12.2 Fall, Grade & Run Calculations
NZ PGDB Certifying Drainlayer Registration Examination Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Foul-Water Drainage System Design
1.1 Separated Drainage Systems & Cross-Connection Prevention 1.2 Drain Layout, Junctions, Bends & Sweep Connections 1.3 Gully Traps, Water Seals & Overflow Relief Gullies (ORG) 1.4 Boundary Connections, Inspection Shafts & Public Sewer Interface
2 Chapter 2: Drainage Ventilation & Commercial Waste Systems
2.1 Drainage Ventilation Systems, Relief Vents & Air Admittance Valves (AAVs) 2.2 Discharge Unit & Fixture Unit Sizing under G13/AS2 & AS/NZS 3500.2 2.3 Commercial Grease Interceptors & Oil/Grit Separators 2.4 Pumped Drainage Systems, Sumps & Rising Mains
3 Chapter 3: Stormwater Drainage & Surface Water Management
3.1 Stormwater Sizing & Flow Calculations to AS/NZS 3500.3 & E1/AS1 3.2 Stormwater Pits, Sumps, Silt Traps & Inlets 3.3 Soakage Systems, Retention & Detention Tanks 3.4 Overland Flow Paths & Secondary Flow Protection
4 Chapter 4: Drainage Testing & Quality Verification
4.1 Hydrostatic (Water) Testing Methods & Pressure Limits 4.2 Pneumatic (Air) Testing, Vacuum Testing & Leak Detection 4.3 CCTV Inspection, Defect Identification & As-Built Verification
5 Chapter 5: Trenching Safety & Confined Spaces
5.1 Excavation & Trenching Safety: Shoring, Battering & Benching 5.2 Confined Space Entry, Atmospheric Monitoring & Hazardous Gases 5.3 Underground Service Locating & Utility Strike Prevention 5.4 Site Health & Safety Management under the Health and Safety at Work Act 2015
6 Chapter 6: The Legislative & Regulatory Framework
6.1 Plumbers, Gasfitters, and Drainlayers Act 2006 & Board Functions 6.2 Licensing Classes, Registration Competencies & Annual Practising Licences 6.3 Disciplinary Regime, Offences, Complaints & Board Powers
7 Chapter 7: Certifying Drainlayer Authority & Site Supervision
7.1 Certifying Authority, Producer Statements & Records of Work 7.2 Supervision Principles: Direct vs General Supervision & Trainee Ratios 7.3 Professional Ethics, Continuing Professional Development (CPD) & Quality Assurance
8 Chapter 8: On-Site Wastewater System Design
8.1 AS/NZS 1547 Framework, Site Assessment & Soil Classification 8.2 Primary Treatment: Septic Tank Sizing, Baffles & Effluent Filters 8.3 Secondary Treatment: Aerated Wastewater Treatment Systems (AWTS) & Media Filters
9 Chapter 9: Land Application Systems & Environmental Protection
9.1 Land Application Systems: Absorption Trenches, Beds & Subsurface Drip Irrigation 9.2 Design Loading Rates (DLR), Reserve Areas & Hydraulic Sizing 9.3 Environmental Setbacks, Groundwater Protection & Resource Consents
10 Chapter 10: Pipe Materials, Jointing & Transitions
10.1 DWV Pipe Materials: uPVC, Vitrified Clay, PE & Concrete 10.2 Jointing Technologies: Solvent Cementing & Rubber Ring Joints 10.3 Dissimilar Material Adaptors, Flexible Couplings & Expansion Management
11 Chapter 11: Trench Bedding, Support & Backfill
11.1 Bedding Classes & Material Specifications under AS/NZS 3500.2 11.2 Cover Depths, Loading Conditions & Encasement Protection 11.3 Trench Backfill, Compaction Standards & Pipe Flotation Prevention
12 Chapter 12: Gradients, Invert Levels & Setting Out
12.1 Gradient Standards & Self-Cleansing Velocities under G13 & AS/NZS 3500.2 12.2 Fall, Grade & Run Calculations 12.3 Invert Level Calculations & Datum Relationships 12.4 Setting Out Methods: Laser Levels, Optical Instruments & Boning Rods
13 Chapter 13: Building Code Compliance & Service Separation
13.1 NZ Building Code Architecture: Clause G13, Clause E1 & Compliance Pathways 13.2 Service Separation: Clearances Between Foul Water, Stormwater & Other Utilities 13.3 Building Consent Authorities (BCAs), Code Compliance Certificates (CCC) & Council Inspections
14 Chapter 14: Examination Blueprint & Integrated Certifying Practice
14.1 Official Examination 9198 Blueprint, Logistics & Source Strategy 14.2 Plans, Specifications, Material Lists, Patterns, Tools & Equipment 14.3 Sustainability, Water Quality, Structural Integrity, Seismic & Geotechnical Resilience
12.2 Fall, Grade & Run Calculations
Key Takeaways Explain This Topic AI
Drainage gradient represents the mathematical ratio of vertical fall to horizontal run: Fall = Run / G, Run = Fall x G, and Grade % = (Fall / Run) x 100.
