13.1 NZ Building Code Architecture: Clause G13, Clause E1 & Compliance Pathways
NZ PGDB Certifying Drainlayer Registration Examination Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Foul-Water Drainage System Design
1.1 Separated Drainage Systems & Cross-Connection Prevention 1.2 Drain Layout, Junctions, Bends & Sweep Connections 1.3 Gully Traps, Water Seals & Overflow Relief Gullies (ORG) 1.4 Boundary Connections, Inspection Shafts & Public Sewer Interface
2 Chapter 2: Drainage Ventilation & Commercial Waste Systems
2.1 Drainage Ventilation Systems, Relief Vents & Air Admittance Valves (AAVs) 2.2 Discharge Unit & Fixture Unit Sizing under G13/AS2 & AS/NZS 3500.2 2.3 Commercial Grease Interceptors & Oil/Grit Separators 2.4 Pumped Drainage Systems, Sumps & Rising Mains
3 Chapter 3: Stormwater Drainage & Surface Water Management
3.1 Stormwater Sizing & Flow Calculations to AS/NZS 3500.3 & E1/AS1 3.2 Stormwater Pits, Sumps, Silt Traps & Inlets 3.3 Soakage Systems, Retention & Detention Tanks 3.4 Overland Flow Paths & Secondary Flow Protection
4 Chapter 4: Drainage Testing & Quality Verification
4.1 Hydrostatic (Water) Testing Methods & Pressure Limits 4.2 Pneumatic (Air) Testing, Vacuum Testing & Leak Detection 4.3 CCTV Inspection, Defect Identification & As-Built Verification
5 Chapter 5: Trenching Safety & Confined Spaces
5.1 Excavation & Trenching Safety: Shoring, Battering & Benching 5.2 Confined Space Entry, Atmospheric Monitoring & Hazardous Gases 5.3 Underground Service Locating & Utility Strike Prevention 5.4 Site Health & Safety Management under the Health and Safety at Work Act 2015
6 Chapter 6: The Legislative & Regulatory Framework
6.1 Plumbers, Gasfitters, and Drainlayers Act 2006 & Board Functions 6.2 Licensing Classes, Registration Competencies & Annual Practising Licences 6.3 Disciplinary Regime, Offences, Complaints & Board Powers
7 Chapter 7: Certifying Drainlayer Authority & Site Supervision
7.1 Certifying Authority, Producer Statements & Records of Work 7.2 Supervision Principles: Direct vs General Supervision & Trainee Ratios 7.3 Professional Ethics, Continuing Professional Development (CPD) & Quality Assurance
8 Chapter 8: On-Site Wastewater System Design
8.1 AS/NZS 1547 Framework, Site Assessment & Soil Classification 8.2 Primary Treatment: Septic Tank Sizing, Baffles & Effluent Filters 8.3 Secondary Treatment: Aerated Wastewater Treatment Systems (AWTS) & Media Filters
9 Chapter 9: Land Application Systems & Environmental Protection
9.1 Land Application Systems: Absorption Trenches, Beds & Subsurface Drip Irrigation 9.2 Design Loading Rates (DLR), Reserve Areas & Hydraulic Sizing 9.3 Environmental Setbacks, Groundwater Protection & Resource Consents
10 Chapter 10: Pipe Materials, Jointing & Transitions
10.1 DWV Pipe Materials: uPVC, Vitrified Clay, PE & Concrete 10.2 Jointing Technologies: Solvent Cementing & Rubber Ring Joints 10.3 Dissimilar Material Adaptors, Flexible Couplings & Expansion Management
11 Chapter 11: Trench Bedding, Support & Backfill
11.1 Bedding Classes & Material Specifications under AS/NZS 3500.2 11.2 Cover Depths, Loading Conditions & Encasement Protection 11.3 Trench Backfill, Compaction Standards & Pipe Flotation Prevention
12 Chapter 12: Gradients, Invert Levels & Setting Out
12.1 Gradient Standards & Self-Cleansing Velocities under G13 & AS/NZS 3500.2 12.2 Fall, Grade & Run Calculations 12.3 Invert Level Calculations & Datum Relationships 12.4 Setting Out Methods: Laser Levels, Optical Instruments & Boning Rods
13 Chapter 13: Building Code Compliance & Service Separation
13.1 NZ Building Code Architecture: Clause G13, Clause E1 & Compliance Pathways 13.2 Service Separation: Clearances Between Foul Water, Stormwater & Other Utilities 13.3 Building Consent Authorities (BCAs), Code Compliance Certificates (CCC) & Council Inspections
14 Chapter 14: Examination Blueprint & Integrated Certifying Practice
14.1 Official Examination 9198 Blueprint, Logistics & Source Strategy 14.2 Plans, Specifications, Material Lists, Patterns, Tools & Equipment 14.3 Sustainability, Water Quality, Structural Integrity, Seismic & Geotechnical Resilience
13.1 NZ Building Code Architecture: Clause G13, Clause E1 & Compliance Pathways
Key Takeaways Explain This Topic AI
All building work must comply with the Building Code whether or not consent is required.
