Study guide
9.2 Secondary Power and Battery Calculations
New York Security or Fire Alarm Installer License Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 Current Exam Facts 1.2 81-Hour Qualifying Education 1.3 Application, Fees, and Fingerprints
2 Who Must Be Licensed
2.1 License Required and Exemptions 2.2 Install, Service, Maintain, Assist, and Network 2.3 Master Electrician Waiver 2.4 NYS DOS License versus NYC FDNY and Local Inspection
3 Business Practice, Employees, and Discipline
3.1 Employees, ID Cards, and Fingerprints 3.2 Qualifying Officers, Display, Records, and Advertising 3.3 Discipline, Criminal Bars, and Penalties
4 Standards and Codes
4.1 Standards Organizations 4.2 New York Uniform Fire Prevention and Building Code and the AHJ 4.3 Listed Equipment, Compatibility, and AHJ Approval
5 NEC and Article 760
5.1 NEC Overview for Alarm Work 5.2 Power-Limited versus Non-Power-Limited Fire Alarm Circuits 5.3 Fire Alarm Cable Types, Plenums, Risers, and Abandoned Cable
6 Basic Electricity I
6.1 Voltage, Current, Resistance, and Ohm’s Law 6.2 Series and Parallel Circuits 6.3 Power, Energy, and Watt’s Law
7 Basic Electricity II
7.1 AC, DC, Transformers, and Low-Voltage Power Supplies 7.2 Batteries for Alarm Systems 7.3 Meters, Opens, Shorts, and Ground Faults
8 Control Devices
8.1 Control Panel Functions and Architecture 8.2 Conventional Zones and IDCs 8.3 Addressable Systems and Signaling Line Circuits
9 Circuits, Battery Calculations, and Job Planning
9.1 Notification Appliance Circuits and Circuit Classes 9.2 Secondary Power and Battery Calculations 9.3 Job Planning and Record Keeping
10 Alarm Transmission
10.1 Digital Alarm Communicators and Legacy Phone Paths 10.2 IP, Cellular, and Dual-Path Communications 10.3 Central Stations, Signal Types, and Path Supervision
11 Motion Detection
11.1 Passive Infrared Motion Detection 11.2 Microwave, Ultrasonic, and Dual-Technology Sensors 11.3 Placement, Pet Immunity, Masking, and Walk-Test
12 Perimeter, Video, Access Control, and False Alarms
12.1 Perimeter Systems 12.2 CCTV / Video Surveillance and Specialty Systems 12.3 Access Control 12.4 False Alarm Prevention
13 Fire Detection Devices
13.1 Fire Behavior and Detector Application 13.2 Smoke Detection 13.3 Heat Detection
14 Other Initiating Devices and Notification
14.1 Manual Stations, Waterflow, Supervisory, Duct, and CO 14.2 Horns, Strobes, Speakers, and Candela 14.3 Notification Placement, Public Mode, and Accessibility
15 Fire Alarm Systems
15.1 System Types and Occupancy Context 15.2 Pathways, Classes, and Survivability 15.3 Elevator Recall, HVAC Shutdown, Door Release, and Suppression Release
16 Job Safety and Professional Conduct
16.1 Job Safety 16.2 Overview and Professional Conduct 16.3 Service Role versus Installation Role
17 Testing and Inspection
17.1 Acceptance Testing and Commissioning 17.2 Periodic Inspection, Testing, and Maintenance Frequencies 17.3 ITM Documentation and Records
18 Troubleshooting and Device Service
18.1 Testing and Troubleshooting Methods 18.2 Panels, Alarm Devices, and Communications Service 18.3 Specialty Service Items
19 Maintenance, Programming, and False-Alarm Reporting
19.1 Maintenance Programs and Contracts 19.2 Maintenance, Inspection, and False Alarm Reporting 19.3 Programming, Access Codes, Bypass, and Hours of Operation
9.2 Secondary Power and Battery Calculations
Key Takeaways Explain This Topic AI
Fire alarm secondary power is commonly taught as 24 hours of standby plus 5 minutes of alarm; emergency voice/alarm communications are commonly taught as 24 hours plus 15 minutes of alarm.
Required capacity in ampere-hours is (standby current × 24 h) + (alarm current × alarm hours), using total current in each state, not an incremental add-on unless the worksheet is written that way.
A 20 percent safety factor is widely taught NFPA 72 practice: multiply the required ampere-hours by 1.20 before you pick a battery.
