Study guide
6.1 Antifreeze Systems: Types, Listed Solutions, Backflow Isolation & Testing Procedures
NICET Inspection and Testing of Water-Based Systems Level II Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Personal Safety, PPE & Equipment
1.1 PPE Requirements & Maintenance 1.2 Tool Safety, Electrical Safety & Stored-Energy Hazards in Charged Piping 1.3 Environmental Hazards, Hazardous Materials & Worksite Illumination
2 Chapter 2: High-Hazard Safety: LOTO, Confined Space & Working at Heights
2.1 Lockout/Tagout (LOTO) Procedures 2.2 Permit-Required Confined Spaces & Atmospheric Testing 2.3 Ladder Safety, Scaffolding & Aerial Lifts
3 Chapter 3: Customer Coordination & Pre-Inspection Scope
3.1 Pre-Inspection Review, Scope of Work & Scheduling 3.2 Stakeholder Notifications: Owners, Designated Representatives & Facility Operations 3.3 Safety Impairment Procedures & Site-Specific Hazard Protocols
4 Chapter 4: Stakeholder Notification, Reporting & Impairment Procedures
4.1 Central Station Alarm Monitoring & AHJ Notifications Before/After Testing 4.2 NFPA 25 Chapter 15 Impairment Program: Coordinator, Tagging & Fire Watch Rules 4.3 ITM Documentation, Record Retention & Delivering Deficiency Reports
5 Chapter 5: Wet Sprinkler Systems ITM
5.1 Gauges, Control Valves & Visual Inspection Frequencies 5.2 Waterflow Alarm Devices: Vane-Type Paddle Switches & Mechanical Gongs 5.3 Main Drain Test Procedure & the 10% Pressure Drop Rule 5.4 Sprinkler Head Inspection, Clearance & Laboratory Testing Age Triggers
6 Chapter 6: Wet System Specialized Components: Antifreeze & Air Vents
6.1 Antifreeze Systems: Types, Listed Solutions, Backflow Isolation & Testing Procedures 6.2 Antifreeze Solution Measurement: Refractometer / Hydrometer & Freeze-Point Verification 6.3 Automatic Air Vents & Nitrogen Inerting in Wet Systems
7 Chapter 7: Dry Pipe Systems & Specialized Equipment
7.1 Dry Pipe Valve Principles, Differential Ratios & Priming Water Level 7.2 Quick-Opening Devices (QODs): Accelerators & Exhausters Inspection and Testing 7.3 Dedicated Air Compressors, Automatic Air Maintenance Devices (AMDs) & Regulators 7.4 Nitrogen Generation Systems & Gas Separation Membranes
8 Chapter 8: Dry System Testing & Operational Verification
8.1 Annual Partial Trip Test vs. Three-Year Full Flow Trip Test 8.2 Three-Year Air-Leakage Options and Annual Air-Pressure Supervisory Testing 8.3 Dry Pipe Auxiliary Drains (Drum Drips) & Condensate Management in Freezing Weather
9 Chapter 9: Standpipe Systems & Deficiency Classification
9.1 Standpipe Classes (I, II, III), System Types & Component Visual Inspections 9.2 Standpipe 5-Year Hydrostatic & Flow Testing Requirements (500 gpm / 250 gpm) 9.3 Hose Valves, Pressure Regulating Devices (PRDs/PRVs) & FDC Inspection and Testing
10 Chapter 10: Fire Pump Systems & Drivers
10.1 Fire Pump Types (Horizontal Split Case, Vertical Turbine, End Suction) & System Arrangements 10.2 Fire Pump Drivers: Electric Motors, Diesel Engines & Controller Components 10.3 Pressure-Maintenance Pumps: Purpose, Capacity, and Coordinated Settings
11 Chapter 11: Fire Pump Inspection, Testing & Maintenance
11.1 Weekly Diesel (30-Minute) & Weekly/Monthly Electric (10-Minute) No-Flow (Churn) Tests 11.2 Annual Fire Pump Flow Test: Churn (0%), 100% Rated Flow & 150% Peak Flow 11.3 Pump Performance Evaluation: Net/Gross Curves and the Complete Acceptance Criteria 11.4 Diesel Support-System Maintenance and Electric-Pump Alternate Power
12 Chapter 12: Private Fire Service Mains & Hydrants
12.1 Underground Piping ITM & 5-Year Underground Flow Testing 12.2 Fire Hydrant Inspection, Lubrication & Annual Drainage Operational Tests 12.3 NFPA 291 Water Flow Testing: Layout, Pitot Readings & Flow Math 12.4 Hydrant Classification, Color Coding & Available Flow Extrapolation at 20 psi Residual
13 Chapter 13: Water Storage Tanks
13.1 Tank Types (Suction, Elevated, Pressure) & Component Overview 13.2 Inspection Frequencies: Water Level, Temperature (Min 40°F), Exterior & Interior 13.3 Tank Heating Systems, Low-Water Alarms, Vents, Overflow & Anti-Vortex Plates
14 Chapter 14: Internal Pipe Assessment & Obstruction Triggers
14.1 NFPA 25 Five-Year Internal Piping Assessment Procedures & Non-Destructive Testing 14.2 The Sixteen NFPA 25 (2023) Obstruction-Investigation Triggers 14.3 Five-Location Obstruction Examination, Evidence, and Required Follow-Up
15 Chapter 15: Flushing Methods, Contaminants & Deficiency Classification
15.1 Obstruction Materials: Corrosion, MIC Indicators, Scale, Ice, and Foreign Debris 15.2 Hydraulic Flushing: Program Scope, Velocity Calculations, and Completion Evidence 15.3 Specialist Cleaning Methods: Suitability, Safety Controls, and Restoration 15.4 Classifying Findings: Impairments vs. Critical Deficiencies vs. Noncritical Deficiencies
6.1 Antifreeze Systems: Types, Listed Solutions, Backflow Isolation & Testing Procedures
Key Takeaways Explain This Topic AI
NFPA 25 (2023) includes exceptions for acceptable existing factory premix and certain listed ESFR applications.
