Study guide
1.1 Nevada Contractor Exams: CMS and Class B Trade Exam Format, Outline & References
Nevada General Contractor Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Nevada State Contractors Board & Licensing Law
1.1 Nevada Contractor Exams: CMS and Class B Trade Exam Format, Outline & References 1.2 NSCB Regulatory Framework, NRS 624 Scope & Contractor Definitions 1.3 License Classifications (A, B, C, AB) & Qualifying Party Requirements 1.4 License Maintenance, Biennial Renewal, Inactive Status & Business Changes
2 Chapter 2: Financial Limits, Bonding & Residential Recovery Fund
2.1 Monetary License Limits, Financial Statements & Limit Increases 2.2 Contractor Surety Bonds (NRS 624.270) & Cash Deposit Rules 2.3 Residential Recovery Fund (NRS 624.400–624.560): Eligibility, Assessments & Payouts
3 Chapter 3: Unlawful Conduct, Citations & Disciplinary Procedures
3.1 Unlawful Advertising, Unlicensed Contracting Penalties & Criminal Sanctions 3.2 Administrative Citations, Fines, Disciplinary Hearings & License Revocation
4 Chapter 4: Construction Contracts & Nevada Residential Disclosures
4.1 Essential Contract Elements, Agreement Types & Standard Construction Clauses 4.2 Nevada Residential Contract Requirements & Disclosures (NRS 624.520, 624.600 & 624.970) 4.3 Subcontractor Agreements, Flow-Down Provisions & Independent Contractor Status
5 Chapter 5: Change Orders, Prompt Payment & Dispute Resolution
5.1 Change Orders, Written Authorization Rules & Constructive Changes 5.2 Nevada Prompt Payment Law (NRS 624.606–624.630), Pay-If-Paid & Retention 5.3 Nevada Construction Defect Law (NRS Chapter 40) & Dispute Resolution
6 Chapter 6: Nevada Mechanics' Lien Law
6.1 Statutory Lien Rights, Property Subject to Lien & Excluded Work 6.2 Notice of Right to Lien (31-Day Coverage), Notice of Nonresponsibility & 15-Day Notice of Intent to Lien 6.3 Recording the Notice of Lien (90-Day Rule), Priority, Statutory Waivers & 6-Month Foreclosure Suits
7 Chapter 7: Estimating, Bidding Strategy & Public Works
7.1 Quantity Takeoff, Direct Costs, Material & Labor Estimating 7.2 Overhead Allocation, Profit Margins & Markup Calculations 7.3 Competitive Bidding Strategy, Public Works Bidding (NRS 338) & Bid Bonds
8 Chapter 8: Project Management, CPM Scheduling & Quality Control
8.1 Project Planning, Work Breakdown Structures & Critical Path Method (CPM) Scheduling 8.2 Jobsite Logistics, Submittals, Daily Logs & Progress Tracking 8.3 Quality Control, Building Inspections, Warranties & Project Closeout
9 Chapter 9: Nevada Safety, NVOSHA & Mandatory Safety Cards
9.1 Nevada OSHA (NVOSHA) Framework, Inspections, Citations & Recordkeeping 9.2 Nevada Mandatory 10-Hour & 30-Hour Construction Safety Cards (NRS 618.983) 9.3 Personal Protective Equipment, Hazard Communication & Environmental Health Hazards
10 Chapter 10: Construction Site Safety, Excavation & Nevada One Call
10.1 Fall Protection, Scaffolding & Ladder Safety (29 CFR 1926 Subparts L, M, X) 10.2 Excavation, Trenching, Soil Classification & Shoring (29 CFR 1926 Subpart P) 10.3 Nevada One Call / USA North 811 & Underground Utility Damage Prevention
11 Chapter 11: Risk Management, Insurance & Construction Bonds
11.1 Commercial General Liability (CGL) & Builder's Risk Insurance 11.2 Nevada Workers' Compensation (NRS 616A–616D Industrial Insurance) 11.3 Construction Surety Bonds: Bid, Performance, Payment & Maintenance Bonds
12 Chapter 12: Construction Accounting, Financial Analysis, Taxes & Labor Law
12.1 Construction Accounting Methods: Cash, Accrual & Percentage of Completion 12.2 Financial Statements, Balance Sheet Ratios & Cash Flow Management 12.3 Federal & Nevada State Taxes: FICA, FUTA, MBT, Commerce Tax & Sales/Use Tax 12.4 Nevada & Federal Labor Laws: Minimum Wage, Overtime, Final Pay & Paid Leave
