Study guide
2.5 Cost of Power in a Circuit, Efficiency & Troubleshooting/Test Instruments
Oklahoma Journeyman Electrician Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Oklahoma Licensing Laws, Board Rules & Safety
1.1 Oklahoma Electrical License Act & CIB Regulations 1.2 OK Journeyman Exam Format, PSI Logistics & Codebook Navigation 1.3 OSHA Electrical Safety Standards (29 CFR 1926/1910) 1.4 NFPA 70E Electrical Safety in the Workplace & Arc Flash 1.5 Permits, Inspections, Structural Integrity & Job Estimating 1.6 Oklahoma's Adopted 2023 NEC: OUBCC Amendments You Must Know 1.7 OSHA 29 CFR 1926 Job-Site Safety: Sanitation, Signage, Ladders, Scaffolds & Fall Protection
2 Chapter 2: General Electrical Theory & Calculations
2.1 Ohm's Law, Watt's Law & DC Series/Parallel Circuits 2.2 AC Theory, Reactance, Impedance & Power Factor 2.3 Three-Phase Power Systems (Delta & Wye Configurations) 2.4 Electrical Units, Formulas & Conversions 2.5 Cost of Power in a Circuit, Efficiency & Troubleshooting/Test Instruments
3 Chapter 3: General Installation Requirements (NEC Article 110)
3.1 Examination, Identification, Installation & Use of Equipment (110.3) 3.2 Electrical Connections, Terminations & Torque Requirements (110.14) 3.3 Working Space, Clearances & Guarding of Live Parts (110.26 & 110.27) 3.4 Enclosure Types, Markings & Available Fault Current (110.24 & 110.28) 3.5 Installations Over 600 Volts: Article 110 Part III, Article 490 & Medium-Voltage Cable
4 Chapter 4: Branch Circuits & Feeders (NEC Articles 210, 215 & 225)
4.1 Branch Circuit Ratings, Multiwire Branch Circuits & Identification (210.3–210.10) 4.2 Ground-Fault Circuit-Interrupter (GFCI) Protection (210.8) 4.3 Arc-Fault Circuit-Interrupter (AFCI) Protection & Receptacle Outlets (210.12 & 210.52) 4.4 Outside Branch Circuits and Feeders (Article 225) & Feeder Sizing (Article 215)
5 Chapter 5: Services & Service Equipment (NEC Article 230)
5.1 Service Clearances, Overhead & Underground Service-Drop Requirements (230.9, 230.24 & 230.30) 5.2 Service-Entrance Conductors, Sizing & Installation (230.40–230.54) 5.3 Service Equipment Disconnecting Means, Overcurrent Protection & Emergency Disconnects (230.70–230.95)
6 Chapter 6: Electrical Load Calculations (NEC Article 220)
6.1 General Lighting, Small Appliance & Laundry Loads (NEC 220.41, 220.42, 220.45 & 220.52) 6.2 Standard Dwelling Unit Feeder & Service Calculations (NEC Article 220 Part III) 6.3 Optional Dwelling Unit Feeder & Service Calculations (NEC Article 220 Part IV) 6.4 Commercial & Multi-Family Load Calculations (Cooktops, Dryers, HVAC & Stores)
7 Chapter 7: Overcurrent Protection & Tap Rules (NEC Article 240)
7.1 Overcurrent Protection Fundamentals & Standard Ampere Ratings (240.4 & 240.6) 7.2 Feeder & Branch Circuit Tap Rules (NEC 240.21) 7.3 Ground-Fault Protection of Equipment & Selective Coordination (NEC 240.13, 240.86 & Article 245)
8 Chapter 8: Grounding and Bonding (NEC Article 250)
8.1 General Grounding Principles, System Grounding & Grounded Conductors (NEC 250.4, 250.20 & 250.24) 8.2 Grounding Electrode System & Grounding Electrode Conductor (GEC) Sizing (NEC 250.50, 250.52 & 250.66) 8.3 Equipment Grounding Conductors (EGC) Sizing & Installation (NEC 250.118, 250.120 & 250.122) 8.4 Bonding Requirements, Main/System Bonding Jumpers & Separately Derived Systems (NEC 250.28, 250.30 & 250.102)
