Study guide
12.4 Setting Out Methods: Laser Levels, Optical Instruments & Boning Rods
NZ PGDB Certifying Drainlayer Registration Examination Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Foul-Water Drainage System Design
1.1 Separated Drainage Systems & Cross-Connection Prevention 1.2 Drain Layout, Junctions, Bends & Sweep Connections 1.3 Gully Traps, Water Seals & Overflow Relief Gullies (ORG) 1.4 Boundary Connections, Inspection Shafts & Public Sewer Interface
2 Chapter 2: Drainage Ventilation & Commercial Waste Systems
2.1 Drainage Ventilation Systems, Relief Vents & Air Admittance Valves (AAVs) 2.2 Discharge Unit & Fixture Unit Sizing under G13/AS2 & AS/NZS 3500.2 2.3 Commercial Grease Interceptors & Oil/Grit Separators 2.4 Pumped Drainage Systems, Sumps & Rising Mains
3 Chapter 3: Stormwater Drainage & Surface Water Management
3.1 Stormwater Sizing & Flow Calculations to AS/NZS 3500.3 & E1/AS1 3.2 Stormwater Pits, Sumps, Silt Traps & Inlets 3.3 Soakage Systems, Retention & Detention Tanks 3.4 Overland Flow Paths & Secondary Flow Protection
4 Chapter 4: Drainage Testing & Quality Verification
4.1 Hydrostatic (Water) Testing Methods & Pressure Limits 4.2 Pneumatic (Air) Testing, Vacuum Testing & Leak Detection 4.3 CCTV Inspection, Defect Identification & As-Built Verification
5 Chapter 5: Trenching Safety & Confined Spaces
5.1 Excavation & Trenching Safety: Shoring, Battering & Benching 5.2 Confined Space Entry, Atmospheric Monitoring & Hazardous Gases 5.3 Underground Service Locating & Utility Strike Prevention 5.4 Site Health & Safety Management under the Health and Safety at Work Act 2015
6 Chapter 6: The Legislative & Regulatory Framework
6.1 Plumbers, Gasfitters, and Drainlayers Act 2006 & Board Functions 6.2 Licensing Classes, Registration Competencies & Annual Practising Licences 6.3 Disciplinary Regime, Offences, Complaints & Board Powers
7 Chapter 7: Certifying Drainlayer Authority & Site Supervision
7.1 Certifying Authority, Producer Statements & Records of Work 7.2 Supervision Principles: Direct vs General Supervision & Trainee Ratios 7.3 Professional Ethics, Continuing Professional Development (CPD) & Quality Assurance
8 Chapter 8: On-Site Wastewater System Design
8.1 AS/NZS 1547 Framework, Site Assessment & Soil Classification 8.2 Primary Treatment: Septic Tank Sizing, Baffles & Effluent Filters 8.3 Secondary Treatment: Aerated Wastewater Treatment Systems (AWTS) & Media Filters
9 Chapter 9: Land Application Systems & Environmental Protection
9.1 Land Application Systems: Absorption Trenches, Beds & Subsurface Drip Irrigation 9.2 Design Loading Rates (DLR), Reserve Areas & Hydraulic Sizing 9.3 Environmental Setbacks, Groundwater Protection & Resource Consents
10 Chapter 10: Pipe Materials, Jointing & Transitions
10.1 DWV Pipe Materials: uPVC, Vitrified Clay, PE & Concrete 10.2 Jointing Technologies: Solvent Cementing & Rubber Ring Joints 10.3 Dissimilar Material Adaptors, Flexible Couplings & Expansion Management
11 Chapter 11: Trench Bedding, Support & Backfill
11.1 Bedding Classes & Material Specifications under AS/NZS 3500.2 11.2 Cover Depths, Loading Conditions & Encasement Protection 11.3 Trench Backfill, Compaction Standards & Pipe Flotation Prevention
12 Chapter 12: Gradients, Invert Levels & Setting Out
12.1 Gradient Standards & Self-Cleansing Velocities under G13 & AS/NZS 3500.2 12.2 Fall, Grade & Run Calculations 12.3 Invert Level Calculations & Datum Relationships 12.4 Setting Out Methods: Laser Levels, Optical Instruments & Boning Rods
13 Chapter 13: Building Code Compliance & Service Separation
13.1 NZ Building Code Architecture: Clause G13, Clause E1 & Compliance Pathways 13.2 Service Separation: Clearances Between Foul Water, Stormwater & Other Utilities 13.3 Building Consent Authorities (BCAs), Code Compliance Certificates (CCC) & Council Inspections
14 Chapter 14: Examination Blueprint & Integrated Certifying Practice
14.1 Official Examination 9198 Blueprint, Logistics & Source Strategy 14.2 Plans, Specifications, Material Lists, Patterns, Tools & Equipment 14.3 Sustainability, Water Quality, Structural Integrity, Seismic & Geotechnical Resilience
12.4 Setting Out Methods: Laser Levels, Optical Instruments & Boning Rods
Key Takeaways Explain This Topic AI
Rotating pipe laser levels provide continuous line and grade control by projecting a visible collimated beam along a digital percentage grade directly onto a target plate.