Certifying drainlayers must seamlessly convert between ratios (1:60), percentages (1.67%), and fall rates (16.7 mm/m) to program pipe lasers and verify site work.
Calculations must always utilize the true horizontal run rather than surface slope length, as slope distance overstates horizontal run on steep terrain.
Multi-leg pipeline designs must incorporate statutory and hydraulic invert drops (typically 20 mm to 50 mm) across inspection chambers and sharp changes of direction.
Excessive gradient on unvented branch drains can induce self-siphonage, rapidly stripping fixture trap seals in violation of NZBC G13/AS2.
Last updated: October 2026
Fall, Grade & Run Calculations
Precision calculation of pipe gradients is an essential daily responsibility of a registered Certifying Drainlayer. An error of just a few millimetres per metre can turn an approved drainage design into a non-compliant installation that either stalls wastewater through slack fall or causes destructive hydrodynamic separation through excessive grade.
Drainage geometry is governed by basic trigonometric and algebraic relationships applied to right-angled triangles. On New Zealand construction sites, certifying drainlayers must work effortlessly across three distinct mathematical formats used on civil engineering plans, building consent drawings, and instrument displays: fractional ratios (e.g. 1 : 60 1:60 1 : 60 ), percentages (e.g. 1.67 % 1.67\% 1.67% ), and metric fall rates (e.g. 16.7 mm/m 16.7\text{ mm/m} 16.7 mm/m ). Understanding how to manipulate these formulas, compensate for fitting head losses, and verify available site fall ensures absolute compliance with NZBC Clause G13 and AS/NZS 3500.2:2021.
1. The Mathematical Geometry of Drainage Gradients
Underground drainage setting out operates in a vertical right-angled plane formed by three geometric dimensions: +-------------------------------------------------------------+
- | DRAINAGE RIGHT-ANGLED GEOMETRY |
- | |
- | Upstream Invert (Point A) |
- | *====================== |
- | | / ^ |
- | | / | Vertical Fall (H) |
- | | / Slope Length | [H = Run / G] |
- | | / v |
- | | *================ Downstream Invert (Point B) |
- | |<-------------------->| |
- | Horizontal Run (L) |
- | [L = Fall x G] |
- +-------------------------------------------------------------+
Horizontal Run ( L L L ): The true horizontal distance traversed by the pipeline between two survey points, measured in metres ( m \text{m} m ). This is always the dimension shown on plan view drawings.
Vertical Fall ( H H H ): The change in vertical elevation of the pipe invert from the upstream station to the downstream station, measured in metres ( m \text{m} m ) or millimetres ( mm \text{mm} mm ).
