Study guide
2.2 Contractor Surety Bonds (NRS 624.270) & Cash Deposit Rules
Nevada General Contractor Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Nevada State Contractors Board & Licensing Law
1.1 Nevada Contractor Exams: CMS and Class B Trade Exam Format, Outline & References 1.2 NSCB Regulatory Framework, NRS 624 Scope & Contractor Definitions 1.3 License Classifications (A, B, C, AB) & Qualifying Party Requirements 1.4 License Maintenance, Biennial Renewal, Inactive Status & Business Changes
2 Chapter 2: Financial Limits, Bonding & Residential Recovery Fund
2.1 Monetary License Limits, Financial Statements & Limit Increases 2.2 Contractor Surety Bonds (NRS 624.270) & Cash Deposit Rules 2.3 Residential Recovery Fund (NRS 624.400–624.560): Eligibility, Assessments & Payouts
3 Chapter 3: Unlawful Conduct, Citations & Disciplinary Procedures
3.1 Unlawful Advertising, Unlicensed Contracting Penalties & Criminal Sanctions 3.2 Administrative Citations, Fines, Disciplinary Hearings & License Revocation
4 Chapter 4: Construction Contracts & Nevada Residential Disclosures
4.1 Essential Contract Elements, Agreement Types & Standard Construction Clauses 4.2 Nevada Residential Contract Requirements & Disclosures (NRS 624.520, 624.600 & 624.970) 4.3 Subcontractor Agreements, Flow-Down Provisions & Independent Contractor Status
5 Chapter 5: Change Orders, Prompt Payment & Dispute Resolution
5.1 Change Orders, Written Authorization Rules & Constructive Changes 5.2 Nevada Prompt Payment Law (NRS 624.606–624.630), Pay-If-Paid & Retention 5.3 Nevada Construction Defect Law (NRS Chapter 40) & Dispute Resolution
6 Chapter 6: Nevada Mechanics' Lien Law
6.1 Statutory Lien Rights, Property Subject to Lien & Excluded Work 6.2 Notice of Right to Lien (31-Day Coverage), Notice of Nonresponsibility & 15-Day Notice of Intent to Lien 6.3 Recording the Notice of Lien (90-Day Rule), Priority, Statutory Waivers & 6-Month Foreclosure Suits
7 Chapter 7: Estimating, Bidding Strategy & Public Works
7.1 Quantity Takeoff, Direct Costs, Material & Labor Estimating 7.2 Overhead Allocation, Profit Margins & Markup Calculations 7.3 Competitive Bidding Strategy, Public Works Bidding (NRS 338) & Bid Bonds
8 Chapter 8: Project Management, CPM Scheduling & Quality Control
8.1 Project Planning, Work Breakdown Structures & Critical Path Method (CPM) Scheduling 8.2 Jobsite Logistics, Submittals, Daily Logs & Progress Tracking 8.3 Quality Control, Building Inspections, Warranties & Project Closeout
9 Chapter 9: Nevada Safety, NVOSHA & Mandatory Safety Cards
9.1 Nevada OSHA (NVOSHA) Framework, Inspections, Citations & Recordkeeping 9.2 Nevada Mandatory 10-Hour & 30-Hour Construction Safety Cards (NRS 618.983) 9.3 Personal Protective Equipment, Hazard Communication & Environmental Health Hazards
10 Chapter 10: Construction Site Safety, Excavation & Nevada One Call
10.1 Fall Protection, Scaffolding & Ladder Safety (29 CFR 1926 Subparts L, M, X) 10.2 Excavation, Trenching, Soil Classification & Shoring (29 CFR 1926 Subpart P) 10.3 Nevada One Call / USA North 811 & Underground Utility Damage Prevention
11 Chapter 11: Risk Management, Insurance & Construction Bonds
11.1 Commercial General Liability (CGL) & Builder's Risk Insurance 11.2 Nevada Workers' Compensation (NRS 616A–616D Industrial Insurance) 11.3 Construction Surety Bonds: Bid, Performance, Payment & Maintenance Bonds
12 Chapter 12: Construction Accounting, Financial Analysis, Taxes & Labor Law
12.1 Construction Accounting Methods: Cash, Accrual & Percentage of Completion 12.2 Financial Statements, Balance Sheet Ratios & Cash Flow Management 12.3 Federal & Nevada State Taxes: FICA, FUTA, MBT, Commerce Tax & Sales/Use Tax 12.4 Nevada & Federal Labor Laws: Minimum Wage, Overtime, Final Pay & Paid Leave
13 Chapter 13: Building Codes, Plan Reading & Sitework
13.1 Building Codes (IBC/IRC), Permits & Inspection Sequence 13.2 Architectural & Structural Plan Reading, Scale & Symbol Conventions 13.3 Sitework, Grading, Soil Mechanics & Foundation Layout
14 Chapter 14: Concrete, Masonry & Metals
14.1 Concrete Materials, Field Testing, Formwork & Reinforcing Steel 14.2 Concrete Placement, Finishing, Joints, Curing & Post-Tensioning 14.3 Masonry: CMU, Mortar, Grout, Veneer & Wall Bracing 14.4 Structural Steel, Bolting, Welding, Joists, Light-Gauge Framing & Subpart R
