Study guide

1.2 Drain Layout, Junctions, Bends & Sweep Connections

NZ PGDB Certifying Drainlayer Registration Examination Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Foul-Water Drainage System Design

1.1 Separated Drainage Systems & Cross-Connection Prevention 1.2 Drain Layout, Junctions, Bends & Sweep Connections 1.3 Gully Traps, Water Seals & Overflow Relief Gullies (ORG) 1.4 Boundary Connections, Inspection Shafts & Public Sewer Interface

2 Chapter 2: Drainage Ventilation & Commercial Waste Systems

2.1 Drainage Ventilation Systems, Relief Vents & Air Admittance Valves (AAVs) 2.2 Discharge Unit & Fixture Unit Sizing under G13/AS2 & AS/NZS 3500.2 2.3 Commercial Grease Interceptors & Oil/Grit Separators 2.4 Pumped Drainage Systems, Sumps & Rising Mains

3 Chapter 3: Stormwater Drainage & Surface Water Management

3.1 Stormwater Sizing & Flow Calculations to AS/NZS 3500.3 & E1/AS1 3.2 Stormwater Pits, Sumps, Silt Traps & Inlets 3.3 Soakage Systems, Retention & Detention Tanks 3.4 Overland Flow Paths & Secondary Flow Protection

4 Chapter 4: Drainage Testing & Quality Verification

4.1 Hydrostatic (Water) Testing Methods & Pressure Limits 4.2 Pneumatic (Air) Testing, Vacuum Testing & Leak Detection 4.3 CCTV Inspection, Defect Identification & As-Built Verification

5 Chapter 5: Trenching Safety & Confined Spaces

5.1 Excavation & Trenching Safety: Shoring, Battering & Benching 5.2 Confined Space Entry, Atmospheric Monitoring & Hazardous Gases 5.3 Underground Service Locating & Utility Strike Prevention 5.4 Site Health & Safety Management under the Health and Safety at Work Act 2015

6 Chapter 6: The Legislative & Regulatory Framework

6.1 Plumbers, Gasfitters, and Drainlayers Act 2006 & Board Functions 6.2 Licensing Classes, Registration Competencies & Annual Practising Licences 6.3 Disciplinary Regime, Offences, Complaints & Board Powers

7 Chapter 7: Certifying Drainlayer Authority & Site Supervision

7.1 Certifying Authority, Producer Statements & Records of Work 7.2 Supervision Principles: Direct vs General Supervision & Trainee Ratios 7.3 Professional Ethics, Continuing Professional Development (CPD) & Quality Assurance

8 Chapter 8: On-Site Wastewater System Design

8.1 AS/NZS 1547 Framework, Site Assessment & Soil Classification 8.2 Primary Treatment: Septic Tank Sizing, Baffles & Effluent Filters 8.3 Secondary Treatment: Aerated Wastewater Treatment Systems (AWTS) & Media Filters

9 Chapter 9: Land Application Systems & Environmental Protection

9.1 Land Application Systems: Absorption Trenches, Beds & Subsurface Drip Irrigation 9.2 Design Loading Rates (DLR), Reserve Areas & Hydraulic Sizing 9.3 Environmental Setbacks, Groundwater Protection & Resource Consents

10 Chapter 10: Pipe Materials, Jointing & Transitions

10.1 DWV Pipe Materials: uPVC, Vitrified Clay, PE & Concrete 10.2 Jointing Technologies: Solvent Cementing & Rubber Ring Joints 10.3 Dissimilar Material Adaptors, Flexible Couplings & Expansion Management

11 Chapter 11: Trench Bedding, Support & Backfill

11.1 Bedding Classes & Material Specifications under AS/NZS 3500.2 11.2 Cover Depths, Loading Conditions & Encasement Protection 11.3 Trench Backfill, Compaction Standards & Pipe Flotation Prevention

12 Chapter 12: Gradients, Invert Levels & Setting Out

12.1 Gradient Standards & Self-Cleansing Velocities under G13 & AS/NZS 3500.2 12.2 Fall, Grade & Run Calculations 12.3 Invert Level Calculations & Datum Relationships 12.4 Setting Out Methods: Laser Levels, Optical Instruments & Boning Rods

13 Chapter 13: Building Code Compliance & Service Separation

13.1 NZ Building Code Architecture: Clause G13, Clause E1 & Compliance Pathways 13.2 Service Separation: Clearances Between Foul Water, Stormwater & Other Utilities 13.3 Building Consent Authorities (BCAs), Code Compliance Certificates (CCC) & Council Inspections

14 Chapter 14: Examination Blueprint & Integrated Certifying Practice

14.1 Official Examination 9198 Blueprint, Logistics & Source Strategy 14.2 Plans, Specifications, Material Lists, Patterns, Tools & Equipment 14.3 Sustainability, Water Quality, Structural Integrity, Seismic & Geotechnical Resilience

1.2 Drain Layout, Junctions, Bends & Sweep Connections

Key Takeaways Explain This Topic AI

Under G13/AS2, a branch junction enters in the direction of flow at no more than 45 degrees, and a graded branch enters at an incline of at least 15 degrees.

