1.3 Gully Traps, Water Seals & Overflow Relief Gullies (ORG)

NZ PGDB Certifying Drainlayer Registration Examination Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Foul-Water Drainage System Design

1.1 Separated Drainage Systems & Cross-Connection Prevention 1.2 Drain Layout, Junctions, Bends & Sweep Connections 1.3 Gully Traps, Water Seals & Overflow Relief Gullies (ORG) 1.4 Boundary Connections, Inspection Shafts & Public Sewer Interface

2 Chapter 2: Drainage Ventilation & Commercial Waste Systems

2.1 Drainage Ventilation Systems, Relief Vents & Air Admittance Valves (AAVs) 2.2 Discharge Unit & Fixture Unit Sizing under G13/AS2 & AS/NZS 3500.2 2.3 Commercial Grease Interceptors & Oil/Grit Separators 2.4 Pumped Drainage Systems, Sumps & Rising Mains

3 Chapter 3: Stormwater Drainage & Surface Water Management

3.1 Stormwater Sizing & Flow Calculations to AS/NZS 3500.3 & E1/AS1 3.2 Stormwater Pits, Sumps, Silt Traps & Inlets 3.3 Soakage Systems, Retention & Detention Tanks 3.4 Overland Flow Paths & Secondary Flow Protection

4 Chapter 4: Drainage Testing & Quality Verification

4.1 Hydrostatic (Water) Testing Methods & Pressure Limits 4.2 Pneumatic (Air) Testing, Vacuum Testing & Leak Detection 4.3 CCTV Inspection, Defect Identification & As-Built Verification

5 Chapter 5: Trenching Safety & Confined Spaces

5.1 Excavation & Trenching Safety: Shoring, Battering & Benching 5.2 Confined Space Entry, Atmospheric Monitoring & Hazardous Gases 5.3 Underground Service Locating & Utility Strike Prevention 5.4 Site Health & Safety Management under the Health and Safety at Work Act 2015

6 Chapter 6: The Legislative & Regulatory Framework

6.1 Plumbers, Gasfitters, and Drainlayers Act 2006 & Board Functions 6.2 Licensing Classes, Registration Competencies & Annual Practising Licences 6.3 Disciplinary Regime, Offences, Complaints & Board Powers

7 Chapter 7: Certifying Drainlayer Authority & Site Supervision

7.1 Certifying Authority, Producer Statements & Records of Work 7.2 Supervision Principles: Direct vs General Supervision & Trainee Ratios 7.3 Professional Ethics, Continuing Professional Development (CPD) & Quality Assurance

8 Chapter 8: On-Site Wastewater System Design

8.1 AS/NZS 1547 Framework, Site Assessment & Soil Classification 8.2 Primary Treatment: Septic Tank Sizing, Baffles & Effluent Filters 8.3 Secondary Treatment: Aerated Wastewater Treatment Systems (AWTS) & Media Filters

9 Chapter 9: Land Application Systems & Environmental Protection

9.1 Land Application Systems: Absorption Trenches, Beds & Subsurface Drip Irrigation 9.2 Design Loading Rates (DLR), Reserve Areas & Hydraulic Sizing 9.3 Environmental Setbacks, Groundwater Protection & Resource Consents

10 Chapter 10: Pipe Materials, Jointing & Transitions

10.1 DWV Pipe Materials: uPVC, Vitrified Clay, PE & Concrete 10.2 Jointing Technologies: Solvent Cementing & Rubber Ring Joints 10.3 Dissimilar Material Adaptors, Flexible Couplings & Expansion Management

11 Chapter 11: Trench Bedding, Support & Backfill

11.1 Bedding Classes & Material Specifications under AS/NZS 3500.2 11.2 Cover Depths, Loading Conditions & Encasement Protection 11.3 Trench Backfill, Compaction Standards & Pipe Flotation Prevention

12 Chapter 12: Gradients, Invert Levels & Setting Out

12.1 Gradient Standards & Self-Cleansing Velocities under G13 & AS/NZS 3500.2 12.2 Fall, Grade & Run Calculations 12.3 Invert Level Calculations & Datum Relationships 12.4 Setting Out Methods: Laser Levels, Optical Instruments & Boning Rods

13 Chapter 13: Building Code Compliance & Service Separation

13.1 NZ Building Code Architecture: Clause G13, Clause E1 & Compliance Pathways 13.2 Service Separation: Clearances Between Foul Water, Stormwater & Other Utilities 13.3 Building Consent Authorities (BCAs), Code Compliance Certificates (CCC) & Council Inspections

14 Chapter 14: Examination Blueprint & Integrated Certifying Practice

14.1 Official Examination 9198 Blueprint, Logistics & Source Strategy 14.2 Plans, Specifications, Material Lists, Patterns, Tools & Equipment 14.3 Sustainability, Water Quality, Structural Integrity, Seismic & Geotechnical Resilience

1.3 Gully Traps, Water Seals & Overflow Relief Gullies (ORG)

Key Takeaways Explain This Topic AI

An Overflow Relief Gully (ORG) acts as a sacrificial surcharge discharge point, preventing sewer main backups from flooding internal building fixtures.