Slope Length ( S S S ): The actual diagonal length of pipe barrel laid in the trench bed. For shallow drainage grades ( < 1 : 20 < 1:20 < 1 : 20 ), the difference between horizontal run and slope length is negligible ( < 0.1 % < 0.1\% < 0.1% ). However, on steep hillsides ( > 1 : 5 > 1:5 > 1 : 5 ), measuring along the slope overestimates horizontal run, leading to significant gradient errors if not corrected.
The Fundamental Mathematical Formulas
Gradient Ratio ( 1 : G 1:G 1 : G ): Gradient = 1 G = Fall Run \text{Gradient} = \frac{1}{G} = \frac{\text{Fall}}{\text{Run}} Gradient = G 1 = Run Fall
Where G G G represents the horizontal distance required to achieve exactly one unit of vertical fall (e.g. in 1 : 60 1:60 1 : 60 , G = 60 G = 60 G = 60 ).
Calculating Vertical Fall ( H H H ): Fall = Run G = Run × ( Grade % 100 ) = Run (m) × Fall Rate (mm/m) \text{Fall} = \frac{\text{Run}}{G} = \text{Run} \times \left(\frac{\text{Grade } \%}{100}\right) = \text{Run (m)} \times \text{Fall Rate (mm/m)} Fall = G Run = Run × ( 100 Grade % ) = Run (m) × Fall Rate (mm/m)
Calculating Horizontal Run ( L L L ): Run = Fall × G = Fall Grade Decimal = Fall (mm) Fall Rate (mm/m) \text{Run} = \text{Fall} \times G = \frac{\text{Fall}}{\text{Grade Decimal}} = \frac{\text{Fall (mm)}}{\text{Fall Rate (mm/m)}} Run = Fall × G = Grade Decimal Fall = Fall Rate (mm/m) Fall (mm)
Calculating Grade Percentage (Grade %): Grade % = ( Fall Run ) × 100 \text{Grade } \% = \left(\frac{\text{Fall}}{\text{Run}}\right) \times 100 Grade % = ( Run Fall ) × 100
Calculating Metric Fall Rate (mm per metre): Fall Rate (mm/m) = 1000 G = Grade % × 10 \text{Fall Rate (mm/m)} = \frac{1000}{G} = \text{Grade } \% \times 10 Fall Rate (mm/m) = G 1000 = Grade % × 10
2. Gradient Conversion Protocols & Reference Matrix
Certifying drainlayers must frequently translate design specifications between surveyor drawings (which quote percentages or Reduced Levels), local council bylaws (which specify ratios), and modern pipe laser digital inputs (which accept percentage grades).
Conversion Reference Matrix
Gradient Ratio (1:G) Decimal Slope Grade Percentage (%) Metric Fall Rate (mm/m) Typical Code Application & Standard Reference
1:10 0.1000 10.00% 100.0 mm/m Maximum permissible grade before backdrop/jump-up required.
1:20 0.0500 5.00% 50.0 mm/m Steep site branch runs; excellent self-cleansing.
1:30 0.0333 3.33% 33.3 mm/m Common steep terrain residential grade.
1:40 0.0250 2.50% 25.0 mm/m DN 65 statutory minimum grade (AS/NZS 3500.2 Table 3.2.2).
1:50 0.0200 2.00% 20.0 mm/m DN 80 statutory minimum grade (AS/NZS 3500.2 Table 3.2.2).
1:60 0.0167 1.67% (1.65%) 16.7 mm/m DN 100 statutory minimum grade (NZBC G13/AS2 Table 2).
1:80 0.0125 1.25% 12.5 mm/m DN 125 minimum; DN 100 reduced grade (connected load ≥ 200 DU \ge 200\text{ DU} ≥ 200 DU ).
1:100 0.0100 1.00% 10.0 mm/m DN 150 statutory minimum grade (NZBC G13/AS2 Table 2).
1:120 0.0083 0.83% 8.33 mm/m DN 100 high-flow engineered grade (G13/AS2 Table 2, > 30 DU).
1:150 0.0067 0.67% 6.67 mm/m High-flow civil foul collector mains.