Optical automatic levels establish true horizontal lines of collimation, utilizing Height of Instrument (HI) or Rise and Fall methods with mandatory arithmetic closure checks.
Sight rails and boning rods (travelers) provide a fail-safe mechanical setting-out method where sighting across three rails instantly reveals ground movement or settlement.
The Two-Peg Test is the essential field calibration check used by certifying drainlayers to detect and correct collimation error in optical levels.
Thermal air refraction ('trench shimmer') inside long or sunbaked pipes bends laser beams; certifying drainlayers must use air extraction or blowers to maintain beam accuracy.
Last updated: October 2026
Setting Out Methods: Laser Levels, Optical Instruments & Boning Rods
Setting out an underground drainage network requires transferring architectural design lines and engineering invert levels onto raw, uneven earth with uncompromising accuracy. In structural framing, a 5 mm variance might be absorbed by timber packers; in gravity drainage, a 5 mm vertical error over a 10-metre run at 1 : 60 1:60 1 : 60 represents a catastrophic 30 % 30\% 30% deviation in gradient , transforming an approved self-cleansing line into a sluggish silt trap or a high-velocity separator.
A registered Certifying Drainlayer must be fully competent in deploying both modern electronic instruments and traditional optical and mechanical leveling techniques. While self-leveling pipe lasers represent standard trade equipment on modern commercial and residential developments, certifying drainlayers must retain mastery of optical automatic levels (dumpy levels) and traditional sight rail and boning rod setups. When electronic lasers fail, battery supplies deplete, or deep trench excavations present line-of-sight obstructions, mechanical principles provide an infallible, physics-based method for verifying grade and alignment under NZBC Clause G13 and AS/NZS 3500.2:2021.
1. Rotating Pipe Laser Levels (The Modern Trade Standard)
Dedicated pipe lasers (such as Leica Piper, Topcon TP-L series, or Spectra Precision) are compact, ruggedized, waterproof instruments engineered specifically to operate inside manholes, pipes, and narrow trench excavations. +-------------------------------------------------------------+
- | PIPE LASER OPERATION IN TRENCH |
- | |
- | Manhole Base or Trench Start |
- | +---------------+ |
- | | Pipe Laser | === Red/Green Collimated Beam ===> |
- | | Digital Grade | (Set to -1.670% for 1:60) |
- | +---------------+ |
- | ^ Centering Legs |
- | ==================================================== |
- | Granular Bedding |
- | |
- | Newly Laid Pipe Barrel |
- | +--------------------------+ |
- | | Target Plate | |
- | | +--------------------+ | |
- | | | | | | |
- | Beam Strikes-> | |----+----*----+---- | | |
- | Centre Cross | | | | | |
- | | +--------------------+ | |
- | +--------------------------+ |
- +-------------------------------------------------------------+
- Operating Principles and Features
Digital Grade Input: The instrument features internal electronic pendulum sensors driven by precision stepper motors. The drainlayer inputs the required gradient directly via the digital interface as a percentage (e.g. entering -1.670% for a 1 : 60 1:60 1 : 60 fall, or +1.670% if shooting uphill).
Centering Feet & Self-Centering Geometry: The laser housing is fitted with interchangeable screw-in legs sized specifically to match standard pipe bores (DN 100, DN 150, DN 200, DN 225, DN 300). When placed inside the bell end or barrel of a starter pipe, the feet automatically centre the laser diode on the exact central horizontal axis of the pipe.
Grade Target Plate: A translucent plastic target marked with crosshairs and pipe diameter rings is slotted into the leading spigot or bell of each new pipe length as it is placed on the bedding. The pipe layer adjusts the pipe until the laser dot hits dead-centre on the crosshair target, ensuring both horizontal alignment (line) and vertical gradient (level) are perfect simultaneously.