Worked example: 0.250 A standby and 2.400 A alarm for 5 minutes yield 6.20 AH, then 7.44 AH after ×1.20; a 7 AH battery is short, so select 8 AH at 24 V.
Two 12 V batteries in series make 24 V at the same ampere-hour rating; series connection does not add ampere-hours.
Last updated: September 2026
Why battery math is a high-risk exam skill
Module 2 expects you to power the control unit after the branch circuit dies. Independent ExamFinch teaching here is the secondary-power calculation used on fire alarm jobs, not a claim that DOS prints this worksheet on the exam. Chapter 6 previewed watt-hours and ampere-hours on a 150 mA, 24-hour example and stopped before the safety factor. This section finishes the job: inventory every load, convert to ampere-hours (AH) , apply ×1.20 , and pick a battery that is not smaller than the result.
The written sitting is closed-book. You will not receive a manufacturer spreadsheet. You must keep the units straight: amperes , hours , ampere-hours . Five minutes is not 5 hours. Milliamperes are not amperes. Two 12 V batteries in series do not become “twice the AH.”
Primary power versus secondary power
Primary power is the dedicated alternating-current branch that feeds the FACU (line-voltage landing remains electrician work under 19 NYCRR 195.2; you still need to know that the panel is not meant to live on a lighting switched receptacle). Secondary power is the rechargeable battery (and charger) that must run the system when primary power is lost. The calculation answers: how many ampere-hours must those batteries store so the system can sit in standby and then still go into alarm for the required minutes.
Do not copy the fire-alarm hour pair onto every security control. Burglar panels follow their own listings. Use fire numbers on fire systems and the listing on security systems.
Durations you are expected to apply
As commonly taught from NFPA 72 secondary-power capacity (New York’s 2025 Uniform Code references NFPA 72—22 ; the DOS bulletin names Uniform Code plus NFPA standards, not a subsection number):
- System Standby (quiescent) Alarm operation
- Fire alarm notification (horns/strobes) 24 hours 5 minutes
- Emergency voice/alarm communications (EVACS) 24 hours 15 minutes
5 minutes = 5/60 hour = 1/12 hour ≈ 0.0833 h. 15 minutes = 15/60 hour = 0.25 h.
Special occupancies can require longer standby. If a problem states a different hour figure, use that figure. If it does not, use 24 h + 5 min for a horn-strobe fire alarm system and 24 h + 15 min for EVACS.
What current to put in each column
Use total current drawn from the batteries in each state:
I_s (standby current) — FACU electronics, communicator idle, annunciator, SLC or detector power, NAC supervision, and any auxiliary load that remains energized in standby.
I_a (alarm current) — everything that is on during a full alarm: FACU in alarm, communicator transmitting, annunciator in alarm, device power that remains, and every NAC or speaker circuit that will operate together.
These are not “standby plus extra NAC” unless the worksheet labels a column that way. The formula below uses full I_s for 24 hours and full I_a for the alarm minutes . You do not run 24 hours of alarm current.
Door holders that drop out on alarm are not an alarm-NAC load; if they remain powered from the FACU in standby, they are a standby load. Read the riser.
Required capacity before safety factor:
- AH_req = (I_s × T_s) + (I_a × T_a)
- I_s, I_a in amperes
- T_s, T_a in hours
- Result in ampere-hours
With 20 percent safety factor (widely taught NFPA 72 practice):
AH_batt = AH_req × 1.20
Then select the next standard battery whose rating is ≥ AH_batt . Common sealed-lead-acid sizes in this trade include 7 AH, 8 AH, 12 AH, 18 AH, and 26 AH (12 V modules). A 24 VDC FACU typically uses two 12 V batteries in series . Series adds voltage ; it does not add ampere-hours. Two 12 V, 8 AH batteries in series are 24 V, 8 AH , not 16 AH.
Full worked example — horn-strobe system (24 h + 5 min)
Teaching nameplates below continue Chapter 6’s 75 mA horn-strobe figure. They are not a particular manufacturer’s sheet. In the field, copy the battery-calculation current from the cut sheet, including strobe current at the voltage you are analyzing.