13 Chapter 13: Building Codes, Plan Reading & Sitework
13.1 Building Codes (IBC/IRC), Permits & Inspection Sequence 13.2 Architectural & Structural Plan Reading, Scale & Symbol Conventions 13.3 Sitework, Grading, Soil Mechanics & Foundation Layout
14 Chapter 14: Concrete, Masonry & Metals
14.1 Concrete Materials, Field Testing, Formwork & Reinforcing Steel 14.2 Concrete Placement, Finishing, Joints, Curing & Post-Tensioning 14.3 Masonry: CMU, Mortar, Grout, Veneer & Wall Bracing 14.4 Structural Steel, Bolting, Welding, Joists, Light-Gauge Framing & Subpart R
15 Chapter 15: Carpentry, Thermal & Moisture Protection, Openings & Finishes
15.1 Wood Framing & Carpentry: Lumber, Engineered Wood, Anchorage & Shear Walls 15.2 Thermal & Moisture Protection: WRBs, Stucco, Insulation, Vapor Control & Roofing 15.3 Doors, Windows & Hardware: Fire Doors, Accessibility, Glazing & Flashing 15.4 Drywall & Finishes: Gypsum Board, GA-214 Levels, Ceilings, Tile & Paint
1.1 Nevada Contractor Exams: CMS and Class B Trade Exam Format, Outline & References
Key Takeaways Explain This Topic AI
A Nevada Class B license requires passing two PSI exams: the Contractor Management Survey (business and law) and the B General Building trade exam.
The CMS has 60 scored items plus 3 non-scored items, requires 45 correct (75%), and allows 120 minutes plus 6 minutes for the pretest items.
The B General Building trade exam has 80 questions, requires 56 correct (70%), and allows 3 hours with the 2018 IBC, ACI 318, and ACI 530 in the room.
OSHA 29 CFR 1926, SJI Technical Digest 9, the Gypsum Construction Handbook, and the PTI post-tensioning course are sources for questions but are not allowed in the exam room.
PSI charges $95 for one exam portion or $140 for two when the second is the CMS; a failed portion has a 2-week wait, and a third failure voids the application.
Last updated: September 2026
How the Nevada Class B License Exams Work
A Nevada Class B General Building license requires the qualified individual to pass two separate PSI exams. The first is the Contractor Management Survey (CMS) , the business and law exam that every classification takes. The second is the B General Building trade exam . The Nevada State Contractors Board (NSCB) decides eligibility first. Only after the Board accepts the application does PSI send the Candidate Eligibility letter and the Candidate Information Bulletin (CIB) that lets you schedule. Applicants also submit fingerprints for a state and national criminal history check.
The facts below come from PSI's Nevada contractor CIB (updated March 25, 2026). PSI and the Board can change these details, so re-check the current bulletin at test-takers.psiexams.com/nvcon before you schedule.
The Two Exam Portions at a Glance
- Feature Contractor Management Survey (CMS) B General Building Trade Exam
- Scored questions 60, plus 3 non-scored pretest items 80
- Passing score 45 correct (75%) 56 correct (70%)
- Time 120 minutes, plus 6 minutes for the non-scored items 3 hours
- Format Open book Open book
Allowed reference Construction Business and Law Manual for Nevada (PSI) IBC 2018; ACI 318-11 or 318-14; ACI 530/530.1-11 or -13
Calculator Silent, non-printing, non-programmable Same
Margin math: On the CMS you can miss at most 60 − 45 = 15 60 - 45 = 15 60 − 45 = 15 questions. On the trade exam you can miss at most 80 − 56 = 24 80 - 56 = 24 80 − 56 = 24 . The time budget is 2 minutes per CMS question ( 120 ÷ 60 120 \div 60 120 ÷ 60 ) and 2.25 minutes per trade question ( 180 ÷ 80 180 \div 80 180 ÷ 80 ). Open-book exams punish slow lookups, so practise finding tables quickly.