Thermal Refraction Hazards ("Trench Shimmer")
A critical trade hazard when using pipe lasers over distances exceeding 20 metres is thermal refraction :
When a trench or newly laid pipe is exposed to intense sunlight, or conversely when cold morning air enters a warm pipe, air density layers form inside the barrel.
The laser beam bends (refracts) as it passes through air layers of varying temperature and density, causing the laser dot to drift upwards, downwards, or shimmer unpredictably.
Mitigation: Certifying drainlayers must operate a small 12-volt air extraction blower or ventilation fan to circulate air through the pipe bore, establishing uniform temperature and ensuring a straight, true laser beam.
2. Optical Automatic Levels & Metric Staff Reading
The optical automatic level (commonly referred to in the trade as a "dumpy level" or "auto-level") is the foundational leveling instrument of civil engineering and drainage. It utilizes an internal optical compensator (a magnetically or pneumatically damped pendulum prism) that automatically levels the line of sight (line of collimation) within a small operational window.
Reading the Metric "E-Face" Leveling Staff
Metric leveling staffs are divided into alternating black and red blocks and graduations on a white background: +-------------------------------------------------------------+
- | METRIC E-FACE STAFF READING |
- | |
- | Top of Meter Marker (e.g. Large '1') |
- | Decimeter Block (e.g. '04' = 1.400 m) |
- | |
- | 1.450 m --+ [E-Pattern Limb Top] |
- | | [Solid Block = 10 mm] |
- | 1.440 m --+ |
- | | [Open Space = 10 mm] |
- | 1.430 m --+ |
- | | [Crosshair Position = 1.424 m] |
- | 1.420 m --+-- ---- -- ---- -- ---- -- ---- Crosshair Line |
- | | [Estimate mm: 4 mm above 1.420 line] |
- | 1.410 m --+ |
- | | |
- | 1.400 m --+ |
- +-------------------------------------------------------------+
Metres: Indicated by large red or black whole-meter numerals (e.g. 1 , 2 ).
Decimetres: Indicated by two-digit numerals (e.g. 04 represents 0.4 m 0.4\text{ m} 0.4 m , giving 1.400 m 1.400\text{ m} 1.400 m if below the 1 meter mark).
Centimetres: Each alternating solid bar or open space of the "E" shape represents exactly 10 mm 10\text{ mm} 10 mm ( 0.010 m 0.010\text{ m} 0.010 m ) . The three horizontal bars of the letter "E" and the two spaces between them total 50 mm 50\text{ mm} 50 mm ( 0.050 m 0.050\text{ m} 0.050 m ).
Millimetres: The observer visually interpolates (estimates) within the 10 mm 10\text{ mm} 10 mm block from 1 1 1 to 9 mm 9\text{ mm} 9 mm ( 0.001 0.001 0.001 to 0.009 m 0.009\text{ m} 0.009 m ). A high-calibre certifying drainlayer consistently reads a staff to within ± 1 \pm 1 ± 1 to 2 mm 2\text{ mm} 2 mm .
Leveling Terminology
Backsight (BS): The very first staff reading taken after setting up the instrument, always taken on a point of known elevation (such as a Benchmark or Temporary Benchmark, TBM).
Foresight (FS): The final reading taken from an instrument setup, taken on a temporary change point (CP) before moving the instrument to a new tripod location.
Intermediate Sight (IS): Any staff reading taken on points of interest (ground surface, trench floor, pipe invert) between the Backsight and the Foresight.
Change Point (CP): A solid, immovable point (e.g. steel peg, prominent rock, or kerb) upon which the staff is held while the tripod is moved to a new position. The foresight is read on the CP from the old position, and the backsight is read on the identical CP from the new position.