9 Chapter 9: Wiring Methods & Materials (NEC Articles 300–314)
9.1 General Requirements for Wiring Methods, Underground Clearances & Firestopping (NEC Article 300) 9.2 Conductor Ampacity Ratings, Temperature Correction & Bundling Adjustments (Article 310 & Table 310.16) 9.3 Nonmetallic-Sheathed Cable (Type NM), Metal-Clad Cable (Type MC) & Armored Cable (Type AC) 9.4 Outlet, Device, Pull & Junction Boxes Sizing and Box Fill Calculations (NEC Article 314) 9.5 Temporary Installations (Article 590), Cranes & Hoists (Article 610), Elevators & Escalators (Article 620)
10 Chapter 10: Raceways, Tubing, Conduit Fill & Underground Systems
10.1 Rigid Metal Conduit (RMC), Intermediate Metal Conduit (IMC) & Electrical Metallic Tubing (EMT) 10.2 Nonmetallic Raceways (PVC, RTRC, Liquidtight) & Cable Trays (NEC Articles 352, 356, 392) 10.3 Conduit Fill Calculations (Chapter 9 Tables 1, 4 & 5, Annex C) & Pull Box Sizing (NEC 314.28)
11 Chapter 11: Motors, Controllers & Air Conditioning (NEC Articles 430 & 440)
11.1 Motor Full-Load Current (FLC), Branch Circuit Conductor Sizing & Disconnects (430.6, 430.22 & 430.102) 11.2 Motor Overload Protection & Motor Branch Circuit Short-Circuit/Ground-Fault Protection (430.32 & 430.52) 11.3 Motor Feeder Conductor Sizing & Feeder Overcurrent Protection (430.24 & 430.62) 11.4 Air Conditioning & Refrigeration Equipment (NEC Article 440: MCA, MOCP & Disconnects)
12 Chapter 12: Transformers & Equipment (NEC Articles 450, 410, 422 & 424)
12.1 Transformer Sizing, Protection & Voltage Calculations (NEC Article 450 & Table 450.3(B)) 12.2 Luminaires, Lampholders & Lamps Installation (NEC Article 410) 12.3 Appliances & Electric Water Heaters (NEC Article 422) 12.4 Fixed Electric Space-Heating Equipment (NEC Article 424) 12.5 Snow-Melting & De-Icing Equipment (Article 426) and Pipeline & Vessel Heating (Article 427) 12.6 Electric Signs & Outline Lighting (Article 600) and Lighting Systems 30 Volts or Less (Article 411)
13 Chapter 13: Special Occupancies & Hazardous Locations (NEC Articles 500–517)
13.1 Hazardous (Classified) Locations: Class I, II, and III (Articles 500, 501, 502 & 503) 13.2 Commercial Garages, Repair Facilities & Fuel Dispensing Facilities (Articles 511 & 514) 13.3 Health Care Facilities: Patient Care Spaces & Wiring Methods (Article 517) 13.4 Agricultural Buildings & Manufactured/Mobile Homes (Articles 547 & 550) 13.5 Bulk Storage Plants (Article 515) and Spray Application, Dipping & Coating (Article 516)
14 Chapter 14: Special Equipment, Swimming Pools & Low-Voltage Systems
14.1 Swimming Pools, Spas, Hot Tubs & Hydromassage Bathtubs (Article 680) 14.2 Emergency Systems, Legally Required & Optional Standby Systems (Articles 700, 701 & 702) 14.3 Class 1, 2, 3 & Class 4 Power-Limited Circuits (NEC Articles 722, 724, 725 & 726) and Fire Alarms (NEC Article 760) 14.4 RV Parks (Article 551), Floating Buildings (Article 553) & Marinas/Docking Facilities (Article 555)
2.5 Cost of Power in a Circuit, Efficiency & Troubleshooting/Test Instruments
Key Takeaways Explain This Topic AI
Operating cost is energy, not power: kWh = (watts ÷ 1000) × hours, and cost = kWh × the utility energy rate, so a load's cost depends as much on run hours as on its wattage.