CMS Content Outline (60 Items)
- Subject Items Where This Guide Teaches It
- Licensing 10 Chapters 1–3
- Estimating and Bidding 7 Chapter 7
- Lien Law 3 Chapter 6
- Financial Management 12 Sections 12.1–12.2
- Tax Laws 5 Section 12.3
- Labor Laws 5 Section 12.4
- Project Management 3 Chapter 8
- Contracts 6 Chapters 4–5
- Risk Management 4 Chapter 11
- Environmental and Safety 5 Chapter 9
- B General Building Content Outline (80 Items)
- Subject Items Where This Guide Teaches It
- Sitework 6 Section 13.3
- Concrete 12 Sections 14.1–14.2
- Masonry 6 Section 14.3
- Metals 12 Section 14.4
- Carpentry 7 Section 15.1
- Thermal and Moisture Protection 9 Section 15.2
- Doors and Windows 4 Section 15.3
- Drywall and Finishes 4 Section 15.4
- Safety 5 Chapters 9–10
- Plan Reading and Estimating 12 Sections 13.1–13.2 and 7.1
- Nevada One Call 3 Section 10.3
Three subjects (Concrete, Metals, and Plan Reading and Estimating) make up 36 36 36 of the 80 80 80 trade items, or 45 % 45\% 45% . On the CMS, Financial Management and Licensing together are 22 22 22 of 60 60 60 items, about 37 % 37\% 37% . Spend study time in proportion.
References: Allowed vs. Used to Write Questions
The trade exam's reference list has two parts:
Allowed in the exam room: the 2018 IBC, ACI 318 (2011 or 2014 edition), and ACI 530/530.1 (2011 or 2013 edition, the masonry code and specification now published as TMS 402/602).
Used to write questions but not allowed in the room: 29 CFR Part 1926 (OSHA construction standards); SJI Technical Digest No. 9 on joist handling and erection; Pipe and Excavation Contracting ; the USG Gypsum Construction Handbook (7th edition); the Nevada One Call marking guidelines and law; the PTI Level 1 unbonded post-tensioning field course; Modern Masonry ; and the ACI/ASCC Contractor's Guide to Quality Concrete Construction . These facts must be in your head.
Two rules shape how you prepare. First, code questions are based only on the code edition listed . A question is written to the 2018 IBC even if your city has adopted a newer edition. Second, where a code or law conflicts with another reference, the code, law, or regulation prevails.
Reference-Book Rules on Exam Day
Books may be highlighted, underlined, and indexed before the exam with permanent tabs only. Remove sticky notes before the exam starts.
Nothing may be written in the books before or during the exam. A candidate caught writing or highlighting during the exam has the references confiscated and is reported.
No loose or attached papers may be brought in with the references.
Scheduling, Fees, and Retakes
Fees: $95 for one exam portion, or $140 for two portions when the second is the CMS. Two trade exams cost $95 each. Fees are not refundable or transferable and expire with your eligibility.
Cancelling: Cancel at least 2 days before the appointment to keep the fee (for a Monday exam, by the previous Saturday). A voicemail does not count. Missing the exam, arriving late, or lacking proper ID forfeits the fee.
Exam day: Arrive 30 minutes early with one valid, government-issued photo ID whose name matches your registration exactly. An optional tutorial of up to 15 minutes does not count against exam time.
Scores: Results appear immediately. A passing candidate gets a score report; a failing candidate gets a diagnostic report of strengths and weaknesses by subject.
Retakes: Wait 2 weeks after a failed attempt before retesting that portion. After a third failure, the application becomes void and you must re-apply to the Board.
Spanish: The CMS is offered in Spanish on request. The B General Building trade exam does not appear on PSI's Spanish list.
A Study Plan That Matches the Outline
Tab the IBC first. Mark Chapter 3 (occupancy), Chapter 5 (height and area), Chapter 6 (construction types), Chapter 10 (egress), Chapter 17 (special inspection), Chapter 18 (soils), Chapter 19 (concrete), Chapter 21 (masonry), Chapter 22 (steel), Chapter 23 (wood), Chapter 25 (gypsum and plaster), and Chapter 33 (safeguards during construction).
Memorize what you cannot look up: OSHA Subparts M, P, Q, and R numbers, joist erection rules, post-tensioning field practice, gypsum finish levels, masonry practice, and Nevada One Call deadlines.
Drill the CMS manual for the Nevada-specific numbers (license limits, bonds, recovery fund, lien deadlines, prompt-pay days, taxes, and labor law). Each later chapter of this guide follows the CMS outline.
Time yourself on mixed practice sets at 2 minutes per question, and review every miss against the reference you would use in the exam room.
If you qualify for a waiver of the trade exam (for example, the NASCLA or reciprocity routes in Section 1.3), you still must pass the CMS.