Study guide
4.1 What Is Prescribed Electrical Work
NZ EWRB Electrician Registration Regulations
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 Current Exam Facts 1.2 Open-Reference Strategy & Permitted Materials 1.3 Electrician Registration Pathway & Limits of Work 1.4 Which Editions Apply: ESR Schedule 2 & the 13 November 2025 Update
2 Electricity Act & EWRB Framework
2.1 Electricity Act 1992 Framework 2.2 EWRB Role, Register & Registration Classes 2.3 Practising Licence & Electrician Limits of Work
3 Electricity (Safety) Regulations 2010
3.1 ESR 2010 Structure & Key Definitions 3.2 Electrically Safe & Electrically Unsafe 3.3 Duties of Electrical Workers & Competence 3.4 Certification Timeframes & Notification Duties under ESR
4 Prescribed Electrical Work
4.1 What Is Prescribed Electrical Work 4.2 PEW Risk Categories: Low, General, High 4.3 Who May Carry Out and Supervise PEW 4.4 High-Risk Work & Electrical Inspector Requirements
5 Certification Documents (CoC, ESC, RoI)
5.1 Certificate of Compliance (Regulation 65) 5.2 Electrical Safety Certificate (Safe to Connect / Use) 5.3 Record of Inspection (Regulation 72) 5.4 Record-Keeping, Retention & the Certification Chain 5.5 Record-Keeping Duties & the Statutory Clocks (regs 72A, 74E–74H)
6 AS/NZS 3000 Fundamentals
6.1 Structure of AS/NZS 3000 & Open-Book Navigation 6.2 Multiple Earthed Neutral (MEN) System 6.3 Basic Protection vs Fault Protection 6.4 Protective Devices, Discrimination & Coordination
7 RCDs, Shock Protection & Disconnection Times
7.1 RCD Shock-Protection Requirements 7.2 RCD Types, Classification & Installation Contexts 7.3 Disconnection Times (0.4 s / 5 s) & Earth Fault Path 7.4 Damp Situations & Additional Protection
8 Circuits, Maximum Demand & Voltage Drop
8.1 Division of Circuits & Final Subcircuits 8.2 Maximum Demand Principles 8.3 Voltage Drop Requirements & Worked Examples
9 Testing & Verification Core
9.1 Visual Inspection Before Testing 9.2 Continuity of Earthing & Protective Bonding 9.3 Insulation Resistance Testing (500 V DC, 1 MΩ) 9.4 Polarity & Correct Circuit Connections
10 EFLI, RCD Tests & Verification Sequence
10.1 Earth Fault Loop Impedance 10.2 RCD Operation Tests & Prospective Fault Current 10.3 Mandatory Test Sequence & Documentation
11 Safe Isolation & Personal Safety
11.1 Physiological Effects of Current & Shock Factors 11.2 Prove–Test–Prove Safe Isolation 11.3 Lock-Out/Tag-Out & Safety Tag System 11.4 Live-Work Controls, Fault Finding & Unsafe Installations
12 Electrical Codes of Practice & Schedule 2
12.1 NZECP 34 Electrical Safe Distances 12.2 NZECP 50 Repair of Domestic Electrical Equipment 12.3 NZECP 51 Electrical Wiring Work in Domestic Premises 12.4 NZECP 54 Recessed Luminaires & Auxiliary Equipment 12.5 ESR Schedule 2 & Companion Standards Overview
13 Installation Requirements
13.1 Consumer Mains, Point of Supply & Switchboards 13.2 Conductor Identification, Isolation, Labelling & IP Ratings 13.3 Cable Selection (AS/NZS 3008.1.2 NZ Conditions) 13.4 Construction Sites, Appliance Testing & Special Installations 13.5 Periodic Assessment, Warrants of Electrical Fitness & AS/NZS 3019
14 Exam Strategy & Key Numbers
14.1 Must-Know Numbers, Times & Thresholds 14.2 Exam Tactics & Common Traps
4.1 What Is Prescribed Electrical Work
Key Takeaways Explain This Topic AI
Prescribed electrical work (PEW) is a legal category under the Electricity Act and ESR 2010: work that may only be carried out (or supervised) by authorised persons.
Not every activity involving electricity is PEW—user plug-in of a compliant appliance and some post-connection fuse-carrier operations are classic non-PEW or limited examples.
Classification turns on defined terms such as installation, works, fittings, and appliances; define the thing before applying the duty.
PEW classification decides who may work, what supervision is required, and which certification path (low / general / high) applies.
Designing or specifying work is not the same as carrying out PEW on the installation—exam stems often separate design from hands-on PEW.
Last updated: August 2026
4.1 What Is Prescribed Electrical Work
Prescribed electrical work (PEW) is not a trade slang label for “anything electrical.” It is a legal category under the Electricity Act 1992 and the Electricity (Safety) Regulations 2010 (ESR 2010) . Once an activity is PEW, the competence, authorisation, supervision, testing, and certification rules of the statutory scheme apply. Once it is not PEW, those PEW-specific gates generally do not—though other safety duties may still apply. The regulations examination repeatedly tests whether you can classify the activity correctly before you open risk-category or certificate rules.