The top of an ORG grating must be positioned at least 150 mm below the overflow level of the lowest internal sanitary fixture.

ORG gratings must maintain a minimum clearance of 75 mm above surrounding unpaved ground and 25 mm above paved surfaces sloping away from the gully.

To prevent sewer gas ingress, gully traps must maintain a continuous water seal of at least 65 mm under G13/AS2, charged regularly by an upstream fixture.

Gully traps must be supported on a stable concrete footing and enclosed in a concrete collar to prevent differential ground settlement and exclude surface water infiltration.

Last updated: October 2026

Compliance note: Under G13/AS2 the gully water seal is at least 65 mm. The overflow level is at least 25 mm above paved ground or 75 mm above unpaved ground, the top of the water seal is no more than 600 mm below the dish, and housing gullies sit at least 150 mm below the lowest fixture overflow. Concrete support is required where physical damage is likely; otherwise use the specified compacted bedding.

Gully Traps, Water Seals & Overflow Relief Gullies (ORG)

In New Zealand sanitary drainage design, the Gully Trap and Overflow Relief Gully (ORG) serve two critical, interrelated functions: they isolate sewer atmosphere from the living environment using a liquid barrier, and they provide an external sacrificial relief point during hydraulic surcharge. These systems are governed by NZBC Clause G13/AS2 (Section 3) and AS/NZS 3500.2:2021 (Clause 4.6) .

Without a functioning, properly positioned ORG, any downstream blockage in the private lateral or municipal reticulation will force raw sewage to back up into the lowest connected interior fixture—typically a shower tray, bathtub, or floor waste gully. The certifying drainlayer must understand the precise dimensional clearances, structural support requirements, and hydraulic mechanics required to ensure compliant operation.

1. Operating Mechanism of the Overflow Relief Gully (ORG)

The fundamental operational principle of an ORG is hydraulic fail-safety: +--------------------------------------------------------------+

  • | HYDRAULIC SURCHARGE RELIEF MECHANISM |
  • | |
  • | Dwelling Interior Exterior Yard |
  • | ----------------- ------------- |
  • | Shower Waste Lip |
  • | [RL 12.450 m] |
  • | | |
  • | | === 150 mm MINIMUM VERTICAL SAFETY DROP === |
  • | | |
  • | | ORG Grating |
  • | | [RL 12.300 m] |
  • | | | |
  • | | +--- (SEWAGE EXITS |
  • | | | HARMLESSLY |
  • | | | INTO YARD) |
  • | v v |
  • | ================================================== |
  • | Private Sewer Drain |
  • | [BLOCKAGE DOWNSTREAM] <--- BACKUP OCCURS |
  • +--------------------------------------------------------------+

When a downstream blockage occurs, sewage backing up the pipe reaches the elevation of the external ORG grate before it reaches the internal fixtures, provided the mandatory 150 mm vertical drop is maintained. The loose-fitting grating lifts or overflows onto external ground, relieving pressure and warning the occupants without contaminating indoor floor coverings, framing timber, or plasterboard.

ORG Grate Requirements

Loose-Fitting Grating: The grating must never be screwed, cemented, or bolted down. It must be a lightweight, perforated plastic or cast-metal grid designed to dislodge freely under hydrostatic surcharge.

Unobstructed Spillway: The area immediately surrounding the ORG must allow water to flow away by gravity into gardens or lawns. It must never be enclosed within an unvented porch, greenhouse, or beneath low decking lacking access panels.

2. Mandatory Clearances: Vertical & Ground Heights

The positioning of the ORG grating requires balancing two opposing dimensional constraints: it must sit low enough to protect interior fixtures, yet high enough to exclude external surface stormwater. +--------------------------------------------------------------+

  • | MANDATORY ORG CLEARANCE PROFILE |
  • | |
  • | Internal Fixture Lip (Lowest Shower/Bath Outlet) |
  • | ======================================================== |
  • | | |
  • | | >= 150 mm Vertical Drop |
  • | v |
  • | ORG Grating Lip |
  • | ------------- |
  • | | |
  • | +-----------------+ |
  • | | | |
  • | | >= 75 mm | >= 25 mm |
  • | | Unpaved Ground | Paved Surface (Sloping 1:40)|
  • | v v |
  • | [Garden/Lawn] [Concrete Patio/Driveway] |
  • +--------------------------------------------------------------+
  • 1. Vertical Safety Clearance to Lowest Internal Fixture

The Rule: The top of the ORG grate must be located at least 150 mm below the flood level rim (overflow lip) of the lowest connected sanitary fixture inside the building (e.g., shower waste outlet, low-set bath rim, or floor waste gully).

