Study guide
9.3 Hose Valves, Pressure Regulating Devices (PRDs/PRVs) & FDC Inspection and Testing
NICET Inspection and Testing of Water-Based Systems Level II Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Personal Safety, PPE & Equipment
1.1 PPE Requirements & Maintenance 1.2 Tool Safety, Electrical Safety & Stored-Energy Hazards in Charged Piping 1.3 Environmental Hazards, Hazardous Materials & Worksite Illumination
2 Chapter 2: High-Hazard Safety: LOTO, Confined Space & Working at Heights
2.1 Lockout/Tagout (LOTO) Procedures 2.2 Permit-Required Confined Spaces & Atmospheric Testing 2.3 Ladder Safety, Scaffolding & Aerial Lifts
3 Chapter 3: Customer Coordination & Pre-Inspection Scope
3.1 Pre-Inspection Review, Scope of Work & Scheduling 3.2 Stakeholder Notifications: Owners, Designated Representatives & Facility Operations 3.3 Safety Impairment Procedures & Site-Specific Hazard Protocols
4 Chapter 4: Stakeholder Notification, Reporting & Impairment Procedures
4.1 Central Station Alarm Monitoring & AHJ Notifications Before/After Testing 4.2 NFPA 25 Chapter 15 Impairment Program: Coordinator, Tagging & Fire Watch Rules 4.3 ITM Documentation, Record Retention & Delivering Deficiency Reports
5 Chapter 5: Wet Sprinkler Systems ITM
5.1 Gauges, Control Valves & Visual Inspection Frequencies 5.2 Waterflow Alarm Devices: Vane-Type Paddle Switches & Mechanical Gongs 5.3 Main Drain Test Procedure & the 10% Pressure Drop Rule 5.4 Sprinkler Head Inspection, Clearance & Laboratory Testing Age Triggers
6 Chapter 6: Wet System Specialized Components: Antifreeze & Air Vents
6.1 Antifreeze Systems: Types, Listed Solutions, Backflow Isolation & Testing Procedures 6.2 Antifreeze Solution Measurement: Refractometer / Hydrometer & Freeze-Point Verification 6.3 Automatic Air Vents & Nitrogen Inerting in Wet Systems
7 Chapter 7: Dry Pipe Systems & Specialized Equipment
7.1 Dry Pipe Valve Principles, Differential Ratios & Priming Water Level 7.2 Quick-Opening Devices (QODs): Accelerators & Exhausters Inspection and Testing 7.3 Dedicated Air Compressors, Automatic Air Maintenance Devices (AMDs) & Regulators 7.4 Nitrogen Generation Systems & Gas Separation Membranes
8 Chapter 8: Dry System Testing & Operational Verification
8.1 Annual Partial Trip Test vs. Three-Year Full Flow Trip Test 8.2 Three-Year Air-Leakage Options and Annual Air-Pressure Supervisory Testing 8.3 Dry Pipe Auxiliary Drains (Drum Drips) & Condensate Management in Freezing Weather
9 Chapter 9: Standpipe Systems & Deficiency Classification
9.1 Standpipe Classes (I, II, III), System Types & Component Visual Inspections 9.2 Standpipe 5-Year Hydrostatic & Flow Testing Requirements (500 gpm / 250 gpm) 9.3 Hose Valves, Pressure Regulating Devices (PRDs/PRVs) & FDC Inspection and Testing
10 Chapter 10: Fire Pump Systems & Drivers
10.1 Fire Pump Types (Horizontal Split Case, Vertical Turbine, End Suction) & System Arrangements 10.2 Fire Pump Drivers: Electric Motors, Diesel Engines & Controller Components 10.3 Pressure-Maintenance Pumps: Purpose, Capacity, and Coordinated Settings
11 Chapter 11: Fire Pump Inspection, Testing & Maintenance
11.1 Weekly Diesel (30-Minute) & Weekly/Monthly Electric (10-Minute) No-Flow (Churn) Tests 11.2 Annual Fire Pump Flow Test: Churn (0%), 100% Rated Flow & 150% Peak Flow 11.3 Pump Performance Evaluation: Net/Gross Curves and the Complete Acceptance Criteria 11.4 Diesel Support-System Maintenance and Electric-Pump Alternate Power
12 Chapter 12: Private Fire Service Mains & Hydrants
12.1 Underground Piping ITM & 5-Year Underground Flow Testing 12.2 Fire Hydrant Inspection, Lubrication & Annual Drainage Operational Tests 12.3 NFPA 291 Water Flow Testing: Layout, Pitot Readings & Flow Math 12.4 Hydrant Classification, Color Coding & Available Flow Extrapolation at 20 psi Residual
13 Chapter 13: Water Storage Tanks
13.1 Tank Types (Suction, Elevated, Pressure) & Component Overview 13.2 Inspection Frequencies: Water Level, Temperature (Min 40°F), Exterior & Interior 13.3 Tank Heating Systems, Low-Water Alarms, Vents, Overflow & Anti-Vortex Plates
14 Chapter 14: Internal Pipe Assessment & Obstruction Triggers
14.1 NFPA 25 Five-Year Internal Piping Assessment Procedures & Non-Destructive Testing 14.2 The Sixteen NFPA 25 (2023) Obstruction-Investigation Triggers 14.3 Five-Location Obstruction Examination, Evidence, and Required Follow-Up
15 Chapter 15: Flushing Methods, Contaminants & Deficiency Classification
15.1 Obstruction Materials: Corrosion, MIC Indicators, Scale, Ice, and Foreign Debris 15.2 Hydraulic Flushing: Program Scope, Velocity Calculations, and Completion Evidence 15.3 Specialist Cleaning Methods: Suitability, Safety Controls, and Restoration 15.4 Classifying Findings: Impairments vs. Critical Deficiencies vs. Noncritical Deficiencies
9.3 Hose Valves, Pressure Regulating Devices (PRDs/PRVs) & FDC Inspection and Testing
Key Takeaways Explain This Topic AI
A restriction reduces flowing pressure but cannot control static pressure; a suitable reducing valve controls both.