The Collimation (Height of Instrument) Method
The Collimation Method is the fastest and most common method for calculating site levels: Height of Instrument (HI) = Known Benchmark RL + Backsight (BS) \text{Height of Instrument (HI)} = \text{Known Benchmark RL} + \text{Backsight (BS)} Height of Instrument (HI) = Known Benchmark RL + Backsight (BS) RL of Target Point = Height of Instrument (HI) − Intermediate Sight (IS) or Foresight (FS) \text{RL of Target Point} = \text{Height of Instrument (HI)} - \text{Intermediate Sight (IS) or Foresight (FS)} RL of Target Point = Height of Instrument (HI) − Intermediate Sight (IS) or Foresight (FS)
The Rise and Fall Method & Mathematical Checks
The Rise and Fall Method compares consecutive staff readings. Because a higher staff reading indicates a lower ground elevation: Difference = Previous Staff Reading − Current Staff Reading \text{Difference} = \text{Previous Staff Reading} - \text{Current Staff Reading} Difference = Previous Staff Reading − Current Staff Reading
If difference is positive , ground has risen: Rise = + Difference \text{Rise} = +\text{Difference} Rise = + Difference .
If difference is negative , ground has fallen: Fall = − Difference \text{Fall} = -\text{Difference} Fall = − Difference . Current RL = Previous RL + Rise or Current RL = Previous RL − Fall \text{Current RL} = \text{Previous RL} + \text{Rise} \quad \text{or} \quad \text{Current RL} = \text{Previous RL} - \text{Fall} Current RL = Previous RL + Rise or Current RL = Previous RL − Fall
The Three-Point Mathematical Closure Check
To prevent mathematical errors in field books, certifying drainlayers must perform the three-point check on every leveling sheet: Sum BS − Sum FS = Sum Rise − Sum Fall = Last RL − First RL \text{Sum BS} - \text{Sum FS} = \text{Sum Rise} - \text{Sum Fall} = \text{Last RL} - \text{First RL} Sum BS − Sum FS = Sum Rise − Sum Fall = Last RL − First RL
All three calculations must yield the identical number. If they do not, an arithmetic mistake exists in the reductions.
3. Traditional Sight Rails and Boning Rods (The Traveler Method)
Before optical lasers, drainage across the globe was set out using timber sight rails and boning rods (also known as travelers). In deep, wet, or hazardous trench conditions where electronic gear cannot be safely stationed, sight rails remain an essential, robust trade technique. +-------------------------------------------------------------+
- | SIGHT RAILS AND TRAVELER GEOMETRY |
- | |
- | Sight Rail 1 |
- | [RL = IL1 + T] |
- | +======+ Sight Rail 2 |
- | | | [RL = IL2 + T] |
- | === === +======+ |
- | | | | | Sight Rail 3 |
- | === === === === [RL=IL3 + T] |
- | | | | | +======+ |
- | | | | | | | |
- | -- - - - - - - Line of Sight - - - - - - - - - - - - - - |
- | | | | | === ===|
- | | | +---------+ | | | |
- | | | | Traveler| | | | |
- | | | | Rod (T) | | | | |
- | | | +----+----+ | | | |
- | | | | | | | |
- | | | | T | | | |
- | | | | | | | |
- | *======* *======* *======* |
- | Invert 1 Invert 2 Invert 3 |
- | ========================================================= |
- | Continuous Design Gradient Line (Fall / Run) |
- +-------------------------------------------------------------+
- Components and Setup
Sight Rails: Horizontal timber boards (typically 150 × 25 mm 150 \times 25\text{ mm} 150 × 25 mm dressed pine) securely nailed across twin upright stakes driven into firm ground spanning or offset from the proposed trench line. Sight rails are set up at minimum three points along a pipeline (upstream head, intermediate station, and downstream outfall).
Boning Rod (Traveler): A lightweight T-shaped rod made of wood or aluminum. The crosshead is perfectly perpendicular to the vertical leg. The vertical length of the traveler ( T T T ) is fixed and uniform (commonly 2.000 m 2.000\text{ m} 2.000 m , 2.500 m 2.500\text{ m} 2.500 m , or 3.000 m 3.000\text{ m} 3.000 m depending on trench depth).
Calculating Sight Rail Elevations
The elevation of each horizontal sight rail is calculated directly from the design invert level: Sight Rail RL = Design Invert Level (IL) + Traveler Length ( T ) \text{Sight Rail RL} = \text{Design Invert Level (IL)} + \text{Traveler Length } (T) Sight Rail RL = Design Invert Level (IL) + Traveler Length ( T )
To nail the rail at the exact height using an optical level: Required Staff Reading on Top of Rail = Height of Instrument (HI) − Sight Rail RL \text{Required Staff Reading on Top of Rail} = \text{Height of Instrument (HI)} - \text{Sight Rail RL} Required Staff Reading on Top of Rail = Height of Instrument (HI) − Sight Rail RL
The Three-Rail Alignment Check
A fundamental advantage of the sight rail method is instant, self-checking visual verification :
When looking across the tops of the three sight rails, they must form a single, unbroken, inclined plane of sight.