1:160 0.00625 0.625% 6.25 mm/m DN 150 reduced grade under AS/NZS 3500.2 (connected load ≥ 260 DU \ge 260\text{ DU} ≥ 260 DU ).
1:200 0.0050 0.50% 5.0 mm/m DN 225 trunk sewer minimum grade (AS/NZS 3500.2).
Step-by-Step Conversion Procedures
Ratio to Percentage: Divide 100 100 100 by the ratio denominator G G G . For 1 : 60 1:60 1 : 60 : 100 / 60 = 1.666... % ≈ 1.67 % 100 / 60 = 1.666...\% \approx 1.67\% 100/60 = 1.666...% ≈ 1.67% .
Percentage to Ratio: Divide 100 100 100 by the percentage number. For a laser reading 1.25 % 1.25\% 1.25% : 100 / 1.25 = 80 100 / 1.25 = 80 100/1.25 = 80 , yielding a ratio of 1 : 80 1:80 1 : 80 .
Ratio to Millimetres per Metre: Divide 1000 mm 1000\text{ mm} 1000 mm by G G G . For 1 : 60 1:60 1 : 60 : 1000 / 60 = 16.67 mm/m 1000 / 60 = 16.67\text{ mm/m} 1000/60 = 16.67 mm/m .
Millimetres per Metre to Ratio: Divide 1000 1000 1000 by the millimetres per metre. For 25 mm/m 25\text{ mm/m} 25 mm/m : 1000 / 25 = 40 1000 / 25 = 40 1000/25 = 40 , yielding a ratio of 1 : 40 1:40 1 : 40 .
3. Multi-Leg Pipeline Calculations & Chamber Drops
In practical site drainage, a pipeline rarely runs unbroken from head to outfall. Instead, pipelines consist of multiple consecutive segments (legs) connected through inspection chambers (manholes), inspection junctions, or changes of direction.
Hydraulic Energy Loss across Chambers and Bends
When liquid flows through an inspection chamber or around a sharp bend, turbulence creates dynamic head loss. If the downstream invert is set at the identical level as the incoming pipe invert, water backs up into the incoming line, causing solids to drop out. Standard professional practice under AS/NZS 3500.2 and territorial authority standards mandates an invert drop through chambers:
Straight-Through Chamber: Minimum 20 mm 20\text{ mm} 20 mm invert drop across the benching channel.
45° to 90° Bend in Chamber: Minimum 30 mm 30\text{ mm} 30 mm to 50 mm 50\text{ mm} 50 mm invert drop from incoming invert to outgoing invert to compensate for boundary directional friction.
Worked Practical Calculation: Multi-Leg Residential Pipeline +-------------------------------------------------------------+
- | MULTI-LEG DRAINAGE PROFILE |
- | |
- | Station 0.0 m (Gully Trap) |
- | Invert: RL 100.000 m |
- | * |
- | / Leg 1: 14.5 m @ 1:60 (Fall = 0.242 m) |
- | / |
- | * Station 14.5 m (Inspection Junction) |
- | / Invert: RL 99.758 m |
- | / Leg 2: 22.0 m @ 1:60 (Fall = 0.367 m) |
- | / |
- | * Station 36.5 m (Manhole Inlet: RL 99.391 m) |
- | | |
- | | 30 mm Chamber Invert Step |
- | | |
- | * Station 36.5 m (Manhole Outlet: RL 99.361 m) |
- | / |
- | / Leg 3: 18.2 m @ 1:80 (Fall = 0.228 m) |
- | / |
- | * Station 54.7 m (Boundary Connection) |
- | Invert: RL 99.133 m |
- +-------------------------------------------------------------+
- Installation Parameters
A certifying drainlayer is laying a multi-leg DN 100 foul drainage line across a residential property to connect into a council boundary inspection shaft:
Starting Point (Chainage 0.0 m 0.0\text{ m} 0.0 m ): Residential gully trap outlet. Design Invert Level = RL 100.000 m \text{RL } 100.000\text{ m} RL 100.000 m .