Standby current inventory (I_s)
- Load Quantity Standby each Standby total
- FACU electronics 1 125 mA 0.125 A
- Digital communicator (idle) 1 40 mA 0.040 A
- Remote annunciator 1 35 mA 0.035 A
- SLC / device power 1 circuit 40 mA 0.040 A
- NAC supervision and other — 10 mA 0.010 A
- Total standby I_s 0.250 A
Check: 125 + 40 + 35 + 40 + 10 = 250 mA = 0.250 A .
Alarm current inventory (I_a) — worst-case simultaneous NACs
- Load Quantity Alarm each Alarm total
- FACU in alarm 1 200 mA 0.200 A
- Communicator transmitting 1 70 mA 0.070 A
- Remote annunciator in alarm 1 40 mA 0.040 A
- SLC / device power 1 circuit 40 mA 0.040 A
- NAC 1 horn-strobes 12 × 75 mA — 0.900 A
- NAC 2 horn-strobes 10 × 75 mA — 0.750 A
- NAC 3 strobes 8 × 50 mA — 0.400 A
- Total alarm I_a 2.400 A
Check: 0.200 + 0.070 + 0.040 + 0.040 + 0.900 + 0.750 + 0.400 = 2.400 A .
Convert to ampere-hours
Standby time T_s = 24 h .
Alarm time T_a = 5 min = 5/60 h = 1/12 h .
Standby AH = I_s × T_s = 0.250 A × 24 h = 6.00 AH .
Alarm AH = I_a × T_a = 2.400 A × (5/60) h = 2.400 × 1/12 = 0.200 AH .
AH_req = 6.00 AH + 0.200 AH = 6.20 AH .
Apply 20% safety factor: AH_batt = 6.20 AH × 1.20 = 7.44 AH .
Units: amperes × hours = ampere-hours . The 0.200 AH alarm term is small because 5 minutes is a short time; the 24-hour standby term dominates. Omitting NAC current still wrecks the alarm term on a larger voice system, and omitting the communicator wrecks standby on a hungry cellular communicator.
Select the battery
7.44 AH > 7 AH , so a 7 AH battery is too small . 7.44 AH < 8 AH , so the next standard size that works is 8 AH .
For a 24 VDC panel: install two 12 V, 8 AH batteries in series . Label the calculation 8 AH at 24 V , not “16 AH.” If 8 AH is not on the truck and you only have 12 AH modules, two 12 V, 12 AH in series also satisfy 7.44 AH; you may not drop back to 7 AH.
EVACS comparison — 15 minutes and a heavier alarm load
Keep I_s = 0.250 A (standby AH still 6.00 AH ). Voice amplifiers raise alarm current. Teaching EVACS alarm current: I_a = 3.000 A (the 2.400 A notification/control load plus 0.600 A of amplifier and speaker-circuit draw).
T_a = 15 min = 0.25 h .
Alarm AH = 3.000 A × 0.25 h = 0.750 AH .
AH_req = 6.00 + 0.750 = 6.75 AH .
AH_batt = 6.75 × 1.20 = 8.10 AH .
8.10 AH > 8 AH , so the 8 AH pair that worked for the 5-minute horn-strobe example is not enough. Select the next size, 12 AH (two 12 V, 12 AH in series for a 24 V panel).
That is why EVACS minutes and speaker-amplifier current belong in the same worksheet as the strobes. Using 5 minutes on a voice system under-sizes the bank.
Recharge and voltage, briefly
The FACU charger must restore the batteries after a discharge; NFPA 72 also addresses recharge capability. This section’s exam skill is capacity in AH , not charger design. After 24 hours the battery voltage is lower than float — that is the same reason Section 9.1 told you not to prove NAC drop against 27.6 V float alone.
Exam traps
Treating 5 minutes as 5 hours: 2.400 A × 5 h = 12 AH of alarm alone, which is the wrong time unit.
Forgetting to convert mA to A (250 mA × 24 h is 6.00 AH, not 6,000 AH).
Skipping the 1.20 multiplier (stopping at 6.20 AH).
Multiplying only standby by 1.20 and dropping the alarm term (0.250 × 24 × 1.20 = 7.20 AH — that is not this example’s answer).
Using 15 minutes on a horn-strobe problem, or 5 minutes on EVACS.
Adding AH because two batteries are in series (8 + 8 = 16 AH is wrong for series).
Sizing from FACU standby only and ignoring NAC and communicator current.
Write I_s, I_a, hours, AH_req, ×1.20, then the next size that is not smaller . Section 9.3 puts that worksheet in the job folder the AHJ and 19 NYCRR 195.10 both expect to see.