Study guide
8.4 Bonding Requirements, Main/System Bonding Jumpers & Separately Derived Systems (NEC 250.28, 250.30 & 250.102)
Oklahoma Journeyman Electrician Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Oklahoma Licensing Laws, Board Rules & Safety
1.1 Oklahoma Electrical License Act & CIB Regulations 1.2 OK Journeyman Exam Format, PSI Logistics & Codebook Navigation 1.3 OSHA Electrical Safety Standards (29 CFR 1926/1910) 1.4 NFPA 70E Electrical Safety in the Workplace & Arc Flash 1.5 Permits, Inspections, Structural Integrity & Job Estimating 1.6 Oklahoma's Adopted 2023 NEC: OUBCC Amendments You Must Know 1.7 OSHA 29 CFR 1926 Job-Site Safety: Sanitation, Signage, Ladders, Scaffolds & Fall Protection
2 Chapter 2: General Electrical Theory & Calculations
2.1 Ohm's Law, Watt's Law & DC Series/Parallel Circuits 2.2 AC Theory, Reactance, Impedance & Power Factor 2.3 Three-Phase Power Systems (Delta & Wye Configurations) 2.4 Electrical Units, Formulas & Conversions 2.5 Cost of Power in a Circuit, Efficiency & Troubleshooting/Test Instruments
3 Chapter 3: General Installation Requirements (NEC Article 110)
3.1 Examination, Identification, Installation & Use of Equipment (110.3) 3.2 Electrical Connections, Terminations & Torque Requirements (110.14) 3.3 Working Space, Clearances & Guarding of Live Parts (110.26 & 110.27) 3.4 Enclosure Types, Markings & Available Fault Current (110.24 & 110.28) 3.5 Installations Over 600 Volts: Article 110 Part III, Article 490 & Medium-Voltage Cable
4 Chapter 4: Branch Circuits & Feeders (NEC Articles 210, 215 & 225)
4.1 Branch Circuit Ratings, Multiwire Branch Circuits & Identification (210.3–210.10) 4.2 Ground-Fault Circuit-Interrupter (GFCI) Protection (210.8) 4.3 Arc-Fault Circuit-Interrupter (AFCI) Protection & Receptacle Outlets (210.12 & 210.52) 4.4 Outside Branch Circuits and Feeders (Article 225) & Feeder Sizing (Article 215)
5 Chapter 5: Services & Service Equipment (NEC Article 230)
5.1 Service Clearances, Overhead & Underground Service-Drop Requirements (230.9, 230.24 & 230.30) 5.2 Service-Entrance Conductors, Sizing & Installation (230.40–230.54) 5.3 Service Equipment Disconnecting Means, Overcurrent Protection & Emergency Disconnects (230.70–230.95)
6 Chapter 6: Electrical Load Calculations (NEC Article 220)
6.1 General Lighting, Small Appliance & Laundry Loads (NEC 220.41, 220.42, 220.45 & 220.52) 6.2 Standard Dwelling Unit Feeder & Service Calculations (NEC Article 220 Part III) 6.3 Optional Dwelling Unit Feeder & Service Calculations (NEC Article 220 Part IV) 6.4 Commercial & Multi-Family Load Calculations (Cooktops, Dryers, HVAC & Stores)
7 Chapter 7: Overcurrent Protection & Tap Rules (NEC Article 240)
7.1 Overcurrent Protection Fundamentals & Standard Ampere Ratings (240.4 & 240.6) 7.2 Feeder & Branch Circuit Tap Rules (NEC 240.21) 7.3 Ground-Fault Protection of Equipment & Selective Coordination (NEC 240.13, 240.86 & Article 245)
8 Chapter 8: Grounding and Bonding (NEC Article 250)
8.1 General Grounding Principles, System Grounding & Grounded Conductors (NEC 250.4, 250.20 & 250.24) 8.2 Grounding Electrode System & Grounding Electrode Conductor (GEC) Sizing (NEC 250.50, 250.52 & 250.66) 8.3 Equipment Grounding Conductors (EGC) Sizing & Installation (NEC 250.118, 250.120 & 250.122) 8.4 Bonding Requirements, Main/System Bonding Jumpers & Separately Derived Systems (NEC 250.28, 250.30 & 250.102)