Slab-on-Grade Challenge: In modern concrete slab-on-ground construction, achieving this 150 mm difference is one of the most common site errors. If the concrete floor slab sits only 150 mm above finished ground, and a level-entry walk-in shower is installed, the shower waste lip may be only 50 mm above ground. In such cases, the external ground at the gully must be sculpted, battered down, or provided with an engineered retaining well to maintain the 150 mm clearance.

2. Clearance Above Ground Surfaces (Stormwater Ingress Prevention)

To prevent surface rainwater and garden wash from pouring into the foul sewer, the top of the gully rim must maintain strict clearances above adjacent finished surfaces:

Surface Category Minimum Height of Grate Above Finished Surface Surface Drainage Requirement

Unpaved Ground (Lawns, gardens, loose topsoil, gravel beds) 75 mm Ground must slope away from the gully rim to prevent ponding and soil wash-in.

Paved Surfaces (Concrete paths, driveways, pavers, asphalt) 25 mm (50 mm recommended in exposed areas) Paving must fall away from the gully at a minimum slope of 1:40 (2.5%) for at least 500 mm.

Lightwells / Depressed Wells Protected by raised concrete kerb ≥ 75 mm \ge 75\text{ mm} ≥ 75 mm above surrounding ground Drainwell must have a separate stormwater drain if exposed to open sky.

3. Water Seals, Evaporation & Trap Charging

A gully trap incorporates an integral P-trap or U-bend water seal that acts as an impermeable physical barrier between toxic sewer gases (hydrogen sulphide H 2 S H_2S H 2 ​ S , methane C H 4 CH_4 C H 4 ​ ) and the atmosphere.

Water Seal Dimensions

NZBC G13/AS2: Mandates a minimum water seal depth of 65 mm for gully traps.

AS/NZS 3500.2:2021: Specifies a minimum water seal depth of 65 mm for overflow relief gullies.

Water Loss Mechanics: In arid, windy, or heated environments, water seals lose approximately 1 to 2 mm of depth per day through natural evaporation. Siphonage from downstream peak drainage flushes can also deplete an unvented water seal.

Trap Charging (Mandatory Upstream Fixture Connection)

An uncharged gully trap is an illegal installation under both New Zealand and Australian codes:

Charging Fixture Requirement: A gully trap must receive the discharge of at least one frequently used, permanently plumbed fixture to maintain the liquid seal. Typical compliant charging fixtures include a laundry wash tub, a bathroom vanity basin, or a kitchen sink.

Untrapped Waste Pipes: Waste pipes discharging into an open gully hopper must terminate above the water seal with a clear air break :

The waste pipe outlet must terminate at least 25 mm above the overflow level of the gully dish.

The outlet must terminate not less than 50 mm above the water seal surface.

This air gap prevents dirty water in the gully from siphoning back into the waste pipe and prevents bacterial slime from climbing into internal fixture wastes.

4. Structural Support: Bedding Footings & Concrete Surrounds

Gully traps represent an interface between the building's fixed plumbing and external soil movement. Differential settlement, lawnmower impacts, or foot traffic can easily fracture the vertical riser or dislodge the trap. +--------------------------------------------------------------+

  • | CONCRETE SURROUND & FOOTING CROSS-SECTION |
  • | |
  • | Loose Grating [Removable] |
  • | +-------+ |
  • | Finished Ground | | 75 mm Wide Concrete Collar |
  • | ================+ +================ |
  • | | Concrete | Riser | Sloping Concrete Surround |
  • | | Apron | | (17.5 MPa) |
  • | +---------------+ +---------------+ |
  • | | | |
  • | | P-Trap| |
  • | +-- --+ |
  • | \ / |
  • | ===================== |
  • | 100 mm Concrete Pad |
  • | or Compacted Metal |
  • +--------------------------------------------------------------+
  • Construction Specifications (NZBC G13/AS2 Clause 3.3)

Base Support Footing: The gully trap fitting must rest on a stable bed of compacted granular bedding (crushed stone 7–14 mm) or a poured concrete bedding pad of at least 75 mm to 100 mm thickness (minimum 17.5 MPa compressive strength). It must never sit directly on uncompacted clay trench backfill.

Concrete Surround (Apron Collar): A continuous concrete collar must be cast around the gully hopper. The surround must be at least 75 mm thick and extend at least 100 mm laterally around the perimeter of the dish. The concrete surface must be trowelled to slope away from the grate rim to shed splashing water and exclude surface runoff.

Riser Pipe Extensions: Where deep drains require a gully riser exceeding 600 mm, the riser must be constructed from DN 100 uPVC pipe securely socketed into the P-trap, and the entire assembly must be backfilled with compacted gravel to prevent ovalization.

