Direct costs and overhead allocation
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Direct costs and overhead allocation
Key Takeaways Explain This Topic AI
Include materials, labor burden, equipment, subcontractors, and job overhead.
Distinguish job-specific costs from company overhead.
Waste and production assumptions should reflect the actual work.
Last updated: October 2026
Note
Core Principle: Profitable landscape contracting hinges on disciplined financial estimation. Direct costs (materials, labor, equipment, and subcontractors) generate no profit on their own; every bid must systematically recover General & Administrative (G&A) overhead and apply a true profit margin. Remember the fundamental rule of construction finance: markup is applied to costs, but margin is earned on the final selling price .
Anatomy of a Landscape Bid: Core Cost Categories
In landscape contracting, construction cost accounting divides project expenses into four primary categories:
Direct Materials and Waste Factors
Direct materials include all physical goods permanently incorporated into the finished project: nursery stock, turf sod/seed, concrete pavers, natural stone, retaining wall units, crushed base rock (e.g., 3/4-inch minus), bedding sand, topsoil, compost, mulch, and irrigation components. Freight and delivery fees assessed by suppliers are also direct material costs.
Estimators must add realistic waste factors to material takeoffs:
5% to 10% for pavers and segmental retaining wall units to cover radius cuts, edge trimming, and handling breakage.
10% to 20% for bulk soils, compost, and aggregate base to account for wheelbarrow loss, subgrade undulations, and mechanical compaction settling.
5% to 8% for sod rolls and irrigation lateral piping.
Direct Labor and Labor Burden
Direct labor represents the field wages paid to installers, machine operators, and site foremen. However, base wages reflect only part of the employer's labor expense. Contractors must add labor burden —the mandatory taxes, statutory contributions, and benefits required by law:
FICA: Social Security (6.2%) and Medicare (1.45%).
Federal & State Unemployment: FUTA (0.6%) and Oregon SUTA (variable employer experience rating).
State Benefit Assessments: Paid Leave Oregon and the Workers' Benefit Fund (WBF).
Oregon Workers' Compensation Insurance: Mandatory for all non-exempt employers under Oregon Landscape Contractors Board (LCB) licensing rules. Landscape construction (NCCI Code 0042) rates typically range from $4.00 to $12.00+ per $100 of gross payroll , depending on claims history and the employer's Experience Modification Rating (EMR).
Voluntary Benefits: Employer-paid health insurance, retirement contributions, and paid time off (PTO).
Aggregated statutory taxes and benefits produce a labor burden rate typically between 30% and 50% over base wages: Burdened Hourly Rate = Base Wage × ( 1 + Labor Burden Rate ) \text{Burdened Hourly Rate} = \text{Base Wage} \times (1 + \text{Labor Burden Rate}) Burdened Hourly Rate = Base Wage × ( 1 + Labor Burden Rate )
Example: An installer with a $24.00/hour base wage and a 40% burden costs the business $33.60 per hour ($24.00 × 1.40).
Equipment and Subcontractor Costs
Dedicated Equipment: Ownership and operating (O&O) expenses (depreciation, financing, preventive maintenance, fuel, and track/tire wear) for owned machines, as well as rental fees for specialized equipment (e.g., mini-excavators or power trenchers) dedicated to the project.
Subcontractors: Specialized licensed trades hired under contract, such as commercial tree fallers, structural engineers, or licensed electricians for high-voltage exterior connections.
Indirect Job Costs (Job Overhead)
Indirect job costs are expenses caused directly by a specific project that cannot be assigned to a specific material or labor assembly. Examples include site-specific grading permits, roll-off dumpster rentals, disposal tipping fees, OSHA-mandated portable toilet rentals, mobilization hauling, and secure on-site storage boxes.
General & Administrative (G&A) Overhead
While indirect job costs end when the project concludes, General & Administrative (G&A) overhead represents the ongoing operating expenses necessary to maintain the enterprise regardless of sales volume:
Shop and equipment yard lease or mortgage payments.
Office salaries (bookkeepers, estimators, office managers, and owners).
Office utilities (power, water, heating, communications, and internet).
Commercial General Liability (CGL) insurance and commercial auto fleet policies.
Professional fees for CPA tax accounting and legal counsel.
Marketing, advertising, estimating software subscriptions, and Oregon LCB license renewal fees.
If G&A overhead is not systematically recovered across billable estimates, it directly erodes business net profit.
Overhead Allocation Methodologies
Contractors allocate annual G&A overhead to project estimates using three primary methods:
Allocation Method Formula Best Application Key Consideration
Percentage of Direct Labor Cost Annual G&A Overhead Annual Direct Labor Cost × 100 % \frac{\text{Annual G\&A Overhead}}{\text{Annual Direct Labor Cost}} \times 100\% Annual Direct Labor Cost Annual G&A Overhead × 100% Labor-intensive maintenance and installation firms Overburdens labor-heavy projects; under-recovers on material-heavy jobs.
Percentage of Total Direct Costs Annual G&A Overhead Annual Total Direct Costs × 100 % \frac{\text{Annual G\&A Overhead}}{\text{Annual Total Direct Costs}} \times 100\% Annual Total Direct Costs Annual G&A Overhead × 100% Operations with consistent material-to-labor ratios Can distort bids with high-cost specimen plants or stone by overpricing materials.
Hourly Overhead Rate (Direct Labor Hour) Annual G&A Overhead Annual Billable Field Hours \frac{\text{Annual G\&A Overhead}}{\text{Annual Billable Field Hours}} Annual Billable Field Hours Annual G&A Overhead Hardscape, design-build, and multi-trade contractors Spreads overhead equitably based on time spent on site; widely considered the most accurate.