If any upright stake is knocked by an excavator, settles in soft clay, or is miscalculated, the three rails will not align in a straight plane. The defect is immediately obvious to the naked eye before a single pipe is laid.
Sighting with the Traveler in the Trench
The drainlayer places the foot of the boning rod on the pipe invert.
An observer sights across the tops of the upstream and downstream sight rails.
When the horizontal crosshead of the boning rod aligns precisely with the line of sight across the two sight rails, the pipe is on exact design grade.
If the traveler crosshead is above the line of sight, the trench must be dug deeper; if below, the trench has been over-excavated and requires compacted bedding.
4. Stringlines and Line Levels
For short branch drains (under 10 metres), subfloor suspended piping, or connecting gully traps to a nearby inspection junction, stringlines fitted with specialized line levels provide a quick setting-out method.
Rules for Stringline Accuracy
High-Tension Braided Nylon: Never use twisted cotton or polypropylene cord that stretches, sags, or absorbs moisture. Pull braided nylon stringline taut until it emits a high-pitched twang.
Midpoint Placement of Line Level: A line level weighs between 10 10 10 and 20 grams 20\text{ grams} 20 grams . If placed near an end post, its weight pulls the stringline down, creating an asymmetric catenary curve. The line level must always be suspended at the exact geometric midpoint between the two stakes, where catenary deflection is symmetrical.
Distance Limits: Stringlines must never be used for continuous runs exceeding 10 metres , nor for gradients flatter than 1 : 60 1:60 1 : 60 ( 1.67 % 1.67\% 1.67% ) .
5. Instrument Calibration: The Two-Peg Test
An optical automatic level must be calibrated before critical drainage work. Even a brand-new level can develop collimation error (where the internal line of sight is not truly horizontal when the circular bubble is centred) due to road transit vibrations, temperature fluctuations, or accidental knocks. +-------------------------------------------------------------+
- | THE TWO-PEG TEST GEOMETRY |
- | |
- | SETUP 1: Instrument Midway between Peg A and Peg B |
- | |
- | Line of Sight (Inclined by error e) |
- | - - - - - - - - - * - - - - - - - |
- | / | / |
- | Staff A Tripod Staff B |
- | |===| Midway |===| |
- | | | (15 m) | | |
- | Peg A Peg B |
- | *===* <--- True Height Diff = a1 - b1 ---> *===* |
- | |
- | SETUP 2: Instrument Moved Close to Peg A |
- | |
- | Tripod |
- | at Peg A Line of Sight (Inclined by error e) |
- | | - - - - - - - - - - - - - - - - - - - - - - |
- | Staff A Staff B |
- | |===| (a2) |===| (b2)
- +-------------------------------------------------------------+
- Two-Peg Test Field Procedure
Drive two firm wooden pegs (Peg A and Peg B) into level ground approximately 30 metres 30\text{ metres} 30 metres apart .
Setup 1 (Instrument at Midpoint): Set up the optical level exactly halfway between Peg A and Peg B ( 15 m 15\text{ m} 15 m from each). Take staff reading a 1 a_1 a 1 on Peg A and staff reading b 1 b_1 b 1 on Peg B.
Because the distances to Peg A and Peg B are identical, any collimation error ( e e e ) tilts the line of sight by the exact same amount at both pegs. The errors cancel out!
True Height Difference: Δ H = a 1 − b 1 \Delta H = a_1 - b_1 Δ H = a 1 − b 1
Setup 2 (Instrument Close to Peg A): Move the instrument and set it up within 2 2 2 to 3 metres 3\text{ metres} 3 metres of Peg A. Take staff reading a 2 a_2 a 2 on Peg A and staff reading b 2 b_2 b 2 on Peg B.
Calculate Collimation Error:
If the instrument has zero collimation error, reading b 2 b_2 b 2 must equal a 2 − Δ H a_2 - \Delta H a 2 − Δ H .