An Acceptable Solution is one way to establish compliance; an Alternative Solution may also comply when supported by adequate evidence.
G13/AS2 and G13/AS3 are distinct foul-water compliance paths and must not be mixed selectively.
MBIE determinations are binding statutory decisions, not informal advice or judicial rulings.
Last updated: October 2026
Building Code architecture and compliance pathways
The Building Act 2004 establishes the legal system, the Building Regulations contain the Building Code, and MBIE publishes compliance documents and guidance. Section 17 of the Act requires all building work to comply with the Building Code, even when the work is exempt from building consent. Consent status and code compliance are separate questions.
Performance-based Code
The Code states objectives, functional requirements, and performance criteria. For drainlayers, Clause G13 addresses foul water and Clause E1 addresses surface water. Other clauses may matter, including B1 Structure, B2 Durability, E2 External Moisture, G10 Piped Services, G14 Industrial Liquid Waste, and provisions for access and safety.
A performance requirement describes the outcome. It does not automatically supply a pipe size, grade, test, or material. The designer chooses a compliance path and assembles evidence that the proposed system meets the performance.
Acceptable Solutions and Verification Methods
An Acceptable Solution is a prescribed means of compliance. Work that falls within its scope and follows it completely must be accepted as complying with the covered Code provisions. A Verification Method is a prescribed test or calculation method. Scope and limitations are important: an industrial discharge excluded by G13/AS2 cannot be brought inside its scope merely by copying a pipe-size table.
G13/AS2 covers certain below-ground non-pressure foul drains up to DN150 and excludes industrial, chemical, or toxic liquid wastes needing pretreatment. G13/AS3 cites AS/NZS 3500.2:2021. These are separate paths. If AS3 is chosen, apply the cited standard and AS3 modifications. Do not combine the most convenient values from AS2 and AS/NZS 3500.2 and label the mixture an Acceptable Solution.
E1/AS1 provides prescriptive surface-water provisions within its scope. E1/VM1 provides calculation and test methods, including field soakage investigation and pipe leakage tests. Territorial-authority infrastructure requirements can add conditions for connection to a public network, but a local detail does not silently rewrite the national compliance document.
Alternative Solutions
A proposal outside an Acceptable Solution may be submitted as an Alternative Solution. Evidence can include engineering calculations, product appraisal, testing, comparison with compliance documents, expert opinion, and demonstrated performance. The BCA decides on reasonable grounds whether the proposal meets the Code.
“Specific engineering design” and producer statements can support that decision, but neither phrase is automatic approval. Define assumptions, design life, installation limits, inspection, commissioning, and maintenance. If site conditions change, review whether the evidence remains valid.
Versions and dates
The applicable consent and compliance-document versions matter. The examination guide states that legislation is examined as at 1 January of the examination year, while supplied compliance documents and standards are identified in the candidate material. On real work, use the versions applicable to the consent and transition provisions. Do not update one table in an approved design without reviewing the complete pathway.
Determinations
MBIE’s determination process resolves specified Building Act disputes and questions. A determination is a binding statutory decision for the matter, subject to the Act’s appeal route. It is not a court judgment and should not be described as a “judicial ruling.” Published determinations can be persuasive learning material, but facts and applicable document editions must be compared carefully.
Scenario
A designer uses the G13/AS2 access spacing, AS/NZS 3500.2 vent sizing, and a manufacturer’s unverified reduced gradient. That package has not followed one Acceptable Solution. It must be revised to one full pathway or presented as an Alternative Solution with evidence addressing every departure. The certifier should identify the issue before installation and obtain an approved amendment where required.
Independent source-check exercise
For 13.1 NZ Building Code Architecture: Clause G13, Clause E1 & Compliance Pathways , practise answering from evidence rather than recall. Write the controlling source, its edition or effective date, its scope, and the exact paragraph, table, figure, or manufacturer instruction that supports the decision. Then state the site inputs that can change the result. In this section those inputs include All building work must comply with the Building Code whether or not consent is required.; An Acceptable Solution is one way to establish compliance; an Alternative Solution may also comply when supported by adequate evidence.; G13/AS2 and G13/AS3 are distinct foul-water compliance paths and must not be mixed selectively..
Build a four-column check: proposed condition, source requirement, evidence observed, and action. Test the answer with one changed assumption. A different pipe size, discharge-unit load, ground condition, licence status, authority, compliance path, or consent condition may produce a different result. If it does, explain why; if it does not, show which requirement remains controlling.
Finish with a field-verification plan. Name what must be inspected before concealment, what instrument or record demonstrates it, who has authority to accept a change, and what appears on the as-built or completion file. This exercise turns an open-book fact into certifying-level judgement. It also exposes accidental mixing of standards: if the source for a dimension differs from the source for the test or approval, either return to one complete compliance path or document the proposal as an Alternative Solution. Do not promote an example value into a national rule.