9 Chapter 9: Wiring Methods & Materials (NEC Articles 300–314)
9.1 General Requirements for Wiring Methods, Underground Clearances & Firestopping (NEC Article 300) 9.2 Conductor Ampacity Ratings, Temperature Correction & Bundling Adjustments (Article 310 & Table 310.16) 9.3 Nonmetallic-Sheathed Cable (Type NM), Metal-Clad Cable (Type MC) & Armored Cable (Type AC) 9.4 Outlet, Device, Pull & Junction Boxes Sizing and Box Fill Calculations (NEC Article 314) 9.5 Temporary Installations (Article 590), Cranes & Hoists (Article 610), Elevators & Escalators (Article 620)
10 Chapter 10: Raceways, Tubing, Conduit Fill & Underground Systems
10.1 Rigid Metal Conduit (RMC), Intermediate Metal Conduit (IMC) & Electrical Metallic Tubing (EMT) 10.2 Nonmetallic Raceways (PVC, RTRC, Liquidtight) & Cable Trays (NEC Articles 352, 356, 392) 10.3 Conduit Fill Calculations (Chapter 9 Tables 1, 4 & 5, Annex C) & Pull Box Sizing (NEC 314.28)
11 Chapter 11: Motors, Controllers & Air Conditioning (NEC Articles 430 & 440)
11.1 Motor Full-Load Current (FLC), Branch Circuit Conductor Sizing & Disconnects (430.6, 430.22 & 430.102) 11.2 Motor Overload Protection & Motor Branch Circuit Short-Circuit/Ground-Fault Protection (430.32 & 430.52) 11.3 Motor Feeder Conductor Sizing & Feeder Overcurrent Protection (430.24 & 430.62) 11.4 Air Conditioning & Refrigeration Equipment (NEC Article 440: MCA, MOCP & Disconnects)
12 Chapter 12: Transformers & Equipment (NEC Articles 450, 410, 422 & 424)
12.1 Transformer Sizing, Protection & Voltage Calculations (NEC Article 450 & Table 450.3(B)) 12.2 Luminaires, Lampholders & Lamps Installation (NEC Article 410) 12.3 Appliances & Electric Water Heaters (NEC Article 422) 12.4 Fixed Electric Space-Heating Equipment (NEC Article 424) 12.5 Snow-Melting & De-Icing Equipment (Article 426) and Pipeline & Vessel Heating (Article 427) 12.6 Electric Signs & Outline Lighting (Article 600) and Lighting Systems 30 Volts or Less (Article 411)
13 Chapter 13: Special Occupancies & Hazardous Locations (NEC Articles 500–517)
13.1 Hazardous (Classified) Locations: Class I, II, and III (Articles 500, 501, 502 & 503) 13.2 Commercial Garages, Repair Facilities & Fuel Dispensing Facilities (Articles 511 & 514) 13.3 Health Care Facilities: Patient Care Spaces & Wiring Methods (Article 517) 13.4 Agricultural Buildings & Manufactured/Mobile Homes (Articles 547 & 550) 13.5 Bulk Storage Plants (Article 515) and Spray Application, Dipping & Coating (Article 516)
14 Chapter 14: Special Equipment, Swimming Pools & Low-Voltage Systems
14.1 Swimming Pools, Spas, Hot Tubs & Hydromassage Bathtubs (Article 680) 14.2 Emergency Systems, Legally Required & Optional Standby Systems (Articles 700, 701 & 702) 14.3 Class 1, 2, 3 & Class 4 Power-Limited Circuits (NEC Articles 722, 724, 725 & 726) and Fire Alarms (NEC Article 760) 14.4 RV Parks (Article 551), Floating Buildings (Article 553) & Marinas/Docking Facilities (Article 555)
8.4 Bonding Requirements, Main/System Bonding Jumpers & Separately Derived Systems (NEC 250.28, 250.30 & 250.102)
Key Takeaways Explain This Topic AI
The Main Bonding Jumper (MBJ) under NEC 250.28 connects the grounded circuit conductor (neutral) to the equipment grounding conductor at the service equipment, sized per NEC Table 250.102(C)(1) with the mandatory 12.5% rule applied for ungrounded phase conductors exceeding 1100 kcmil copper.