Leg 1 ( 0.0 m 0.0\text{ m} 0.0 m to 14.5 m 14.5\text{ m} 14.5 m ): DN 100 uPVC pipe, horizontal run = 14.5 m 14.5\text{ m} 14.5 m , laid at minimum standard grade of 1 : 60 1:60 1 : 60 .
Leg 2 ( 14.5 m 14.5\text{ m} 14.5 m to 36.5 m 36.5\text{ m} 36.5 m ): Connecting from inspection junction to a new 1050 mm 1050\text{ mm} 1050 mm concrete manhole. Horizontal run = 22.0 m 22.0\text{ m} 22.0 m , laid at 1 : 60 1:60 1 : 60 .
Manhole Invert Drop ( 36.5 m 36.5\text{ m} 36.5 m ): A 90° sweeping benching curve requires a mandatory vertical invert drop of 30 mm 30\text{ mm} 30 mm ( 0.030 m 0.030\text{ m} 0.030 m ).
Leg 3 ( 36.5 m 36.5\text{ m} 36.5 m to 54.7 m 54.7\text{ m} 54.7 m ): Main discharge trunk to boundary connection. Due to high fixture count (connected load ≥ 200 DU \ge 200\text{ DU} ≥ 200 DU ), this section is designed at a compliant reduced grade of 1 : 80 1:80 1 : 80 . Horizontal run = 18.2 m 18.2\text{ m} 18.2 m .
Step-by-Step Numerical Resolution
Calculate Fall for Leg 1: Fall Leg 1 = Run G = 14.5 m 60 = 0.2417 m ≈ 242 mm \text{Fall}_{\text{Leg 1}} = \frac{\text{Run}}{G} = \frac{14.5\text{ m}}{60} = 0.2417\text{ m} \approx 242\text{ mm} Fall Leg 1 = G Run = 60 14.5 m = 0.2417 m ≈ 242 mm Invert at Junction (Station 14.5 m) = 100.000 − 0.242 = RL 99.758 m \text{Invert at Junction (Station 14.5 m)} = 100.000 - 0.242 = \text{RL } 99.758\text{ m} Invert at Junction (Station 14.5 m) = 100.000 − 0.242 = RL 99.758 m
Calculate Fall for Leg 2: Fall Leg 2 = Run G = 22.0 m 60 = 0.3667 m ≈ 367 mm \text{Fall}_{\text{Leg 2}} = \frac{\text{Run}}{G} = \frac{22.0\text{ m}}{60} = 0.3667\text{ m} \approx 367\text{ mm} Fall Leg 2 = G Run = 60 22.0 m = 0.3667 m ≈ 367 mm Invert at Manhole Inlet (Station 36.5 m) = 99.758 − 0.367 = RL 99.391 m \text{Invert at Manhole Inlet (Station 36.5 m)} = 99.758 - 0.367 = \text{RL } 99.391\text{ m} Invert at Manhole Inlet (Station 36.5 m) = 99.758 − 0.367 = RL 99.391 m
Apply Manhole Invert Drop: Invert at Manhole Outlet (Station 36.5 m) = 99.391 − 0.030 = RL 99.361 m \text{Invert at Manhole Outlet (Station 36.5 m)} = 99.391 - 0.030 = \text{RL } 99.361\text{ m} Invert at Manhole Outlet (Station 36.5 m) = 99.391 − 0.030 = RL 99.361 m
Calculate Fall for Leg 3: Fall Leg 3 = Run G = 18.2 m 80 = 0.2275 m ≈ 228 mm \text{Fall}_{\text{Leg 3}} = \frac{\text{Run}}{G} = \frac{18.2\text{ m}}{80} = 0.2275\text{ m} \approx 228\text{ mm} Fall Leg 3 = G Run = 80 18.2 m = 0.2275 m ≈ 228 mm Invert at Boundary Connection (Station 54.7 m) = 99.361 − 0.228 = RL 99.133 m \text{Invert at Boundary Connection (Station 54.7 m)} = 99.361 - 0.228 = \text{RL } 99.133\text{ m} Invert at Boundary Connection (Station 54.7 m) = 99.361 − 0.228 = RL 99.133 m
Total Cumulative Vertical Fall: Total Fall = 100.000 − 99.133 = 0.867 m = 867 mm \text{Total Fall} = 100.000 - 99.133 = 0.867\text{ m} = 867\text{ mm} Total Fall = 100.000 − 99.133 = 0.867 m = 867 mm
4. Available Fall Feasibility Audits
Before digging trench lines, the certifying drainlayer must conduct an Available Fall Feasibility Audit . This calculation determines whether site geometry physically permits a gravity connection, or whether a pumped wastewater sump (macerator station) is legally required.