15 Chapter 15: Carpentry, Thermal & Moisture Protection, Openings & Finishes
15.1 Wood Framing & Carpentry: Lumber, Engineered Wood, Anchorage & Shear Walls 15.2 Thermal & Moisture Protection: WRBs, Stucco, Insulation, Vapor Control & Roofing 15.3 Doors, Windows & Hardware: Fire Doors, Accessibility, Glazing & Flashing 15.4 Drywall & Finishes: Gypsum Board, GA-214 Levels, Ceilings, Tile & Paint
2.2 Contractor Surety Bonds (NRS 624.270) & Cash Deposit Rules
Key Takeaways Explain This Topic AI
NRS 624.270 requires every licensee to file a surety bond or cash deposit of not less than $1,000 nor more than $500,000, fixed by the Board based on financial and professional responsibility and the size of operations.
Under NRS 624.273, the bond protects owners damaged by nonperformance or unremoved liens, employees who worked on the site, suppliers of materials or equipment, and anyone injured by the contractor's unlawful acts.
No action may be brought on a license bond or deposit more than 2 years after the act on which it is based, and an employee's claim for labor is a preferred claim (NRS 624.273).
Under NRS 624.275, a surety may cancel a license bond on 60 days' notice by certified mail; the license is suspended or revoked on the cancellation date unless an equivalent bond or deposit is filed.
Nevada public works contracts over $100,000 require performance and payment bonds of at least 50 percent of the contract amount each under NRS 339.025, separate from the license bond.
Last updated: September 2026
Statutory Mandate for License Bonds (NRS 624.270)
Before issuing a license, the Board must require the applicant to file a surety bond in a form acceptable to the Board or establish a cash deposit instead (NRS 624.270(1)). Before each renewal, the licensee must show that the bond or deposit is in full force . Failure to file or maintain it is cause to deny, revoke, suspend or refuse to renew a license (NRS 624.270(3)).
The Three-Party Surety Relationship
A license bond is not an insurance policy for the contractor. It involves three parties:
The Principal: The licensed contractor, which must comply with NRS and NAC Chapter 624.
The Surety: A corporation authorized to transact surety business in Nevada whose long-term debt is rated "A" or better by a nationally recognized rating agency (NRS 624.270(4)).
The Obligee: The bond runs in favor of the State of Nevada for the benefit of the persons listed in NRS 624.273.
Unlike an insurer, a surety expects to be repaid. Contractors and often their owners sign a general indemnity agreement, so when the surety pays a valid claim it seeks reimbursement from the contractor.
Bond Amount and Form
Statutory Range: The bond or deposit must be not less than $1,000 or more than $500,000 (NRS 624.270(4)).
How the Amount Is Set: The Board fixes it with reference to the contractor's financial and professional responsibility and the magnitude of its operations . The NSCB says the amount depends on the type of license, the monetary limit, financial responsibility, experience and character. The required amount is announced after the license is approved and before it is issued.
Adjustments: The Board may increase or reduce the bond at renewal or after a hearing when evidence supports it. Increasing the bond is also one of the disciplinary options in NRS 624.300(1)(g).
Continuous Form: The bond must be continuous . The surety's total aggregate liability for all claims is limited to the face amount , no matter how many years the bond stays in force.
Relief After 5 Years: After a licensee has contracted in Nevada for at least 5 consecutive years , the Board may relieve it of the bond requirement on supporting evidence, and may later require a new bond (NRS 624.270(5)).
Wage-Claim Trigger: If the Labor Commissioner reports three substantiated wage claims within 2 years , the Board must require a bond or deposit in an amount it fixes (NRS 624.270(6)).
Exam Note: No statutory table ties each monetary limit to a bond amount. Know the $1,000–$500,000 range and the factors the Board weighs.
