Study guide
Bonds, insurance, and financial responsibility
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Bonds, insurance, and financial responsibility
Key Takeaways Explain This Topic AI
The 2026 business bond is $20,000, except $15,000 for probationary businesses.
LCB requires at least $500,000 liability coverage and certificate-holder documentation.
A surety bond does not indemnify the contractor against its own obligations.
Claim deadlines depend on claim type and trigger date.
Last updated: October 2026
Note
For 2026, the business bond is $20,000 except $15,000 for probationary businesses. LCB requires at least $500,000 general liability coverage and a certificate naming LCB as certificate holder. Workers' compensation depends on covered employment and applicable exemptions.
The Legal Nature and Function of the Landscape Surety Bond
A central principle of Oregon landscape contracting law is that a surety bond is not insurance . While an insurance policy protects the contractor against covered losses, a surety bond is a statutory three-party tripartite contract established solely to protect the public from contractor malfeasance, incompetence, or default.
The three parties in the bond agreement are:
The Principal: The licensed Landscape Contracting Business that promises to perform all work in accordance with Oregon statutes and contractual specifications.
The Obligee: The State of Oregon through the Landscape Contractors Board, acting on behalf of affected property owners, employees, subcontractors, and suppliers.
The Surety: An admitted commercial bonding or insurance carrier that financially guarantees the contractor's statutory compliance up to the full penal sum of the bond.
Who Can File a Claim Against the Bond?
Under ORS 671.690, the bond exists to reimburse specific classes of damaged claimants:
Property Owners: Consumers damaged due to negligent or improper landscape construction, failure to complete a project, or breach of written contract.
Employees: Workers who performed labor on landscape projects and suffered non-payment of earned wages.
Material Suppliers: Vendors who supplied nursery stock, rock, irrigation equipment, or building materials used on job sites and remained unpaid.
Subcontractors: Trade subcontractors hired by the landscape business who were not paid for completed work.
Warning
A surety payment can create reimbursement obligations under the indemnity agreement and reduce available bond security. Maintain the bond required for active licensure and comply with LCB's replenishment or replacement instructions. Do not assume every payment automatically suspends the license until every surety expense is repaid; licensing status and contractual reimbursement are distinct issues.
Current bond requirement and premium distinction
Effective January 1, 2026, Oregon landscape contracting businesses require a $20,000 surety bond, except probationary businesses, which require $15,000. The former graduated amounts are not the current schedule. The requirement does not increase merely because annual sales cross a revenue threshold. Confirm the correct bond form, principal name, effective dates, and required filing with LCB.
The bond's face amount is the amount of security, not the price paid to buy it. If an illustrative premium were 2% of a $20,000 bond, the premium would be $400; the percentage is an example, not a published Oregon rate. A surety can seek reimbursement from the bonded business under the indemnity agreement after paying a valid claim. A bond therefore differs from liability insurance purchased to transfer covered risks.
Several claims can compete for limited security. A $20,000 bond is not a promise that every dissatisfied owner receives $20,000, nor that each separate project has a fresh $20,000 reserve. Maintain adequate records, resolve disputes promptly, and replenish security when required by the board. LCB bond and insurance requirements .
Claims Adjudication Process and Board Determination
When a contractual dispute or workmanship defect occurs, a claimant must follow formal administrative procedures under OAR Chapter 808 to access bond funds:
Claims: trigger dates and claim types
LCB's 2026 LRB guide distinguishes claim categories. Breach-of-contract, negligent-work, and improper-work claims generally must be filed within one year after the work was substantially fulfilled, excluding warranty work, or after work ceased. Material, equipment, and employee compensation claims use one year from the date money was owed. State tax claims use one year from the due date. These are not interchangeable with construction lien recording deadlines.
For example, an owner's completion-related claim and a supplier's unpaid invoice can arise from one project but have different trigger dates. A warranty visit does not automatically restart the original substantial-fulfillment clock. Record the contract, actual cessation or completion date, invoices, payments, and correspondence. A claimant should consult LCB promptly rather than assume an informal negotiation suspends a filing deadline.
Investigation, orders, and payment
The board's claims process evaluates eligibility and evidence, offers dispute-resolution opportunities, and can lead to a proposed order. The LRB guide gives 21 days to request a hearing on a proposed order and 60 days to pay a final order. Follow the actual notice's instructions and dates; a proposed order and a final payment order are different procedural stages.
Bond payment is subject to the claim process and statutory priorities, not simply first complaint wins. A contractor should notify the insurer or surety as appropriate, retain documents, and respond within the stated deadlines. Liability coverage and bond security can address different obligations. The presence of insurance does not excuse failing to comply with a board order.
Liability insurance and certificate documentation
LCB requires at least $500,000 general liability coverage and a certificate naming the board as certificate holder. This is separate from the surety bond. Do not use an obsolete $100,000 basic-operation minimum or assume the requirement changes only when a contractor adds hardscape work.
Liability insurance addresses covered bodily injury and property damage subject to policy terms, exclusions, limits, and deductibles. A policy may exclude particular activities, pollution, professional design, or damage to the contractor's own work. Review the actual coverage with the insurer instead of promise that every defective installation is insured. Being a certificate holder is not the same as being an additional insured.
Keep the insured business name, effective dates, and operations consistent with the licensed entity. Confirm cancellation and renewal requirements with the insurer and LCB; the certificate's wording alone does not create an unconditional thirty-day cancellation promise. Notify the appropriate carrier promptly when an incident or claim may require notice and preserve photographs, contracts, and witness information.
Workers' compensation and independent contractors
Covered employees require workers' compensation insurance. Owner, partner, corporate-officer, and LLC-member exemptions have specific legal conditions; do not apply one universal ten-percent ownership rule to every entity. Confirm status with Oregon's Workers' Compensation Division and the insurer before treating an owner or worker as exempt. General liability insurance does not replace workers' compensation.
An independent business relationship depends on actual facts and the applicable legal test. Under ORS 670.600, relevant conditions include freedom from direction and control, an independently established business, responsibility for required licenses, and the statute's business-independence criteria. Tax, wage, and insurance programs can require their own analysis. A Form 1099 is a reporting document, not a license or proof of independent status.
For example, a worker using the landscape company's tools, following its daily assignments, and working under its LCP should not be converted into an unlicensed subcontractor by changing payment paperwork. LCB requires unlicensed construction workers to be employees under appropriate supervision. A separately licensed subcontracting business must cover its own authorized scope and employment obligations.
Include actual payroll taxes, insurance, and benefits in labor estimates. Keep employment, contractor, and insurance records consistent with the real operation. When the business changes from sole owner to a staffed crew, review coverage before the first employee works; waiting until an injury occurs defeats the purpose.