A Separately Derived System (SDS; NEC 250.30), such as an isolation transformer or generator with a switched neutral, must have a System Bonding Jumper (SBJ) installed at only ONE location—either at the source or at the first disconnecting means, but NEVER at both.
The Grounding Electrode Conductor for a Separately Derived System (NEC 250.30(A)(5)) must be sized per NEC Table 250.66 and connected to the nearest accessible grounding electrode (such as structural building steel or metal water pipe within 5 feet of entry).
Under NEC 250.104, interior metal water piping systems and structural building steel must be bonded using Table 250.102(C)(1), whereas other metal piping (such as gas piping) is bonded using an EGC sized per Table 250.122 based on the circuit likely to energize the piping.
NEC 250.92(B) mandates robust bonding for service raceways and equipment; standard locknuts and double locknuts are strictly prohibited for service conduit bonding where concentric or eccentric knockouts are encountered, requiring bonding bushings with bonding jumpers.
Last updated: August 2026
Bonding Requirements, Main/System Bonding Jumpers & Separately Derived Systems (NEC 250.28, 250.30 & 250.102)
Bonding is the deliberate, permanent physical joining of metallic parts to establish electrical continuity and conductivity. Its mission is two-fold: prevent dangerous touch potential voltages on metal raceways and piping, and provide a heavy-duty fault path capable of conducting immense short-circuit currents without burning open. On the Oklahoma Journeyman examination, mastering the Main Bonding Jumper (MBJ) sizing rules, Separately Derived System (SDS) transformer connections under NEC 250.30 , and piping bonding under NEC 250.104 is essential for high test scores and safe field installations.
1. The Main Bonding Jumper (MBJ; NEC 250.28)
The Main Bonding Jumper is the vital link inside the service disconnecting means that connects the grounded circuit conductor (neutral) to the equipment grounding conductor and the service enclosure chassis. +---------------------------------------------------------------------------------------------------+
- | MAIN BONDING JUMPER (MBJ) SPECIFICATIONS (NEC 250.28) |
- | |
- | CONSTRUCTION TYPES (250.28(A)) IDENTIFICATION (250.28(B)) |
- | - Wire conductor (copper or aluminum) - Green bonding screw with hexagonal head |
- | - Copper or aluminum busbar that is clearly visible after installation. |
- | - Listed screw (green-finished) |
- | |
- | SIZING METHOD (250.28(D) & NEC Table 250.102(C)(1)) |
- | - Phase conductors ≤ 1100 kcmil Cu: Direct lookup in Table 250.102(C)(1). |
- | - Phase conductors > 1100 kcmil Cu: Mandatory 12.5% Circular Mil Rule. |
- +---------------------------------------------------------------------------------------------------+
Sizing the MBJ & The 12.5% Rule (NEC 250.102(C)(1) Note 1): If Area phase > 1 , 100 kcmil Cu ⟹ Area MBJ ≥ Area phase × 0.125 ( 12.5 % \text{If } \text{Area}_{\text{phase}} > 1,100\text{ kcmil Cu} \implies \text{Area}_{\text{MBJ}} \ge \text{Area}_{\text{phase}} \times 0.125\ (12.5\% If Area phase > 1 , 100 kcmil Cu ⟹ Area MBJ ≥ Area phase × 0.125 ( 12.5%
Worked Sizing Example: A 2,500-Ampere, 480V service has six 500 kcmil copper conductors per phase in six parallel conduits ( 6 × 500 = 3 , 000 kcmil 6 \times 500 = 3,000\text{ kcmil} 6 × 500 = 3 , 000 kcmil total per phase):
Total area per phase = 3 , 000 kcmil 3,000\text{ kcmil} 3 , 000 kcmil ( 3 , 000 , 000 cmil 3,000,000\text{ cmil} 3 , 000 , 000 cmil ).