Pressure-control tests use the applicable device category, required flow, and inlet/outlet readings.
Inspect FDCs quarterly, with the specified annual interior allowance for approved locking caps/plugs.
FDC-to-check-valve piping is hydrostatically tested at 150 psi for two hours at least every five years under 13.8.5.
Last updated: October 2026
Pressure regulation and restriction
A standpipe hose connection can need pressure control because lower floors experience higher static pressure than upper floors. Identify the device from its listing, model, approved setting, and records. Pressure-regulating device is a broad term. A simple restricting device and a pressure-reducing valve do not behave the same way, and their names must not be used interchangeably when evaluating static pressure.
A fixed restriction creates a pressure loss while water flows. With no flow, that friction loss disappears and pressures can equalize. A listed pressure-reducing valve can control downstream static and flowing pressure within its design range. A restriction therefore cannot solve an excessive static-pressure problem merely because a single flow test produces a lower reading. The required pressure limits depend on the hose connection, class, approved design, and adopted installation provisions; there is no universal 100 psi maximum residual pressure for every Class I connection.
Inspect and test the actual device
Check pressure-regulating devices for damage, leakage, missing parts, incorrect settings or seals, and the required normal position. For hose-connection pressure-regulating devices, inspect annually, conduct the applicable annual partial-flow test of reducing valves, and perform five-year full-flow testing. Sprinkler pressure-reducing valves instead have quarterly inspection, annual partial-flow, and five-year full-flow requirements. Master pressure-regulating devices have weekly inspection, quarterly partial-flow, and annual full-flow requirements. Apply the exact Chapter 13 category. Confirm the specific table and subsection rather than applying one test to every hose valve, master pressure-reducing assembly, or sprinkler pressure-reducing valve.
The full-flow test must establish performance at the required flow with suitable inlet and outlet measurements. A static reading alone does not show whether a valve can deliver the design demand. Record flow, inlet pressure, outlet pressure, device identification, and settings. Use manufacturer and approved design criteria; do not invent a universal ±10% acceptance band. Secure hoses and arrange drainage before increasing flow. Coordinate any changes with the owner and qualified personnel, then retest and document the restored configuration.
For example, a restricting device shows 240 psi on both sides with no flow and reduces outlet pressure during a test stream. Its behavior is consistent with a restriction, not proof of a defective pressure-reducing mechanism. If the approved installation needs static pressure reduction, that is a consequential mismatch requiring evaluation. Conversely, a reducing valve that creeps to excessive downstream static pressure can have a seat or pilot problem even if its flowing reading appears acceptable.
Fire department connections
The FDC allows apparatus to supplement or supply the system according to its design. Identify what it serves: sprinkler, standpipe, or a combined arrangement. Check signage and location against the actual system. A connection labeled for the wrong building or zone can defeat the responding crew's intended water supply even when its brass fittings look new.
NFPA 25 (2023), 13.8, requires quarterly FDC inspection. Verify visibility and access, free and undamaged couplings or swivels, caps/plugs and gaskets, signs, check-valve leakage, the automatic drain, inlet clappers, internal obstructions, and visible piping condition. Approved locking caps/plugs permit the applicable annual interior-inspection interval; that does not eliminate all the other quarterly checks. Remove obstructions through an appropriate procedure and replace or repair components as needed.
- Finding Why it matters Appropriate response
- Seized swivel or damaged threads Hose attachment can fail Arrange repair and verify compatibility
- Missing gasket or cap Leakage or debris entry Restore the correct listed component
- Plugged automatic drain Water can remain and freeze Evaluate leakage and restore drainage
- Incorrect identification Apparatus can supply the wrong system Verify records and correct the sign
- Drainage and check valves
An automatic ball drip at the low point between the inlet and check valve drains water that would otherwise remain in normally dry FDC piping. Do not plug it because it drips. Find and correct the upstream leakage or drain problem. A plugged drain can leave water subject to freezing. Follow the installed configuration; not every ball-drip body has the same mounting details.
The FDC inspection includes looking for check-valve leakage, but Chapter 13 check-valve internal inspection is generally five-year, not an invented annual disassembly of every FDC check valve. Manage the impairment, isolate and depressurize correctly, and use the actual component procedure. An inspection port does not make it safe to open a pressurized assembly.
Five-year FDC piping test
Under 13.8.5, test the piping from the FDC to its check valve at 150 psi for two hours at least every five years. Do not replace that criterion with the standpipe hydrostatic criterion of 200 psi or working pressure plus 50 psi. Standpipe testing can impose its own applicable requirements on a different test scope. Define the boundaries and component ratings before testing.
A proposed allowance discussed in a later NFPA revision cycle is not automatically part of the 2023 examination reference. Do not skip the test solely because the piping is short or visible without an applicable adopted provision. Record pressure, duration, leaks, tested boundaries, and restoration. Confirm that isolations, drains, control valves, caps, and monitoring are returned to normal and report actual remaining deficiencies promptly.
Source checked October 19, 2026: NFPA 25 (2023), 13.4.2, 13.5, and 13.8; apply the installed regulating-device instructions and approved design.
Ordinary hose valves have quarterly condition inspections under 13.6. Exercise Class I/III hose valves fully open and closed annually; applicable Class II and sprinkler-attached hose-station valves use the three-year operation test. These common-component tasks are separate from Chapter 6’s annual cabinet and standpipe component survey.