1 1. Licensing and business: 1

Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility

2 2. Licensing and business: 2

Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens

3 3. Licensing and business: 3

LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing

4 4. Site safety and utilities

Excavation safety and hazard controls Oregon 811 notices and utility protection

5 5. Soil science and site preparation: 1

Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity

6 6. Soil science and site preparation: 2

Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds

7 7. Plants, turf, and establishment: 1

Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions

8 8. Plants, turf, and establishment: 2

Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth

9 9. Plants, turf, and establishment: 3

Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations

10 10. Plants, turf, and establishment: 4

Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials

11 11. Paving and concrete: 1

Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout

12 12. Paving and concrete: 2

Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing

13 13. Paving and concrete: 3

Concrete joints and curing

14 14. Walls and exterior structures: 1

Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings

15 15. Walls and exterior structures: 2

Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure

16 16. Walls and exterior structures: 3

Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions

17 17. Walls and exterior structures: 4

Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality

18 18. Design, grading, and drainage: 1

Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures

19 19. Design, grading, and drainage: 2

Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall

20 20. Design, grading, and drainage: 3

Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets

21 21. Design, grading, and drainage: 4

Bioretention sizing, media, and plants Swales and current DEQ erosion controls

22 22. Irrigation design and operation: 1

Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting

23 23. Irrigation design and operation: 2

Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage

24 24. Irrigation design and operation: 3

Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves

25 25. Irrigation design and operation: 4

Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions

26 26. Irrigation design and operation: 5

Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup

27 27. Backflow and potable protection: 1

Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies

28 28. Backflow and potable protection: 2

Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports

Exam structure, reference use, and license routes

Key Takeaways Explain This Topic AI

Six sections total 350 scored questions for All Phase.

Each section requires 75%; Backflow is closed book.

Choose sections from the intended license phase and distinguish testing fees from license fees.

Last updated: October 2026

Six separate examinations

Oregon's Landscape Construction Professional examination has six separately scored sections. Laws, Rules and Business Practices, Plants & Turf, Hardscaping, Design/Grading/Drainage, and Backflow each contain fifty scored questions with one hundred minutes allowed. Irrigation contains one hundred scored questions with two hundred minutes allowed. Passing requires seventy-five percent on each required section. There is no compensating aggregate score: a strong Irrigation result cannot offset a failed Backflow result.

For All Phase, the total is 350 scored questions and 700 scheduled minutes across the six sections. This is an arithmetic total, not a promise that all six are one continuous appointment. PSI may include experimental questions that do not count toward the score; follow the bulletin's instructions on those items and timing. A fifty-question section requires at least thirty-eight correct scored responses to reach seventy-five percent, since thirty-seven is seventy-four percent. Irrigation requires at least seventy-five of its hundred scored questions.

Standard requires LRB and the three general sections. Planting Only requires LRB, Plants & Turf, and Design/Grading/Drainage. Irrigation and Backflow Only requires LRB, Irrigation, and Backflow. Modified requires LRB with its scope limits; Arborist requires the applicable ISA credential and LRB. Probationary requires all six within its special deadline. Confirm the phase before paying for appointments, because study-guide breadth does not dictate which sections a particular applicant must take.

Open book and closed book

Five sections permit the approved reference materials. Backflow is closed book. A backflow reference on the study-material list does not make that section open book; it describes preparation material. Learn definitions, hydraulic capabilities, hazard selection, and installation relationships well enough to answer without searching a reference during that section.

For in-person PSI testing, reference books are provided at the testing site; candidates cannot substitute their own books. For remote testing, candidates supply the approved printed references and follow PSI's restrictions. LCB and PSI prohibit internet printouts, photocopies, and loose papers for virtual testing. Downloaded preparation material is not an approved substitute for the required examination references. Check the latest bulletin for permitted tabs, markings, calculator, identification, and remote room rules. A digital copy on another monitor is not an approved printed reference.

Some prescribed examination references use older editions, including the listed 2011 plumbing reference. Distinguish the exam's designated reference from the current code governing field work. This guide uses current Oregon administrative requirements for current licensing facts and identifies the exam-reference issue; it does not silently treat an old printed edition as the current construction code. Bring or use only what PSI approves for the actual appointment.

Scheduling, fees, and deadlines

PSI's bulletin lists seventy-five dollars for the first section and ten dollars for each additional section taken the same day. Thus three sections scheduled together cost ninety-five dollars under that fee rule, while three first-section appointments on separate days can cost more. These are testing charges, separate from LCB application, license, renewal, and business charges. Confirm the fee at booking, particularly for retesting or a different testing route.

Passed sections generally remain valid for twenty-four months. Probationary candidates must pass all six within one year of the first sitting. Record the actual dates and eligibility expiration rather than assume a failed attempt restarts every deadline. PSI permits cancellation or rescheduling without forfeiting the fee when notice is received two days before the appointment; its example allows Saturday notice for a Monday appointment. A voicemail is not an accepted cancellation. Use the website or speak to the registrar and preserve confirmation.

LCB also recognizes specified SBDC course-exam and NALP Exterior Technician certification routes. These do not create a blanket exemption from all sections or make Backflow unnecessary. The SBDC option's eligibility restrictions and the exact NALP certification matter. A course attendance certificate is not the same as the accepted industry certification. Compare the intended route with LCB's current table before relying on an alternative.

Preparation that fits the examination

Start with the LRB rules and license phase, then study plant and soil fundamentals, construction, drainage, irrigation, and backflow. Irrigation has twice the scored items of each other module, and its design topic is especially substantial. Practice calculations with units and a written pressure or quantity ledger. In open-book practice, learn where a provision lives and distinguish its conditions rather than repeatedly search an entire book. In closed-book practice, compare assembly capabilities and explain why a plausible alternative fails.

Finish preparation by checking current LCB logistics, PSI reference instructions, and the documents attached to the appointment. Passing required sections does not authorize contracting until the individual and business licensing requirements are satisfied. LCB exam page and PSI candidate bulletin support the route and logistics above.

Reference table

  • Section Scored questions Minutes References
  • LRB; Plants & Turf; Hardscaping; Design/Grading/Drainage 50 each 100 each Approved references
  • Irrigation 100 200 Approved references
  • Backflow 50 100 Closed book

The PSI bulletin specifies a one-inch-to-twenty-feet grading plan for Design/Grading/Drainage and calculations rounded to two decimal places. Keep precision through intermediate work, convert units explicitly, and round the reported result as instructed. Verify the permitted calculator before the appointment.