Study guide

Employee status, paid work, and payroll calculations

Oregon Landscape Contractor License Study Guide 2026

Track your progress as you read

Finished sections get a check mark.

1 1. Licensing and business: 1

Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility

2 2. Licensing and business: 2

Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens

3 3. Licensing and business: 3

LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing

4 4. Site safety and utilities

Excavation safety and hazard controls Oregon 811 notices and utility protection

5 5. Soil science and site preparation: 1

Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity

6 6. Soil science and site preparation: 2

Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds

7 7. Plants, turf, and establishment: 1

Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions

8 8. Plants, turf, and establishment: 2

Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth

9 9. Plants, turf, and establishment: 3

Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations

10 10. Plants, turf, and establishment: 4

Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials

11 11. Paving and concrete: 1

Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout

12 12. Paving and concrete: 2

Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing

13 13. Paving and concrete: 3

Concrete joints and curing

14 14. Walls and exterior structures: 1

Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings

15 15. Walls and exterior structures: 2

Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure

16 16. Walls and exterior structures: 3

Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions

17 17. Walls and exterior structures: 4

Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality

18 18. Design, grading, and drainage: 1

Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures

19 19. Design, grading, and drainage: 2

Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall

20 20. Design, grading, and drainage: 3

Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets

21 21. Design, grading, and drainage: 4

Bioretention sizing, media, and plants Swales and current DEQ erosion controls

22 22. Irrigation design and operation: 1

Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting

23 23. Irrigation design and operation: 2

Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage

24 24. Irrigation design and operation: 3

Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves

25 25. Irrigation design and operation: 4

Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions

26 26. Irrigation design and operation: 5

Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup

27 27. Backflow and potable protection: 1

Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies

28 28. Backflow and potable protection: 2

Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports

Employee status, paid work, and payroll calculations

Key Takeaways Explain This Topic AI

A Form 1099 does not determine independent-contractor status.

Nonexempt employees generally earn overtime after forty hours worked in a workweek.

Record preparation, travel between jobs, and other compensable work rather than only time installing materials.

Last updated: October 2026

Classify the relationship before pricing labor

A crew member who works to the company's schedule, uses its equipment, follows its supervisor, and performs its construction work may be an employee even if paid by the piece or issued a Form 1099. Independent-contractor status depends on the applicable legal test, including control and an independently established business under ORS 670.600 where that test applies. Tax, wage, unemployment, and workers' compensation programs can require their own analysis. A written label does not override the actual facts.

LCB specifically says an unlicensed person performing construction under an LCP must be an employee of the licensed landscape business; an unlicensed worker cannot be treated as a “1099 employee.” A real subcontractor should have its own required business and individual credentials, appropriate insurance, and a defined contractual scope. Verify these before subcontracting, and do not assume an owner's personal LCP license licenses an unrelated business.

Classification affects withholding, payroll reporting, workers' compensation, employment protections, and project cost. Misclassifying a crew does not create genuine savings; it hides obligations and can leave the contractor with back wages, taxes, insurance liabilities, and board issues. For estimates, build the cost of lawful employment into the labor rate rather than count only the hourly wage.

What counts as paid work

Oregon BOLI explains that employers must pay for all hours worked, including work permitted even if it was not requested. Required loading, equipment checks, job cleanup, and travel between assigned sites can be compensable. An ordinary commute and special travel situations require the applicable travel-time analysis. Do not automatically start the payroll clock only when the first shovel enters the soil.

Consider a crew required to report to the shop at 7:00, load tools, travel to the first job, install a fence, travel to a second job, and unload at the shop. Those required activities are part of the work record. The estimate may allocate travel to a job or to overhead, but an accounting category does not decide whether the employee must be paid. Keep daily start, stop, meal, and job-allocation records sufficiently precise to support payroll and job costing.

Employers cannot erase unauthorized overtime that they allowed an employee to work. They may enforce scheduling policies, but must pay required wages for actual work. Rounding and automatic meal deductions can conceal short work periods or interrupted meals; use Oregon's current timekeeping requirements. BOLI paid-time guidance .

Overtime calculation

Unless a specific exemption applies, overtime is at least one and one-half the regular rate for hours worked over forty in a workweek. Do not average a forty-five-hour week with a thirty-five-hour week to avoid overtime. A landscape installer is not automatically subject to agricultural overtime merely because the job involves plants. The employer must determine the actual occupation and applicable rules.

For an uncomplicated example with a twenty-four-dollar hourly regular rate and forty-six hours worked, regular wages are forty times twenty-four, or 960 dollars. Six overtime hours at thirty-six dollars add 216 dollars. Gross wages are 1,176 dollars. This excludes taxes and benefit deductions and assumes no other remuneration changes the regular rate. Bonuses or multiple wage rates can change the regular-rate calculation.

Paid vacation or sick time generally is not hours worked for the ordinary overtime threshold unless a policy or agreement provides otherwise. If an employee worked thirty-eight hours and used eight hours of sick time, the example has forty-six paid hours but thirty-eight worked hours. Distinguish those categories in both payroll and scheduling. BOLI overtime guidance .

Burden and cost allocation

Labor burden includes employer payroll taxes, workers' compensation, benefits, paid nonproductive time, and other lawful employment costs. An illustrative forty-percent burden on a twenty-four-dollar base wage gives 33.60 dollars per hour before allocated business overhead and profit. The forty percent is an estimating assumption, not a state-mandated rate. Use actual insurer classifications, tax rates, benefits, and productive-hour experience.

Record productive hours by cost code: excavation, setting forms, planting, pipe installation, and corrections. If a bid allowed sixteen installation hours and the crew used twenty-four, investigate whether access, unsuitable soil, underestimated handling, or rework caused the difference. Do not simply blame the crew or force the wage record to match the estimate. Separating required paid time from production categories makes both payroll compliance and future bidding more reliable.

Field application

A foreman who spends twenty minutes loading required tools before the recorded start has performed work that the employer must evaluate and record as paid time. If that time repeats five mornings, it adds one hour and forty minutes to the week. It can also change overtime. The job-cost ledger may assign that time to mobilization, but the payroll ledger must preserve the actual compensable hours. Comparing the two records identifies an estimating problem without erasing the employee's work.

Reference table

  • Example wage component Calculation Result
  • Forty regular hours 40 × 24 960 dollars
  • Six overtime hours 6 × 36 216 dollars
  • Gross wages 960 + 216 1,176 dollars