Study guide
14.1 Official Examination 9198 Blueprint, Logistics & Source Strategy
NZ PGDB Certifying Drainlayer Registration Examination Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Foul-Water Drainage System Design
1.1 Separated Drainage Systems & Cross-Connection Prevention 1.2 Drain Layout, Junctions, Bends & Sweep Connections 1.3 Gully Traps, Water Seals & Overflow Relief Gullies (ORG) 1.4 Boundary Connections, Inspection Shafts & Public Sewer Interface
2 Chapter 2: Drainage Ventilation & Commercial Waste Systems
2.1 Drainage Ventilation Systems, Relief Vents & Air Admittance Valves (AAVs) 2.2 Discharge Unit & Fixture Unit Sizing under G13/AS2 & AS/NZS 3500.2 2.3 Commercial Grease Interceptors & Oil/Grit Separators 2.4 Pumped Drainage Systems, Sumps & Rising Mains
3 Chapter 3: Stormwater Drainage & Surface Water Management
3.1 Stormwater Sizing & Flow Calculations to AS/NZS 3500.3 & E1/AS1 3.2 Stormwater Pits, Sumps, Silt Traps & Inlets 3.3 Soakage Systems, Retention & Detention Tanks 3.4 Overland Flow Paths & Secondary Flow Protection
4 Chapter 4: Drainage Testing & Quality Verification
4.1 Hydrostatic (Water) Testing Methods & Pressure Limits 4.2 Pneumatic (Air) Testing, Vacuum Testing & Leak Detection 4.3 CCTV Inspection, Defect Identification & As-Built Verification
5 Chapter 5: Trenching Safety & Confined Spaces
5.1 Excavation & Trenching Safety: Shoring, Battering & Benching 5.2 Confined Space Entry, Atmospheric Monitoring & Hazardous Gases 5.3 Underground Service Locating & Utility Strike Prevention 5.4 Site Health & Safety Management under the Health and Safety at Work Act 2015
6 Chapter 6: The Legislative & Regulatory Framework
6.1 Plumbers, Gasfitters, and Drainlayers Act 2006 & Board Functions 6.2 Licensing Classes, Registration Competencies & Annual Practising Licences 6.3 Disciplinary Regime, Offences, Complaints & Board Powers
7 Chapter 7: Certifying Drainlayer Authority & Site Supervision
7.1 Certifying Authority, Producer Statements & Records of Work 7.2 Supervision Principles: Direct vs General Supervision & Trainee Ratios 7.3 Professional Ethics, Continuing Professional Development (CPD) & Quality Assurance
8 Chapter 8: On-Site Wastewater System Design
8.1 AS/NZS 1547 Framework, Site Assessment & Soil Classification 8.2 Primary Treatment: Septic Tank Sizing, Baffles & Effluent Filters 8.3 Secondary Treatment: Aerated Wastewater Treatment Systems (AWTS) & Media Filters
9 Chapter 9: Land Application Systems & Environmental Protection
9.1 Land Application Systems: Absorption Trenches, Beds & Subsurface Drip Irrigation 9.2 Design Loading Rates (DLR), Reserve Areas & Hydraulic Sizing 9.3 Environmental Setbacks, Groundwater Protection & Resource Consents
10 Chapter 10: Pipe Materials, Jointing & Transitions
10.1 DWV Pipe Materials: uPVC, Vitrified Clay, PE & Concrete 10.2 Jointing Technologies: Solvent Cementing & Rubber Ring Joints 10.3 Dissimilar Material Adaptors, Flexible Couplings & Expansion Management
11 Chapter 11: Trench Bedding, Support & Backfill
11.1 Bedding Classes & Material Specifications under AS/NZS 3500.2 11.2 Cover Depths, Loading Conditions & Encasement Protection 11.3 Trench Backfill, Compaction Standards & Pipe Flotation Prevention
12 Chapter 12: Gradients, Invert Levels & Setting Out
12.1 Gradient Standards & Self-Cleansing Velocities under G13 & AS/NZS 3500.2 12.2 Fall, Grade & Run Calculations 12.3 Invert Level Calculations & Datum Relationships 12.4 Setting Out Methods: Laser Levels, Optical Instruments & Boning Rods
13 Chapter 13: Building Code Compliance & Service Separation
13.1 NZ Building Code Architecture: Clause G13, Clause E1 & Compliance Pathways 13.2 Service Separation: Clearances Between Foul Water, Stormwater & Other Utilities 13.3 Building Consent Authorities (BCAs), Code Compliance Certificates (CCC) & Council Inspections
14 Chapter 14: Examination Blueprint & Integrated Certifying Practice
14.1 Official Examination 9198 Blueprint, Logistics & Source Strategy 14.2 Plans, Specifications, Material Lists, Patterns, Tools & Equipment 14.3 Sustainability, Water Quality, Structural Integrity, Seismic & Geotechnical Resilience
14.1 Official Examination 9198 Blueprint, Logistics & Source Strategy
Key Takeaways Explain This Topic AI
The official mark allocation is 10 health and safety, 6 supervision, 30 foul water, 20 stormwater, 25 trade waste/on-site systems, and 9 trade science/calculations.