Because 3 , 000 kcmil > 1 , 100 kcmil 3,000\text{ kcmil} > 1,100\text{ kcmil} 3 , 000 kcmil > 1 , 100 kcmil , apply the 12.5% rule: Required MBJ Area = 3 , 000 kcmil × 0.125 = 375 kcmil \text{Required MBJ Area} = 3,000\text{ kcmil} \times 0.125 = 375\text{ kcmil} Required MBJ Area = 3 , 000 kcmil × 0.125 = 375 kcmil
Looking up standard conductor sizes in Chapter 9, Table 8:
350 kcmil = 350 , 000 cmil 350,000\text{ cmil} 350 , 000 cmil (Too small)
400 kcmil = 400 , 000 cmil 400,000\text{ cmil} 400 , 000 cmil (Compliant: 400 kcmil ≥ 375 kcmil 400\text{ kcmil} \ge 375\text{ kcmil} 400 kcmil ≥ 375 kcmil ).
Result: The Main Bonding Jumper must be not smaller than 400 kcmil Copper .
2. Separately Derived Systems (SDS; NEC 250.30)
A Separately Derived System is an electrical premises source whose power is generated on-site, having no direct electrical connection (including a solidly connected neutral conductor) to supply conductors originating in another system.
Common Examples: Step-down transformers (e.g., 480V delta primary to 208Y/120V wye secondary), solar PV standalone inverters, and backup generators equipped with a 4-pole transfer switch that switches the neutral conductor.
Non-SDS Generator: If a backup generator feeds a 3-pole transfer switch where the neutral is solidly connected through to the main service, the generator is NOT a separately derived system and must NOT have a bonding jumper installed at the generator frame. +---------------------------------------------------------------------------------------------------+
- | SEPARATELY DERIVED SYSTEM (TRANSFORMER) GROUNDING ARCHITECTURE |
- | |
- | 480V 3-Phase Primary Feeder |
- | ================================+ |
- | | |
- | v |
- | +---------------------------------------------+ |
- | | 480V - 208Y/120V DRY TRANSFORMER | |
- | | | |
- | | [Secondary Wye Coils] | |
- | | | | |
- | | +----> Neutral (X0 Terminal) | |
- | | || | |
- | | || <=== SYSTEM BONDING | |
- | | vv JUMPER (SBJ) | |
- | | +--[Enclosure Ground Bar] | |
- | | | | | |
- | +---------|---------|-------------------------+ |
- | | | |
- | Supply-Side Bonding | | Grounding Electrode Conductor (GEC) |
- | Jumper (SSBJ) | | (Sized per Table 250.66) |
- | (Table 250.102(C)(1)) | | |
- | v v |
- | [208Y/120V Panel] { Building Steel / Metal Water Pipe within 5 ft } |
- +---------------------------------------------------------------------------------------------------+
Key Separately Derived System Rules (NEC 250.30(A)):
System Bonding Jumper (SBJ; NEC 250.30(A)(1)): An unspliced SBJ connects the derived neutral ( X 0 X_0 X 0 ) to the equipment grounding conductor and metal enclosure. It must be installed at only one single location —either at the transformer source or at the first derived disconnect/panelboard, but NEVER at both .