Commercial bills add a demand charge in dollars per kW billed on the highest 15- or 30-minute demand interval of the month, which is why a short peak can cost more than steady consumption.
Apparent power in kVA equals kW ÷ power factor, so correcting power factor from 0.72 to 0.95 on a 100 kW load drops apparent power from 139 kVA to 105 kVA and cuts I²R losses proportionally to the square of the current reduction.
A megohmmeter measures insulation resistance in megohms at an applied DC test voltage (commonly 500 V or 1000 V) and must never be used on an energized circuit or on solid-state equipment left connected.
A three-point fall-of-potential ground resistance tester is the instrument that verifies the 25-ohm threshold in NEC 250.53(A)(2) Exception, which is why a single rod electrode is normally supplemented rather than tested.
Last updated: August 2026
2.5 Cost of Power in a Circuit, Efficiency & Troubleshooting/Test Instruments
Two sub-topics inside General Electrical Knowledge are neither Ohm's law nor code lookup: cost of power used in a circuit and troubleshooting and test systems . They are the questions where the exam asks what the electricity is worth and how you would find the fault.
1. From Watts to Dollars
Power is a rate; energy is the accumulation. The utility bills you for energy : kWh = P watts 1000 × t hours Cost = kWh × rate \text{kWh} = \frac{P_{\text{watts}}}{1000} \times t_{\text{hours}} \qquad \text{Cost} = \text{kWh} \times \text{rate} kWh = 1000 P watts × t hours Cost = kWh × rate
Worked example 1 — resistive load. A 4,500 W electric water heater element runs an average of 3 hours per day at $0.13/kWh.
- Daily energy: (4,500 ÷ 1000) × 3 = 13.5 kWh
- Daily cost: 13.5 × $0.13 = $1.76
- 30-day cost: $52.65
Worked example 2 — motor load, where efficiency enters. A 10 HP, 230 V, three-phase motor runs 8 hours a day, 22 days a month, at 92% efficiency and $0.11/kWh. Horsepower is output , so input power is output divided by efficiency:
- Output: 10 HP × 746 W/HP = 7,460 W
- Input: 7,460 ÷ 0.92 = 8,109 W = 8.11 kW
- Monthly energy: 8.11 × 8 × 22 = 1,427 kWh
- Monthly energy cost: 1,427 × $0.11 = $157
The 8% the motor wastes is not free — at 92% efficiency the customer pays for 649 W of heat every hour the motor runs.
Energy charge versus demand charge
- Billing component Unit What drives it
- Energy charge $/kWh Total consumption over the billing period
- Demand charge $/kW The single highest 15- or 30-minute average demand in the month
Power-factor penalty / kVA billing $/kVA or a multiplier Reactive current the utility must carry but cannot bill as kWh
This is why a plant that starts three large compressors simultaneously can pay more in demand charges than a plant that runs longer but staggers its starts. Staggered starting, soft starters, and load-shedding controls exist to shave the demand peak.
Power factor as money kVA = kW P F P F = cos θ = kW kVA \text{kVA} = \frac{\text{kW}}{PF} \qquad PF = \cos\theta = \frac{\text{kW}}{\text{kVA}} kVA = PF kW PF = cos θ = kVA kW
A 100 kW industrial load at 0.72 PF draws 100 ÷ 0.72 = 139 kVA . Corrected to 0.95 PF , the same real work needs 100 ÷ 0.95 = 105 kVA — a 24% reduction in current. Because conductor and transformer losses go as I², cutting current by 24% cuts those losses by roughly 42%. Capacitor banks and synchronous condensers pay for themselves out of that difference plus the avoided penalty.