The existing-solution limits are 30% propylene glycol or 38% glycerin by volume, with the other applicable conditions still required.
For listed solution sampling and refill, follow the manufacturer’s instructions under 5.3.4.2.2.
Unknown or unacceptable solution cannot be approved solely from a cold freeze-point reading.
Last updated: October 2026
Identify the solution before judging the system
An antifreeze system is a wet sprinkler arrangement using a solution that remains usable at the expected low temperature. Its inspection involves more than reading a freeze-point scale. The technician must establish the product or acceptable existing formulation, system materials, temperature exposure, sampling requirements, and any conditions governing continued use.
NFPA 25 (2023), 5.3.4 , is the controlling exam provision. Earlier transition notices emphasized a September 30, 2022 deadline for listed solutions. The published 2023 edition includes exceptions, so “every unlisted solution is prohibited after 2022” is not an accurate rule for this exam.
Listed solutions and the existing-solution exceptions
Listed antifreeze is the general requirement. Under 5.3.4.4.2 , an existing factory-premixed solution may remain where concentration is limited to 30% propylene glycol by volume or 38% glycerin by volume . This is not permission to mix concentrate in the field, add an unknown product, or refill any system with a legacy mixture. Its identity, concentration, freeze protection, and applicability still need to be established.
Under 5.3.4.4.3 , a specific application involving ESFR sprinklers listed for use with premixed propylene glycol above 30% has a separate provision. Verify that actual listing rather than generalizing it to ordinary sprinklers. The standard also addresses the use of listed replacement solution outside certain listing limitations while retaining the temperature-range limitation. Read the complete applicable paragraph before deciding whether an existing arrangement can remain.
- Finding Required reasoning
- Identified listed product Apply product instructions and the relevant NFPA 25 provisions
Identified existing factory premix within the exception Verify concentration and adequate freeze protection before accepting continued use
Unknown solution Resolve identity; where it cannot be reliably determined, apply the drain-and-refill requirement
Excess legacy concentration Do not approve from a cold freeze point alone; evaluate whether a specific permitted exception actually applies
Material compatibility matters
The solution must suit the system materials. CPVC provisions are particularly important: NFPA 25 allows a listed solution or the permitted glycerin arrangement, while specifically prohibiting diethylene, ethylene, and propylene glycols under that provision. Do not infer compatibility from a generic “food grade” description or from the product's broad chemical family. Obtain the actual listed product documentation and pipe manufacturer's requirements.
A product's listing can include occupancy, sprinkler, volume, material, pressure, and temperature limits. The standard's existing-system provisions must be read together with those details. Do not assume all listed products provide the same minimum temperature or that more concentrated fluid is necessarily safer. Fire behavior, viscosity, compatibility, and hydraulic performance matter as well as freezing.
Understand the hydraulic arrangement
Identify the supply connection, isolation valve, check or backflow equipment, expansion arrangement, fill point, and sampling points. Cross-connection protection follows applicable health and plumbing requirements and the approved installation. An RPZ is not a universal answer for every arrangement, and the inspector must not redesign that connection from a generic sketch.
Temperature changes can expand trapped fluid. Check the installed expansion or relief arrangement against its approved design and product instructions. A universal 175 psi relief setting is inappropriate when component ratings or the approved design require something different. Investigate leakage and abnormal pressure without closing or plugging a relief discharge to hide the symptom.
Annual sampling before freezing
Test at the onset of the heating season under 5.3.4. Establish the type of solution from reliable records and testing. The sampling provisions address top and bottom locations and additional remote or supply-interface locations where those are not already represented. For systems over 150 gallons, the provision calls for an additional point for each 100 gallons, subject to the listed-solution manufacturer provision. For listed solutions, follow the manufacturer's specified number of test points and refill procedure under 5.3.4.2.2.
Do not equate “remote” with “highest” in every building. A remote portion can be lower or at an intermediate elevation. Identify actual sampling locations on the system drawing and report. Collect representative samples without uncontrolled withdrawal that draws fresh water into the loop and dilutes it. Record the location and measured result for each sample rather than averaging a warm, diluted sample into a colder acceptable one.
Evaluate and correct failures
Use an instrument and scale calibrated for the actual solution. Compare every result with the applicable concentration or product specification and the temperature required at the protected location. A sufficiently cold reading does not establish that an unknown chemical is acceptable, and an acceptable concentration does not establish adequate freeze protection for every climate.
When a sample has an incorrect freeze point, the standard requires complete draining and refilling with a listed or otherwise acceptable solution under 5.3.4.4. Follow the listed product's refill and flushing instructions. Never improvise a correction by injecting raw concentrate or adding water. Capture removed fluid and arrange disposal through the applicable receiving authority and product requirements.
Example: an existing premix
An existing system has reliable records identifying a factory-premixed 30% propylene glycol solution. Its annual samples meet the applicable concentration and protected-space temperature requirements. It cannot be rejected solely because it lacks a listing and the calendar is after September 2022. Evaluate the 2023 existing-solution exception and all applicable conditions. In contrast, an unknown field mix with a low measured freeze point does not gain that exception just because its reading looks cold enough.
Document solution identity, locations, results, criteria, deficiencies, corrective work, and restored system status. Keep the antifreeze information sign accurate and preserve records for future identification.
Sources checked October 19, 2026: NFPA 25 (2023), 5.3.4; NFPA's 2023 antifreeze fact sheet .