Who the License Bond Protects (NRS 624.273)
Each bond or deposit is in favor of the State for the benefit of any person who:
Owner: As the owner of the property to be improved, contracted with the contractor and was damaged by the contractor's failure to perform the contract or to remove liens filed against the property;
Employee: As an employee of the contractor, performed labor on or about the site of the construction covered by the contract;
Supplier: As a supplier or materialman, furnished materials or equipment for the construction covered by the contract; or
Injured Person: Was injured by any unlawful act or omission of the contractor in performing a contract.
Claim Rules
Time Limit: No action may be commenced on the bond or deposit 2 years after the commission of the act on which the action is based (NRS 624.273(2)).
Surety Notice: When sued on the bond, the surety must notify the Board within 30 days after it is served or the action begins, whichever is first.
Labor Claims First: An employee's claim for labor is a preferred claim . If the bond cannot pay all labor claims, the money is shared among labor claimants in proportion to their claims. Other claims share equal priority (NRS 624.273(6)–(7)).
Interpleader: The surety or the Board may interplead all claimants. Notice is published once a week for 2 weeks in the county of the contractor's principal place of business.
Board Information: On request, the Board tells a protected person whether a bond or deposit is in effect, its amount, and any pending actions.
Cash Deposits in Lieu of a Bond
Instead of buying a surety bond, a contractor may establish a cash deposit with the Board (NRS 624.270(1)(b)):
Form: The NSCB requires a cashier's check payable to the State Contractors Board for the full bond amount.
Administrative Fee: A $200 administrative fee applies to cash deposits (NAC 624.130); the NSCB describes it as a biennial fee.
Retention After the License Ends: A deposit may be withdrawn 2 years after termination of the license, or 2 years after completion of all work the Board authorized after termination, whichever is later , if no claim is outstanding (NRS 624.270(4)).
Retention After Relief: If the Board relieves a 5-year licensee of the deposit requirement, the deposit may be withdrawn 2 years after relief is granted , if no claim is outstanding (NRS 624.270(5)).
Rationale: The holding period matches the 2-year limit for bond actions in NRS 624.273.
Bond Cancellation and Suspension (NRS 624.275)
60-Day Notice: A surety may cancel a license bond by giving 60 days' notice to the Board and to the contractor by certified mail (NRS 624.275(1)(b)).
Board Warning: On receiving the notice, the Board immediately tells the contractor, at its latest address of record, that the license will be suspended or revoked unless it furnishes an equivalent bond or cash deposit before the cancellation takes effect .
Result of Non-Compliance: If the contractor does not comply, the license must be suspended or revoked on the date the bond is cancelled (NRS 624.275(5)(b)).
Claims Paid: The surety must also promptly notify the Board of claims paid on the bond. The Board then gives the contractor a deadline to restore an equivalent bond or deposit, or the license is suspended or revoked on that date.
Contracting While Suspended: Work performed while the license is suspended is work without an active license under NRS 624.700.
License Bonds vs. Construction Contract Bonds
Candidates often confuse the license bond with project bonds:
Feature License Bond (NRS 624.270) Bid Bond Performance Bond Payment Bond
Purpose Condition of licensure; protects persons listed in NRS 624.273 Bidder will sign the contract and furnish required bonds if awarded Contract will be performed according to plans and specifications Labor and material claimants will be paid
Required By Nevada State Contractors Board Owner or public agency in bid documents Owner; NRS 339.025 on public works over $100,000 Owner; NRS 339.025 on public works over $100,000
Scope All of the licensee's operations One bid One contract One contract
Amount $1,000 to $500,000, set by the Board Set by bid documents (commonly 5% to 10% of the bid) Public works: set by the agency, at least 50% of the contract Public works: set by the agency, at least 50% of the contract
Beneficiary Owners, employees, suppliers, injured persons Owner Owner or contracting body Claimants supplying labor or materials
Public Works Bonds (NRS Chapter 339)
Before a public works contract exceeding $100,000 is awarded (highway contracts under NRS Chapter 408 have their own rules), the contractor must furnish (NRS 339.025):
A performance bond in an amount fixed by the contracting body, not less than 50% of the contract amount , solely for the protection of the contracting body.
A payment bond in an amount fixed by the contracting body, not less than 50% of the contract amount , solely for claimants supplying labor or materials to the contractor or its subcontractors.
A claimant not paid in full 90 days after its last labor or materials may sue on the payment bond. A claimant who dealt only with a subcontractor must give the prime contractor written notice within 30 days after first furnishing and again within 90 days after last furnishing (NRS 339.035). Suit must be filed within 1 year after last furnishing (NRS 339.055). These project bonds are entirely separate from the license bond on file with the NSCB.