The Feasibility Formula Available Fall = Upstream Fixed Invert − Downstream Fixed Invert − Total Chamber Drops \text{Available Fall} = \text{Upstream Fixed Invert} - \text{Downstream Fixed Invert} - \text{Total Chamber Drops} Available Fall = Upstream Fixed Invert − Downstream Fixed Invert − Total Chamber Drops Available Grade Ratio ( G ) = Total Horizontal Run Available Fall \text{Available Grade Ratio } (G) = \frac{\text{Total Horizontal Run}}{\text{Available Fall}} Available Grade Ratio ( G ) = Available Fall Total Horizontal Run
Worked Site Feasibility Problem
A client is building a secondary dwelling (minor residential unit) at the rear of an urban property:
Upstream Starting Invert: The proposed ensuite WC connection invert is fixed at RL 42.450 m \text{RL } 42.450\text{ m} RL 42.450 m .
Downstream Outfall: The council sewer lateral connection stub at the front boundary has an invert surveyed at RL 41.820 m \text{RL } 41.820\text{ m} RL 41.820 m .
Total Horizontal Run: The survey measures a horizontal distance of 44.0 metres 44.0\text{ metres} 44.0 metres .
The line includes one inline inspection chamber with a required 20 mm 20\text{ mm} 20 mm ( 0.020 m 0.020\text{ m} 0.020 m ) invert drop.
Proposed Pipe: DN 100 uPVC foul drain (statutory standard grade: 1 : 60 1:60 1 : 60 ).
Mathematical Evaluation
Calculate Net Available Fall: Gross Elevation Difference = 42.450 − 41.820 = 0.630 m \text{Gross Elevation Difference} = 42.450 - 41.820 = 0.630\text{ m} Gross Elevation Difference = 42.450 − 41.820 = 0.630 m Net Available Fall = 0.630 − 0.020 = 0.610 m = 610 mm \text{Net Available Fall} = 0.630 - 0.020 = 0.610\text{ m} = 610\text{ mm} Net Available Fall = 0.630 − 0.020 = 0.610 m = 610 mm
Determine Available Grade Ratio ( G G G ): G = Run Net Fall = 44.0 m 0.610 m = 72.13 G = \frac{\text{Run}}{\text{Net Fall}} = \frac{44.0\text{ m}}{0.610\text{ m}} = 72.13 G = Net Fall Run = 0.610 m 44.0 m = 72.13
The achievable gravity gradient across the site is 1 : 72.1 1:72.1 1 : 72.1 ( 1.39 % 1.39\% 1.39% or 13.9 mm/m 13.9\text{ mm/m} 13.9 mm/m ).
Engineering and Statutory Compliance Determination:
Standard minimum grade for DN 100 under NZBC G13/AS2 is 1 : 60 1:60 1 : 60 ( 1.67 % 1.67\% 1.67% ).
A grade of 1 : 72.1 1:72.1 1 : 72.1 is flatter than 1 : 60 1:60 1 : 60 . For a single minor dwelling, the connected loading is only approximately 6 6 6 to 10 DU 10\text{ DU} 10 DU , failing the 30 DU 30\text{ DU} 30 DU or 200 DU 200\text{ DU} 200 DU threshold required for approved reduced grades under G13/AS2 Table 2 or AS/NZS 3500.2 Table 3.2.2.
