Study guide
Margin, markup, changes, and job costing
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Margin, markup, changes, and job costing
Key Takeaways Explain This Topic AI
Margin uses selling price; markup uses cost.
Price for a target margin equals cost divided by one minus margin.
Record mutually approved changes and compare actual costs with the estimate.
Last updated: October 2026
Hourly Overhead Rate Calculation Example
A contractor projects $180,000 in annual G&A overhead and 9,000 billable field hours across its workforce: Hourly Overhead Rate = $ 180 , 000 9 , 000 hours = $ 20.00 per direct labor hour \text{Hourly Overhead Rate} = \frac{\$180,000}{9,000 \text{ hours}} = \$20.00 \text{ per direct labor hour} Hourly Overhead Rate = 9 , 000 hours $180 , 000 = $20.00 per direct labor hour
If a project requires 120 direct labor hours , the allocated company overhead is $2,400 (120 direct labor hours × $20.00).
Markup vs. Margin: The Critical Distinction
A common cause of contractor insolvency is treating markup and margin as interchangeable numbers.
Markup is the percentage added to total cost to establish the price: Markup % = Selling Price − Total Cost Total Cost × 100 % \text{Markup \%} = \frac{\text{Selling Price} - \text{Total Cost}}{\text{Total Cost}} \times 100\% Markup % = Total Cost Selling Price − Total Cost × 100%
Profit Margin on the Included Cost Base is the percentage of the selling price that remains as profit: Margin % = Selling Price − Total Cost Selling Price × 100 % \text{Margin \%} = \frac{\text{Selling Price} - \text{Total Cost}}{\text{Selling Price}} \times 100\% Margin % = Selling Price Selling Price − Total Cost × 100%
To price a bid to yield a target profit margin, divide total cost by ( 1 − Margin ) (1 - \text{Margin}) ( 1 − Margin ) : Selling Price = Total Cost 1 − Target Margin Rate \text{Selling Price} = \frac{\text{Total Cost}}{1 - \text{Target Margin Rate}} Selling Price = 1 − Target Margin Rate Total Cost Markup Rate = Margin Rate 1 − Margin Rate , Margin Rate = Markup Rate 1 + Markup Rate \text{Markup Rate} = \frac{\text{Margin Rate}}{1 - \text{Margin Rate}}, \quad \text{Margin Rate} = \frac{\text{Markup Rate}}{1 + \text{Markup Rate}} Markup Rate = 1 − Margin Rate Margin Rate , Margin Rate = 1 + Markup Rate Markup Rate
Markup vs. Margin Conversion Reference Table
- Target Margin (%) Required Markup on Cost (%) Cost Multiplier
- 10.0% 11.11% 1.1111
- 15.0% 17.65% 1.1765
- 20.0% 25.00% 1.2500
- 25.0% 33.33 percentage points 1.3333
- 30.0% 42.86% 1.4286
- 33.3% 50.00% 1.5000
- 40.0% 66.67% 1.6667
- 50.0% 100.00% 2.0000
- Step-by-Step Worked Mathematical Example
A residential hardscape project has the following estimated costs:
- Direct Materials: $8,400
- Burdened Labor (150 hours @ $32/hr): $4,800
- Equipment Rental: $1,600
- Indirect Job Costs (Permit, Disposal): $1,200
- Allocated G&A Overhead (150 hours @ $16/hr): $2,400
- Total Project Cost: $8,400 + $4,800 + $1,600 + $1,200 + $2,400 = $18,400
The contractor establishes a target 20% profit margin .