Supply-Side Bonding Jumper (SSBJ; NEC 250.30(A)(2)): Where the SBJ is located in the first panelboard rather than inside the transformer, a metal raceway or wire SSBJ sized per NEC Table 250.102(C)(1) must connect the transformer enclosure to the panelboard enclosure.
Grounding Electrode Conductor (GEC; NEC 250.30(A)(5)): Each SDS must connect to a grounding electrode via a GEC sized per NEC Table 250.66 based on the derived secondary phase conductors. The GEC must connect to the nearest accessible building structural steel or metal water pipe within 5 feet of building entry.
3. Bonding of Piping Systems & Structural Metal (NEC 250.104)
Metallic piping systems and exposed structural steel frames throughout a building are subject to accidental energization from frayed wiring, lightning surges, or ground faults. NEC 250.104 establishes strict sizing criteria: +---------------------------------------------------------------------------------------------------+
- | BONDING OF BUILDING SYSTEMS MATRIX (NEC 250.104) |
- | |
- | SYSTEM / STRUCTURE SIZING CODE TABLE SIZING BASIS |
- | ------------------------------- ------------------------- ----------------------------------- |
- | 1. Interior Metal Water Piping NEC Table 250.102(C)(1) Largest ungrounded service conductor |
- | (NEC 250.104(A)) (Capped at 3/0 Cu in Table) |
- | |
- | 2. Other Metal Piping NEC Table 250.122 Rating of the specific branch circuit|
- | (Gas, compressed air, etc.) likely to energize the piping. |
- | (NEC 250.104(B)) |
- | |
- | 3. Structural Metal Frame NEC Table 250.102(C)(1) Largest ungrounded service conductor |
- | (NEC 250.104(C)) |
- +---------------------------------------------------------------------------------------------------+
Gas Piping Bonding Distinction (NEC 250.104(B)):
Standard Rule: Interior metal gas piping is considered bonded if it is connected to equipment (such as a gas furnace, gas water heater, or gas range) that is supplied by an electrical branch circuit with a properly sized equipment grounding conductor (per Table 250.122).
Corrugated Stainless Steel Tubing (CSST): Yellow CSST gas piping systems have thin walls susceptible to puncture from lightning-induced arcing. Manufacturer installation instructions and local Oklahoma amendments frequently mandate a dedicated #6 AWG copper direct bonding jumper connected between the rigid gas manifold and the service equipment enclosure.
4. Service Raceway & Enclosure Bonding (NEC 250.92)
Because service conductors operate ahead of the main circuit breaker, a ground fault occurring in a service raceway is backed by the full short-circuit fault current of the utility grid. Mechanical locknuts cannot withstand these massive fault energies without blowing apart. +---------------------------------------------------------------------------------------------------+
- | SERVICE RACEWAY BONDING METHODS (NEC 250.92(B)) |
- | |
- | PERMITTED BONDING METHODS PROHIBITED FOR SERVICE RACEWAYS |
- | ----------------------------------------------- -------------------------------------------- |
- | 1. Threaded hubs on enclosures made up wrench- 1. Standard locknuts with concentric or |
- | tight. eccentric knockouts. |
- | 2. Threadless couplings/connectors made up tight. 2. Standard double locknuts on service conduit |
- | 3. Listed bonding bushings with bonding jumpers punched with oversized knockouts. |
- | sized per Table 250.102(C)(1). |
- | 4. Bonding locknuts (on clean punchings without |
- | eccentric/concentric knockouts). |
- +---------------------------------------------------------------------------------------------------+
The Concentric / Eccentric Knockout Rule (NEC 250.92(B) & 250.97):
Where service conduits enter a sheet metal enclosure through concentric or eccentric knockouts (multi-ring factory punchings), the electrical continuity of the remaining metal rings is unreliable under severe fault currents. Electricians must install a listed bonding bushing equipped with a bonding jumper wire routed to the service grounded neutral bus to guarantee an unbroken, low-impedance fault clearing path.