Legal meaning: work reserved to authorised persons
At the level you need for this exam, PEW means electrical work that the Act and Regulations control : it may be carried out only by people who hold the right registration class and current practising licence , or by trainees / limited-certificate holders under the supervision model the scheme allows, or under any other narrow lawful pathway the Regulations recognise.
That control exists for public safety. Shock, fire, and latent faults are not solved by good intentions. The register and practising-licence system answer who may alter how electricity is conveyed or used in fixed systems. When a stem asks “who may do this work?” the first fork is almost always:
Is the activity PEW?
If yes, is this person authorised for that PEW?
If the activity is not PEW, you do not invent PEW certificate duties. If it is PEW, you do not treat it as ordinary DIY or ordinary appliance use.
PEW versus non-PEW — examples that exam writers use
Exact lists live in the Regulations and Board materials. For exam reasoning, master patterns , not a fantasy exhaustive catalogue.
Pattern Typically PEW? Why it matters
Installing, altering, or repairing fixed wiring / final subcircuits Usually yes Changes the installation; requires authorised persons
Connecting or disconnecting hard-wired equipment or installation connections Usually yes Not mere user operation of a plug
Work on switchboards, consumer mains, MEN arrangements within scope Usually yes High consequence; authorisation and testing critical
Plugging a compliant portable appliance into a socket-outlet Usually no Ordinary use of an installation
Inserting a supply fuse carrier after lawful connection (as commonly taught) Often not PEW in that narrow framing Distinguished from making the connection itself
Pure design or specification of an installation without carrying out the work Design ≠ carrying out PEW Different question from “who may install”
Connection versus plug-in is the highest-yield trap. “Connecting the new permanently wired heater to the circuit” is PEW territory. “The homeowner plugged the portable heater into an existing outlet” is ordinary use. Fuse-carrier scenarios test whether the person is making a connection or only inserting a carrier after the installation has already been connected lawfully—read the stem carefully.
Design versus carrying out is the second trap. An engineer or designer may specify a compliant layout; carrying out PEW on site still requires an authorised electrical worker (or lawful supervised pathway). Do not award PEW authority merely because someone produced drawings.
Installations, fittings, appliances, and works
ESR definitions decide how rules attach. Chapter 3 stressed: define first, apply second . For PEW classification, four clusters dominate:
Installation — the consumer-side electrical system (as defined) where most building PEW, certification after PEW, and “safe to connect” questions live. Domestic, commercial, and industrial installations are the usual exam setting for Electrician pathways.
Works — network / generation / conveyance context distinct from a consumer installation. Do not blur “works” with “installation” when a stem places activity on the network side. Different duties and actors may apply.
Fittings — equipment used in generation, conversion, transformation, conveyance, or use of electricity as defined—the hardware of the system (cables, switches, boards, outlets, and similar). Much PEW is work on fittings that form part of installations or works.
Appliances — utilisation equipment with its own safety track. Maintenance or service of appliances may be PEW within class limits (or sit with narrower classes such as EAS ), but user operation of a compliant appliance is not PEW. Separating appliance service PEW from fixed-wiring PEW prevents wrong-class answers.
- Term Exam use when classifying PEW
- Installation Consumer system; CoC/ESC pathways after PEW often attach here
- Works Network/generation framing—do not default to domestic PEW answers
- Fittings Hardware being installed, altered, or connected
- Appliances Utilisation equipment—service vs plug-in vs fixed wiring
If the contested word is in the stem, open definitions before you open risk categories.
Why PEW classification drives who may work and what certificates issue
PEW is the control gate for the rest of the PEW domain (this chapter) and the certification domain (next chapter):
Who may work — registration class + practising licence + limits of work (and trainee supervision where applicable).
What risk category — low, general, or high under ESR; category is assigned to PEW, not to “jobs” generically.
What certificates — low-risk often follows a simpler ESC path; general-risk requires a Certificate of Compliance (CoC) under the reg 65 framing and an Electrical Safety Certificate (ESC) under the reg 74A framing when connection safety must be certified; high-risk adds Record of Inspection (RoI) by an Electrical Inspector under the reg 72 framing before connection is treated as free.
How long records are kept — certification records are retained for at least 7 years (regs 72A(1)(b), 74E(3) and 74G(1)(b)).
If you misclassify non-PEW as PEW, you invent certificate duties. If you misclassify PEW as “just a favour for a mate,” you miss authorisation and certification offences. Classification is not paperwork pedantry—it is the legal identity of the work .
Exam application checklist
Identify the physical activity (install, alter, connect, design, plug-in, insert carrier, service appliance).
Locate the object (installation / works / fittings / appliance).
Decide PEW or not PEW using definitions and common patterns above.
Only if PEW: ask class, licence, supervision, risk category, and documents.
Do not skip step 3 because the stem mentions electricity.
Master this section as the entry filter . Risk categories, supervision rules, and high-risk inspection all assume you already know you are inside PEW.