Flawed Contractor Calculation (Markup Error)
Multiplying cost directly by 1.20: Flawed Price = $ 18 , 400 × 1.20 = $ 22 , 080 \text{Flawed Price} = \$18,400 \times 1.20 = \$22,080 Flawed Price = $18 , 400 × 1.20 = $22 , 080 Actual Margin Earned = $ 22 , 080 − $ 18 , 400 $ 22 , 080 = $ 3 , 680 $ 22 , 080 = 16.67 % \text{Actual Margin Earned} = \frac{\$22,080 - \$18,400}{\$22,080} = \frac{\$3,680}{\$22,080} = 16.67\% Actual Margin Earned = $22 , 080 $22 , 080 − $18 , 400 = $22 , 080 $3 , 680 = 16.67%
Warning
This error creates a 3.33 percentage points margin shortfall , costing the business $920 in profit on the stated cost basis.
Correct Mathematical Calculation
Using the proper margin formula: Correct Selling Price = $ 18 , 400 1 − 0.20 = $ 18 , 400 0.80 = $ 23 , 000 \text{Correct Selling Price} = \frac{\$18,400}{1 - 0.20} = \frac{\$18,400}{0.80} = \$23,000 Correct Selling Price = 1 − 0.20 $18 , 400 = 0.80 $18 , 400 = $23 , 000 Profit = $ 23 , 000 − $ 18 , 400 = $ 4 , 600 \text{Profit} = \$23,000 - \$18,400 = \$4,600 Profit = $23 , 000 − $18 , 400 = $4 , 600 Margin Verification = $ 4 , 600 $ 23 , 000 = 20.0 % \text{Margin Verification} = \frac{\$4,600}{\$23,000} = 20.0\% Margin Verification = $23 , 000 $4 , 600 = 20.0% Equivalent Markup on Cost = $ 4 , 600 $ 18 , 400 = 25.0 % \text{Equivalent Markup on Cost} = \frac{\$4,600}{\$18,400} = 25.0\% Equivalent Markup on Cost = $18 , 400 $4 , 600 = 25.0%
Changes, approvals, and cost records
LCB requires written construction contracts at $2,000 or more, aggregated by job site and owner over twelve months. Changes must be written and agreed to by both parties; signatures on a change order are not required. An accepted email or text can document agreement. Keep the description, quantity, revised price, and schedule impact together, and send the approved scope to the field crew before it performs the change.
Separate a material substitution from additional work. Replacing a unavailable specified shrub with an agreed equivalent can change the purchasing record without increasing plant quantity. Adding a second planting bed changes quantity, labor, disposal, and irrigation demand. Price the actual difference, including credits for removed scope, instead of automatically adding a percentage to the original contract. LCB contract checklist .
Job Costing, WIP Tracking, and Post-Job Audits
Estimating provides a projected budget; job costing tracks actual costs to verify financial performance.
In-Progress Tracking: Field crew hours are recorded daily against specific cost codes (e.g., excavation, base preparation, paver setting, planting). Material invoices are coded directly to the active job ledger.
Work-in-Progress (WIP): Compares actual costs against estimated completion percentages to prevent unbilled work or premature revenue recognition.
Post-Job Audit & Variance Analysis: Compares estimated vs. actual labor hours and material consumption. Labor Variance = Actual Hours − Estimated Hours \text{Labor Variance} = \text{Actual Hours} - \text{Estimated Hours} Labor Variance = Actual Hours − Estimated Hours
If 800 square feet of pavers was estimated at 20 sq ft/hour (40 hours) but required 56 actual hours (14.3 sq ft/hour), the audit flags a 16-hour labor overrun. Contractors use this data to identify causes (e.g., intricate cuts or equipment delays) and calibrate future bidding rates.
Application check
If the desired margin changes after an estimate is accepted, distinguish a new pricing decision from an error in the original cost estimate. Compare actual quantities, production, and overhead recovery first. A lower realized margin can arise from rework or cost growth even when the original selling-price formula was correct. Use the cost records to identify the source before changing every future bid.
The included cost base matters when naming a margin. Job gross profit commonly subtracts job costs before general business overhead, while operating profit also deducts that overhead. The worked bid includes allocated G&A in total cost, so its twenty-percent result is a profit margin on that stated full cost base; it is not a separate claim about financial-statement gross margin. Keep the same basis when comparing estimates with actual results.