Action Required by Certifying Drainlayer: The installation cannot proceed as a standard gravity drain. The drainlayer must either:
Raise the house floor/subfloor plumbing invert by at least 123 mm 123\text{ mm} 123 mm to achieve 1 : 60 1:60 1 : 60 (Required Fall = 44.0 / 60 + 0.020 = 0.753 m 44.0 / 60 + 0.020 = 0.753\text{ m} 44.0/60 + 0.020 = 0.753 m ; Required Starting Invert = 41.820 + 0.753 = RL 42.573 m 41.820 + 0.753 = \text{RL } 42.573\text{ m} 41.820 + 0.753 = RL 42.573 m ); or
Submit an Alternative Solution with engineered hydraulic design to the BCA; or
Install a certified wastewater pumping station conforming to AS/NZS 3500.2 Clause 5.6.
5. Branch Length Limits & Fixture Grade Rules
In addition to main collector drains, certifying drainlayers must calculate falls and lengths for individual branch drains connecting to gully traps, floor wastes, and soil fixtures under NZBC G13/AS2 Section 3 and AS/NZS 3500.2 Clause 3.3.
Unvented Branch Drain Maximum Lengths (NZBC G13/AS2 Table 4)
When fixtures discharge through unvented branch drains into a vented main or gully trap, air movement is critical. If an unvented branch is laid too long or too steep, the rushing slug of water forms a full-bore plug that induces self-siphonage , pulling the water seal out of the fixture trap:
- Fixture Type Nominal Branch Size (DN) Minimum Permissible Grade Maximum Permitted Unvented Length
- Basin / Bidet DN 32 to DN 40 1:40 (2.50%) 2.5 metres
- Kitchen Sink / Tub DN 40 to DN 50 1:40 (2.50%) 3.5 metres
- Shower / Bath DN 40 to DN 50 1:50 (2.00%) 3.5 metres
- Water Closet (WC) DN 100 1:60 (1.67%) 10.0 metres (max 2 WCs)
- Floor Waste Gully DN 65 to DN 80 1:50 (2.00%) 10.0 metres
- Trap Siphonage from Excessive Branch Slope
Under NZBC Clause G13/AS1 and AS/NZS 3500.2, unvented discharge branches must not be installed at extreme slopes. If a basin or sink waste drops at a slope steeper than 1 : 20 1:20 1 : 20 ( 5.0 % 5.0\% 5.0% ) directly into an underground drain without an atmospheric relief vent or Air Admittance Valve (AAV), the hydraulic jump inside the pipe draws a negative pressure exceeding − 250 Pa -250\text{ Pa} − 250 Pa , emptying the fixture trap and venting sewer gases directly into the living space.
6. Practical Trade Calculation Faults & Traps +-------------------------------------------------------------------------+
- | DRAINLAYER TRADE TRAPS |
- | |
- | [!] THE UNIT MISMATCH DISASTER |
- | Dividing 45 metres of run by a fall of 750 mm without converting units |
- | (e.g. entering 45 / 750 = 0.06 instead of 45 / 0.75 = 60). Always keep |
- | both values in metres or both in millimetres! |
- | |
- | [!] FORGETTING THE MANHOLE DROP |
- | Calculating pipeline inverts straight through a manhole without adding |
- | the 20-50 mm chamber drop. When the downstream line is laid, water |
- | ponds inside the chamber channel, creating a permanent silt trap. |
- | |
- | [!] SLOPE LENGTH VS HORIZONTAL RUN |
- | Using the tape measure along the bottom of a 1:4 hillside trench as the |
- | horizontal run. Over 30 metres of pipe, this introduces a 3% error that |
- | misaligns boundary connection levels. |
- +-------------------------------------------------------------------------+