- Conversion constants worth memorizing
- 1 HP = 746 W
- 1 kW = 3,412 BTU/hr
- 1 ton of cooling = 12,000 BTU/hr = 3.517 kW
- 1 kWh = 3.6 MJ
- 2. Troubleshooting and Test Systems
Troubleshooting is a discipline, not a guess. The sequence that survives an exam item and a service call is the same:
Define the symptom precisely. "The lights flicker when the A/C starts" is a different fault from "the lights are dim all the time."
Verify the supply before the load. Confirm voltage at the source; a tripped upstream device or an open neutral explains most "dead equipment" calls.
Half-split the circuit. Test at the electrical midpoint, then discard the half that tests good. Each measurement should cut the suspect length in half rather than walk it end to end.
Prove the instrument. Test-before-touch and test-after on a known live source — a non-contact tester that failed silently is worse than no tester.
Repair, then verify under load. A high-resistance connection only shows itself when current flows.
The instrument set
Instrument Measures Fault it finds Critical caution
Digital multimeter (DMM) Volts, amps, ohms, continuity Open circuits, voltage drop, blown fuses Must carry a CAT rating for the point of measurement — CAT III for distribution panels, CAT IV at the service and outdoors
Clamp-on ammeter (true RMS) Current without breaking the circuit Overloads, unbalanced phases, neutral current from harmonics An averaging meter reads low on nonlinear loads; clamping all conductors at once should read near zero unless there is a ground fault
Megohmmeter (insulation tester) Insulation resistance in megohms at 500 V or 1000 V DC Degraded, wet, or damaged insulation before it fails Never apply to an energized circuit; disconnect solid-state equipment and electronic ballasts or the test voltage will destroy them; discharge the conductor after testing
Low-resistance ohmmeter (ductor) Micro- and milliohms High-resistance bolted joints, corroded busbar splices Requires a de-energized, isolated joint
Non-contact voltage tester Presence of an AC field Quick live/dead screening only Not a verification instrument — it can false-negative on shielded cable and false-positive on induced voltage
Phase rotation tester ABC versus ACB sequence Motors that run backwards after a service change Verify rotation before coupling any pump, fan, or conveyor
Ground resistance tester Earth electrode resistance (three-point fall-of-potential) Electrode systems that cannot meet 25 ohms Auxiliary probes must be spaced along a straight line clear of buried metal
Infrared thermal imager Surface temperature Loose terminations, unbalanced phases, failing breakers Requires load on the circuit; an unloaded connection looks fine
Receptacle tester Basic wiring pattern Reversed hot/neutral, open ground Cannot detect a bootleg ground (neutral jumpered to the ground terminal), which reads "correct"
Fault signatures the exam likes
Open neutral on a multiwire branch circuit. Line-to-neutral voltages swing in opposite directions — one leg reads high (say 190 V) and the other low (say 40 V) while line-to-line stays near 240 V. The 120 V loads are in series across 240 V, and the lighter-loaded leg gets the higher voltage.
High-resistance connection. Voltage measured across the connection rises as current increases, and the joint runs hot under thermography. A resistance measurement on a de-energized, unloaded joint often reads acceptably low and hides the problem.
Shared neutral overload. A clamp on the neutral of a three-phase, four-wire circuit feeding nonlinear loads can read higher than any phase conductor because triplen harmonics add arithmetically in the neutral.
Bootleg ground. A receptacle tester shows correct wiring, but the equipment grounding conductor carries normal load current — found by clamping the EGC and seeing current where there should be none.
Voltage present but no current. An open in the load path; a meter reading source voltage across an open switch or an open element is normal, not a fault indication in itself.