Study guide

10.3 Pressure-Maintenance Pumps: Purpose, Capacity, and Coordinated Settings

NICET Inspection and Testing of Water-Based Systems Level II Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Personal Safety, PPE & Equipment

1.1 PPE Requirements & Maintenance 1.2 Tool Safety, Electrical Safety & Stored-Energy Hazards in Charged Piping 1.3 Environmental Hazards, Hazardous Materials & Worksite Illumination

2 Chapter 2: High-Hazard Safety: LOTO, Confined Space & Working at Heights

2.1 Lockout/Tagout (LOTO) Procedures 2.2 Permit-Required Confined Spaces & Atmospheric Testing 2.3 Ladder Safety, Scaffolding & Aerial Lifts

3 Chapter 3: Customer Coordination & Pre-Inspection Scope

3.1 Pre-Inspection Review, Scope of Work & Scheduling 3.2 Stakeholder Notifications: Owners, Designated Representatives & Facility Operations 3.3 Safety Impairment Procedures & Site-Specific Hazard Protocols

4 Chapter 4: Stakeholder Notification, Reporting & Impairment Procedures

4.1 Central Station Alarm Monitoring & AHJ Notifications Before/After Testing 4.2 NFPA 25 Chapter 15 Impairment Program: Coordinator, Tagging & Fire Watch Rules 4.3 ITM Documentation, Record Retention & Delivering Deficiency Reports

5 Chapter 5: Wet Sprinkler Systems ITM

5.1 Gauges, Control Valves & Visual Inspection Frequencies 5.2 Waterflow Alarm Devices: Vane-Type Paddle Switches & Mechanical Gongs 5.3 Main Drain Test Procedure & the 10% Pressure Drop Rule 5.4 Sprinkler Head Inspection, Clearance & Laboratory Testing Age Triggers

6 Chapter 6: Wet System Specialized Components: Antifreeze & Air Vents

6.1 Antifreeze Systems: Types, Listed Solutions, Backflow Isolation & Testing Procedures 6.2 Antifreeze Solution Measurement: Refractometer / Hydrometer & Freeze-Point Verification 6.3 Automatic Air Vents & Nitrogen Inerting in Wet Systems

7 Chapter 7: Dry Pipe Systems & Specialized Equipment

7.1 Dry Pipe Valve Principles, Differential Ratios & Priming Water Level 7.2 Quick-Opening Devices (QODs): Accelerators & Exhausters Inspection and Testing 7.3 Dedicated Air Compressors, Automatic Air Maintenance Devices (AMDs) & Regulators 7.4 Nitrogen Generation Systems & Gas Separation Membranes

8 Chapter 8: Dry System Testing & Operational Verification

8.1 Annual Partial Trip Test vs. Three-Year Full Flow Trip Test 8.2 Three-Year Air-Leakage Options and Annual Air-Pressure Supervisory Testing 8.3 Dry Pipe Auxiliary Drains (Drum Drips) & Condensate Management in Freezing Weather

9 Chapter 9: Standpipe Systems & Deficiency Classification

9.1 Standpipe Classes (I, II, III), System Types & Component Visual Inspections 9.2 Standpipe 5-Year Hydrostatic & Flow Testing Requirements (500 gpm / 250 gpm) 9.3 Hose Valves, Pressure Regulating Devices (PRDs/PRVs) & FDC Inspection and Testing

10 Chapter 10: Fire Pump Systems & Drivers

10.1 Fire Pump Types (Horizontal Split Case, Vertical Turbine, End Suction) & System Arrangements 10.2 Fire Pump Drivers: Electric Motors, Diesel Engines & Controller Components 10.3 Pressure-Maintenance Pumps: Purpose, Capacity, and Coordinated Settings

11 Chapter 11: Fire Pump Inspection, Testing & Maintenance

11.1 Weekly Diesel (30-Minute) & Weekly/Monthly Electric (10-Minute) No-Flow (Churn) Tests 11.2 Annual Fire Pump Flow Test: Churn (0%), 100% Rated Flow & 150% Peak Flow 11.3 Pump Performance Evaluation: Net/Gross Curves and the Complete Acceptance Criteria 11.4 Diesel Support-System Maintenance and Electric-Pump Alternate Power

12 Chapter 12: Private Fire Service Mains & Hydrants

12.1 Underground Piping ITM & 5-Year Underground Flow Testing 12.2 Fire Hydrant Inspection, Lubrication & Annual Drainage Operational Tests 12.3 NFPA 291 Water Flow Testing: Layout, Pitot Readings & Flow Math 12.4 Hydrant Classification, Color Coding & Available Flow Extrapolation at 20 psi Residual

13 Chapter 13: Water Storage Tanks

13.1 Tank Types (Suction, Elevated, Pressure) & Component Overview 13.2 Inspection Frequencies: Water Level, Temperature (Min 40°F), Exterior & Interior 13.3 Tank Heating Systems, Low-Water Alarms, Vents, Overflow & Anti-Vortex Plates

14 Chapter 14: Internal Pipe Assessment & Obstruction Triggers

14.1 NFPA 25 Five-Year Internal Piping Assessment Procedures & Non-Destructive Testing 14.2 The Sixteen NFPA 25 (2023) Obstruction-Investigation Triggers 14.3 Five-Location Obstruction Examination, Evidence, and Required Follow-Up

15 Chapter 15: Flushing Methods, Contaminants & Deficiency Classification

15.1 Obstruction Materials: Corrosion, MIC Indicators, Scale, Ice, and Foreign Debris 15.2 Hydraulic Flushing: Program Scope, Velocity Calculations, and Completion Evidence 15.3 Specialist Cleaning Methods: Suitability, Safety Controls, and Restoration 15.4 Classifying Findings: Impairments vs. Critical Deficiencies vs. Noncritical Deficiencies

10.3 Pressure-Maintenance Pumps: Purpose, Capacity, and Coordinated Settings

Key Takeaways Explain This Topic AI

Jockey pumps handle intended small losses and are not credited as the required fire pump supply.