The examination is open book, 2.5 hours, 65–70 questions, and has a 60 percent pass mark under the current examination guide.
About 75 percent is delivered electronically and 25 percent on paper; candidates must manage both media.
Legislation is examined as at 1 January of the examination year, so current candidate instructions control.
Last updated: October 2026
Official examination blueprint and logistics
The PGDB examination guide for examination 9198 is the controlling preparation source. It identifies the assessed domains, mark allocation, examination conditions, and supplied documents. Use the current guide for the sitting rather than relying on third-party metadata, which may describe a practice bank or an old format.
Mark allocation
The 100-mark blueprint is:
- health and safety: 10 marks;
- supervision: 6 marks;
- foul-water systems: 30 marks;
- stormwater systems: 20 marks;
- trade waste and on-site sewage treatment systems: 25 marks; and
trade science and calculations: 9 marks.
This allocation is a revision plan. Foul water plus stormwater is half the marks, while trade waste and on-site treatment is another quarter. Health and safety and supervision remain decisive because technical work must be delivered lawfully. Calculations are distributed through system questions as well as the named calculation domain.
Format
The current examination guide describes an open-book examination lasting 2.5 hours, with 65 to 70 questions and a 60 percent pass mark. Delivery is approximately 75 percent electronic and 25 percent paper. Read the sitting notice because venue, identification, permitted items, and exact administrative arrangements may change.
At 150 minutes for up to 70 questions, the average is a little over two minutes per question. That average includes reading drawings, locating tables, and checking calculations. Use a first pass for questions that can be answered securely, mark uncertain items, then return with the source. Do not spend ten minutes searching for one number while leaving easy questions unseen.
Supplied references
The examination guide lists supplied documents including G13, AS/NZS 3500 Part 2, E1, and G14. It also lists the broader reference framework: the PGD Act and regulations, health and safety legislation, Building Act, Health Act Part 2A, Resource Management Act, Building Code documents, excavation and underground-service guidance, AS/NZS 3500.0, 3500.2, 3500.3, AS/NZS 1546.1, 1546.3, and AS/NZS 1547.
“Open book” does not mean unlimited time to learn the source during the test. Learn each document’s scope, contents, definitions, tables, and diagrams. Build a neutral index that the current candidate rules allow. Avoid writing an answer key into a permitted document if the rules prohibit it.
Version control
The guide states that legislation is examined as at 1 January of the examination year. Use that cut-off for exam answers even if a later amendment is known. For standards and compliance documents, use the editions identified in the current candidate material. On real projects, use the versions applicable to the consent and transition rules; exam version control and site version control are related but not identical.
Source strategy
When a question gives a diagram, first classify it: foul, storm, trade waste, on-site, safety, supervision, or calculation. Identify the compliance path and units. Locate the exact table heading and notes. Eliminate options that mix paths, omit a condition, or use an attractive number for the wrong diameter.
For calculations, write units beside every value, estimate the expected magnitude, compute, then check whether the result is physically and legally usable. A correct fall calculation can still produce insufficient cover.
Retakes and administration
Current Board examination information governs booking, fees, results, and resits. Those details can change more often than technical competencies, so confirm them when applying. Keep study-guide logistics clearly dated and do not turn a current fee into a timeless fact.
A strong final revision matrix lists every blueprint item, the controlling source, at least one worked problem, and the section where it is taught. That method prevents a long guide from creating an illusion of coverage while omitting a small official competency.
Independent source-check exercise
For 14.1 Official Examination 9198 Blueprint, Logistics & Source Strategy , practise answering from evidence rather than recall. Write the controlling source, its edition or effective date, its scope, and the exact paragraph, table, figure, or manufacturer instruction that supports the decision. Then state the site inputs that can change the result. In this section those inputs include The official mark allocation is 10 health and safety, 6 supervision, 30 foul water, 20 stormwater, 25 trade waste/on-site systems, and 9 trade science/calculations.; The examination is open book, 2.5 hours, 65–70 questions, and has a 60 percent pass mark under the current examination guide.; About 75 percent is delivered electronically and 25 percent on paper; candidates must manage both media..
Build a four-column check: proposed condition, source requirement, evidence observed, and action. Test the answer with one changed assumption. A different pipe size, discharge-unit load, ground condition, licence status, authority, compliance path, or consent condition may produce a different result. If it does, explain why; if it does not, show which requirement remains controlling.
Finish with a field-verification plan. Name what must be inspected before concealment, what instrument or record demonstrates it, who has authority to accept a change, and what appears on the as-built or completion file. This exercise turns an open-book fact into certifying-level judgement. It also exposes accidental mixing of standards: if the source for a dimension differs from the source for the test or approval, either return to one complete compliance path or document the proposal as an Alternative Solution. Do not promote an example value into a national rule.