writing and investigate the cause. Failure to provide maximum system demand is an impairment. Degraded performance that still provides maximum demand is a noncritical deficiency under the stated provision; excessive vibration or worn/loose components have their own deficiency implications. Do not classify every 5% curve difference as the same critical deficiency regardless of demand.
Investigate instrument accuracy, supply condition, valve positions, speed, mechanical wear, and the applicable driver observations. Complete correction, retest as required, and notify the owner of the work completed. Keep the raw data, demand information, selected reference curve, adjustment method, and written conclusion together. A graph with no units or unidentified curve cannot support a reliable pass decision.
Source checked October 19, 2026: NFPA 25 (2023), 8.1.5, 8.3.7, and 8.4.