A capacity percentage alone is not a complete sizing requirement; verify actual flow, pressure, leakage, and approved settings.

Coordinate jockey and main-pump settings so the intended sequence occurs without exceeding equipment ratings.

Verify the approved main-controller stopping arrangement and restore automatic readiness after testing.

Last updated: October 2026

The pressure-maintenance function

A pressure-maintenance or jockey pump handles small pressure losses so that the main fire pump does not start for every minor fluctuation. It is not credited as the required fire pump supply. Its flow and pressure must fit the actual installation, including leakage, pressure range, equipment ratings, and the need for the main pump to respond to a fire demand. Do not apply a universal percentage of main-pump capacity as though it were a complete NFPA sizing calculation.

Small losses can come from temperature change, leakage, or equipment operation. Repeated jockey-pump starts are useful diagnostic information. They do not prove that every loss is harmless. A new underground leak, leaking check valve, open test connection, or damaged seal may require correction. Review the pattern and investigate the cause rather than simply raising the cut-out pressure or fitting a larger pump.

Capacity and pressure are separate

A jockey pump must have enough capacity to manage the intended small losses and enough pressure capability to reach its stop setting. A 1% capacity rule is sometimes used as a preliminary heuristic, but it is not a universal mandatory requirement and does not establish the appropriate pump for every system. The actual installation and NFPA 20 provisions govern. Avoid selecting a pump so large that it masks the demand that should initiate the main fire pump.

Pressure capability also matters. If the selected pump cannot reach its cut-out setting at the actual suction condition, it may run continuously and overheat. Compare the pump curve and supply with the required operating range. A label showing a high maximum pressure is not proof that the pump supplies the needed flow at that pressure. Conversely, a pressure-maintenance pump that reaches cut-out does not establish that the main fire pump meets its demand curve.

Coordinate start and stop settings

The normal sequence gives the jockey pump an opportunity to restore a small pressure loss before pressure reaches the main fire pump's starting point. Multiple fire pumps can have coordinated sequential starting settings. Use the approved settings, system requirements, controller capabilities, and applicable NFPA 20 guidance. Do not label one “symmetrical” set of offsets as mandatory for every installation or casually lower a main-pump start point to suppress nuisance starts.

For an arithmetic example only, assume approved settings of 165 psi jockey stop, 150 psi jockey start, and 140 psi main-pump start. The jockey operating differential is 165 − 150 = 15 psi, and the separation between jockey start and main-pump start is 150 − 140 = 10 psi. These numbers illustrate the order and differences. They are not independent design approval for another building, and component maximum working pressure must still be respected.

  • Falling-pressure event in the stated example Expected response
  • Pressure reaches 150 psi Jockey pump starts
  • Small loss is restored to 165 psi Jockey pump stops
  • Demand exceeds maintenance capacity and pressure reaches 140 psi Main fire pump starts
  • Main pump is running Stopping follows the approved main-controller arrangement

A reversed sequence can cause nuisance main-pump starts. If the main pump starts at 155 psi and the jockey pump starts at 150 psi, falling pressure reaches the main-pump setting first. Diagnose the actual settings and cause. Do not merely relabel the gauges or leave the main controller off to keep it quiet.

Main-pump stopping is a distinct function

A jockey controller ordinarily starts and stops automatically for pressure maintenance. Main fire pump controllers have their own NFPA 20 stopping requirements and permitted automatic-stop arrangements. Manual stopping is a key fire pump function, but an inspector should not claim that all approved automatic stopping is prohibited or limited to a fictional universal site category. Verify the actual approved controller configuration, required minimum run time where applicable, and manufacturer procedure.

A pressure recovery during firefighting can be temporary. Controller stopping logic must not be changed casually because the system has reached churn pressure. An annual test should verify the prescribed behavior, not teach a new control strategy. Document unexpected stopping, failure to stop as prescribed, or a controller left in an incorrect mode and arrange appropriate correction.

Observe the sequence safely

Plan the test with the owner and monitoring service, verify normal valve positions and discharge capacity, and use a controlled test connection. Record starting pressure, jockey start/stop observations, main-pump start, and the applicable controller status. Use calibrated instruments appropriate to the measurement; an imprecise installed gauge can make adjacent settings appear identical.

Any temporary isolation or controller-mode change must follow the approved procedure and impairment plan. Keep a clear list of altered positions so restoration is verified. Do not perform exposed energized controller adjustments during routine ITM. Use external controls as intended and refer other work to qualified personnel. A technician should not defeat alarm supervision simply to keep the test quiet.

Afterward, restore automatic mode, normal sensing and supply paths, and all valve positions. Check for leaks, overheating, unresolved cycling, and abnormal indications. Confirm that monitoring is normal and that responsible parties know the final status. Preserve the measured values for comparison at the next visit. If a pump cycles more often than before, a trend record can help distinguish a pressure-setting issue from a developing leak.

Sources checked October 19, 2026: NFPA 20 (2022), pressure-maintenance and controller provisions; NFPA 25 (2023), Chapter 8.