Expected Reading on Peg B: b 2 (expected) = a 2 − Δ H = a 2 − ( a 1 − b 1 ) b_{2\text{ (expected)}} = a_2 - \Delta H = a_2 - (a_1 - b_1) b 2 (expected) = a 2 − Δ H = a 2 − ( a 1 − b 1 )
Collimation Error: Error ( e ) = b 2 − b 2 (expected) \text{Error } (e) = b_2 - b_{2\text{ (expected)}} Error ( e ) = b 2 − b 2 (expected)
Tolerance and Adjustment:
If the error is less than 3 mm 3\text{ mm} 3 mm over 30 metres 30\text{ metres} 30 metres , the level is within acceptable trade tolerance.
If the error exceeds 3 mm 3\text{ mm} 3 mm , the instrument requires adjustment. With the staff still on Peg B, remove the reticle cap and turn the reticle adjusting screw with an allen key until the horizontal crosshair aligns with b 2 (expected) b_{2\text{ (expected)}} b 2 (expected) .
6. Worked Leveling Run & Field Book Record
Below is a complete, real-world drainage leveling run recorded by a certifying drainlayer establishing inverts along a proposed foul drainage pipeline.
Field Book Reduction (Rise and Fall Method)
Benchmark (TBM 1): Top of boundary survey peg. Known elevation = RL 50.000 m \text{RL } 50.000\text{ m} RL 50.000 m .
Station 1: Ground level at proposed gully trap.
Station 2: Invert of proposed gully trap outlet.
Station 3: Invert at inspection junction (Station 15.0 m 15.0\text{ m} 15.0 m ).
Station 4 (CP 1): Change point on top of kerb.
Station 5: Invert of council sewer connection stub.
Station Backsight (BS) Intermediate Sight (IS) Foresight (FS) Rise (+) Fall (-) Reduced Level (RL) Description & Remarks
- TBM 1 1.425 m RL 50.000 m Top of boundary peg (Verified site datum)
- Stn 1 1.150 m 0.275 m RL 50.275 m Ground Level at Gully Trap
- Stn 2 2.125 m 0.975 m RL 49.300 m Gully Trap Pipe Invert
- Stn 3 2.375 m 0.250 m RL 49.050 m Junction Invert (15 m run at 1:60)
- CP 1 1.840 m 1.620 m 0.755 m RL 49.805 m Change Point (Top of concrete kerb)
- Stn 5 2.455 m 0.615 m RL 49.190 m Council Sewer Lateral Invert
- Totals Sum = 3.265 m Sum = 4.075 m Sum = 1.030 m Sum = 1.840 m Mathematical Checks Below
- Arithmetic Closure Verification
Check 1 (BS vs FS): Sum BS − Sum FS = 3.265 − 4.075 = − 0.810 m \text{Sum BS} - \text{Sum FS} = 3.265 - 4.075 = -0.810\text{ m} Sum BS − Sum FS = 3.265 − 4.075 = − 0.810 m
Check 2 (Rise vs Fall): Sum Rise − Sum Fall = 1.030 − 1.840 = − 0.810 m \text{Sum Rise} - \text{Sum Fall} = 1.030 - 1.840 = -0.810\text{ m} Sum Rise − Sum Fall = 1.030 − 1.840 = − 0.810 m
Check 3 (RL Difference): Last RL − First RL = 49.190 − 50.000 = − 0.810 m \text{Last RL} - \text{First RL} = 49.190 - 50.000 = -0.810\text{ m} Last RL − First RL = 49.190 − 50.000 = − 0.810 m
All three checks balance exactly to − 0.810 m -0.810\text{ m} − 0.810 m , confirming that the field book reductions contain zero arithmetic errors.
- 7. Setting Out Trade Traps +-------------------------------------------------------------------------+
- | DRAINLAYER TRADE TRAPS |
- | |
- | [!] THE TRIPOD SHIFT WITHOUT A FORESIGHT |
- | Picking up the level tripod to move to a new vantage point without |
- | establishing a firm Change Point (CP) and taking a foresight reading. |
- | The entire leveling run is instantly ruined. |
- | |
- | [!] THE TRIMMED BONING ROD TRAP |
- | An apprentice cuts 50 mm off the bottom of a wooden traveler rod to |
- | 'clean up a splintered foot.' Every pipe laid that afternoon ends up |
- | 50 mm too shallow, creating backfall into the foundation. |
- | |
- | [!] THE TWO-PEG BLIND SPOT |
- | Using an optical level that has been rolling around in the back of a |
- | trade ute for six months without performing a Two-Peg Test. A 5 mm |
- | collimation error compounds over multiple setups, destroying grades. |
- +-------------------------------------------------------------------------+