Access is required immediately before the outfall, immediately inside the boundary, at most junctions, at changes of direction or gradient greater than 45 degrees, and near the building.

Straight-run spacing is no more than 50 m between rodding points or 100 m between access points, inspection points, or inspection chambers.

The plan must be checked against the selected compliance path rather than a remembered trade rule.

Last updated: October 2026

Drain layout, junctions, bends, and access

A certifying drainlayer should treat layout as a combined hydraulic, maintenance, and compliance exercise. The relevant numbers in this section come from G13/AS2. AS/NZS 3500.2 may be used through G13/AS3, but it is a different compliance path. Requirements must not be mixed selectively.

Start at the outfall

Confirm the authorised outfall, boundary position, available invert, and any network-utility conditions before setting a private drain. Survey the connection physically where its level or location is uncertain. Work upstream from that fixed control, allowing for pipe diameter, fittings, access structures, required gradient, bedding, cover, and building penetrations. A mathematically adequate fall is not enough if the finished arrangement cannot be rodded, tested, protected, or connected lawfully.

Keep runs direct and use purpose-made drainage fittings. A branch junction under G13/AS2 must point in the direction of flow and enter at an angle not exceeding 45 degrees. Where a branch enters a graded drain, the branch is inclined upward at least 15 degrees. These controls reduce opposed flow and help place the branch flow into the receiving stream. A square tee in a horizontal graded drain is not an equivalent substitute.

Changes of direction can be made with bends and junctions permitted by the selected solution. The important exam habit is to consider the cumulative change and the access consequence, not just each fitting separately. Access is required where a change of direction or gradient exceeds 45 degrees. If several fittings create a larger effective change, evaluate the assembled layout and provide usable access.

Access schedule under G13/AS2

Prepare an access schedule while drawing the plan. G13/AS2 calls for access:

  • immediately before the drain outfall;
  • immediately inside the property boundary;
  • at every junction, except a junction less than 2 m long that serves only a gully;
  • at every change of direction greater than 45 degrees;
  • at every change of gradient greater than 45 degrees;

on a straight run at intervals no greater than 50 m where rodding points are used, or 100 m where access points, inspection points, or inspection chambers are used; and

within 2 m outside the building.

“Immediately inside the boundary” should not be converted into an invented universal 1.5 m allowance. Likewise, the straight-run rule is not a universal 30 m spacing. The actual fitting or chamber must be accessible after paving, landscaping, and occupation. A buried cap that cannot be found or opened is not useful access.

Design review

Trace a cleaning tool from each access point through the downstream route. Check that tight compound bends, opposing branches, and abrupt level changes do not prevent rodding or camera passage. Where a significant level difference is necessary, use a documented detail appropriate to the chosen compliance path and network requirements. There is no safe basis for declaring that every drop above one remembered dimension requires the same proprietary arrangement.

Check the plan in three dimensions. Other services, foundation zones, traffic loading, groundwater, and trench stability may change an apparently simple route. Coordinate penetrations with the structural design and preserve pipe support on both sides of a wall or footing. At a public connection, follow the network utility operator’s approved connection method; do not core, saddle, or enter a live asset without authority.

Verification and records

Before cover, verify line, gradient, invert levels, socket engagement, junction orientation, access locations, bedding, and support. Test the installed drain by a method accepted by the selected compliance path. Record surveyed as-built positions and inverts. A camera survey can reveal a displaced joint or ponding, but it does not replace the specified leakage test and is not automatically required on every private project.

Worked check

A straight private drain is 72 m long, with a branch at 28 m and an outfall at the downstream end. Under G13/AS2, the branch normally needs access because it is not the short gully-only exception. Rodding points alone cannot be spaced more than 50 m, so the designer locates usable access to cover the full run. Access is also provided immediately before the outfall, immediately inside the boundary, and within 2 m outside the building where those are distinct locations. The final answer is a plotted access schedule, not merely “72 divided by 50.”