5. Worked Numerical Example: Slab-on-Grade Elevation Check

A certifying drainlayer is setting out the drainage for a modern single-storey residential dwelling on a concrete raft slab. +--------------------------------------------------------------+

  • | ELEVATION CHECK & WORKING WINDOW |
  • | |
  • | Finished Floor Level (FFL) = RL 100.500 m |
  • | Shower Drain Invert = RL 100.480 m (Lowest Fixture) |
  • | |
  • | Maximum ORG Grate Level = RL 100.480 - 0.150 |
  • | = RL 100.330 m [CEILING] |
  • | |
  • | Finished Garden Level = RL 100.220 m |
  • | Minimum ORG Grate Level = RL 100.220 + 0.075 |
  • | = RL 100.295 m [FLOOR] |
  • | |
  • | => PERMISSIBLE WORKING WINDOW: RL 100.295 m to 100.330 m |
  • | TOLERANCE BAND = EXACTLY 35 mm |
  • +--------------------------------------------------------------+
  • Site Survey Data

Finished Floor Level (FFL) of concrete slab: RL 100.500 m \text{RL } 100.500\text{ m} RL 100.500 m .

Lowest internal sanitary fixture: An ensuite walk-in tiled shower with its floor waste lip set at RL 100.480 m \text{RL } 100.480\text{ m} RL 100.480 m .

Finished ground level outside the bathroom wall (unpaved lawn): RL 100.220 m \text{RL } 100.220\text{ m} RL 100.220 m .

Step 1: Calculate Maximum Permissible ORG Grate Elevation

To satisfy the 150 mm vertical safety drop: Max Grate Elevation = Shower Lip Level − 0.150 m \text{Max Grate Elevation} = \text{Shower Lip Level} - 0.150\text{ m} Max Grate Elevation = Shower Lip Level − 0.150 m Max Grate Elevation = 100.480 − 0.150 = RL 100.330 m \text{Max Grate Elevation} = 100.480 - 0.150 = \text{RL } 100.330\text{ m} Max Grate Elevation = 100.480 − 0.150 = RL 100.330 m

Step 2: Calculate Minimum Permissible ORG Grate Elevation

To satisfy the 75 mm clearance above unpaved lawn: Min Grate Elevation = Finished Ground Level + 0.075 m \text{Min Grate Elevation} = \text{Finished Ground Level} + 0.075\text{ m} Min Grate Elevation = Finished Ground Level + 0.075 m Min Grate Elevation = 100.220 + 0.075 = RL 100.295 m \text{Min Grate Elevation} = 100.220 + 0.075 = \text{RL } 100.295\text{ m} Min Grate Elevation = 100.220 + 0.075 = RL 100.295 m

Step 3: Determine the Operational Compliance Band Tolerance Window = 100.330 − 100.295 = 0.035 m = 35 mm \text{Tolerance Window} = 100.330 - 100.295 = 0.035\text{ m} = 35\text{ mm} Tolerance Window = 100.330 − 100.295 = 0.035 m = 35 mm

Engineering Assessment

The certifying drainlayer must set the top of the ORG hopper between RL 100.295 m \text{RL } 100.295\text{ m} RL 100.295 m and RL 100.330 m \text{RL } 100.330\text{ m} RL 100.330 m —a narrow operational window of only 35 mm . If the landscaper later adds 50 mm of topsoil and bark mulch to the garden, the ground rises to RL 100.270 m \text{RL } 100.270\text{ m} RL 100.270 m , reducing clearance below the mandatory 75 mm threshold and causing non-compliance. The drainlayer must advise the site supervisor in writing to install a concrete retaining border around the gully apron.

6. Trade Traps in Gully Trap Installation +-------------------------------------------------------------------------+

  • | DRAINLAYER TRADE TRAPS |
  • | |
  • | [!] THE CONCRETE ENCASEMENT BOLT DOWN |
  • | Concreting an external path around an ORG and screwing a brass or |
  • | heavy iron grate into the surround to keep it neat. During a surcharge, |
  • | the grate cannot lift, forcing raw sewage to erupt through the indoor |
  • | shower waste. |
  • | |
  • | [!] THE DRY GULLY TRAP |
  • | Directing all internal bathroom wastes into stacks and installing an |
  • | external ORG that receives zero charging fixtures. Within weeks, the |
  • | water seal evaporates, venting raw sewer gas beside bedroom windows. |
  • | |
  • | [!] THE LANDSCAPE BURIAL |
  • | Cutting an ORG riser flush with rough clay subgrade before landscaping. |
  • | The landscaper spreads topsoil and turf over the gully, burying the |
  • | grate below ground level where it acts as a stormwater catchpit. |
  • +-------------------------------------------------------------------------+

Loading diagram... Overflow Relief Gully (ORG) Compliance and Elevation Verification Logic