Study guide

LCP supervision and clear project communication

Oregon Landscape Contractor License Study Guide 2026

Track your progress as you read

Finished sections get a check mark.

1 1. Licensing and business: 1

Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility

2 2. Licensing and business: 2

Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens

3 3. Licensing and business: 3

LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing

4 4. Site safety and utilities

Excavation safety and hazard controls Oregon 811 notices and utility protection

5 5. Soil science and site preparation: 1

Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity

6 6. Soil science and site preparation: 2

Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds

7 7. Plants, turf, and establishment: 1

Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions

8 8. Plants, turf, and establishment: 2

Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth

9 9. Plants, turf, and establishment: 3

Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations

10 10. Plants, turf, and establishment: 4

Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials

11 11. Paving and concrete: 1

Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout

12 12. Paving and concrete: 2

Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing

13 13. Paving and concrete: 3

Concrete joints and curing

14 14. Walls and exterior structures: 1

Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings

15 15. Walls and exterior structures: 2

Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure

16 16. Walls and exterior structures: 3

Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions

17 17. Walls and exterior structures: 4

Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality

18 18. Design, grading, and drainage: 1

Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures

19 19. Design, grading, and drainage: 2

Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall

20 20. Design, grading, and drainage: 3

Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets

21 21. Design, grading, and drainage: 4

Bioretention sizing, media, and plants Swales and current DEQ erosion controls

22 22. Irrigation design and operation: 1

Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting

23 23. Irrigation design and operation: 2

Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage

24 24. Irrigation design and operation: 3

Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves

25 25. Irrigation design and operation: 4

Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions

26 26. Irrigation design and operation: 5

Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup

27 27. Backflow and potable protection: 1

Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies

28 28. Backflow and potable protection: 2

Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports

LCP supervision and clear project communication

Key Takeaways Explain This Topic AI

Employees need instructions, their supervising LCP's name, and a working contact method.

LCB's supervision rule includes communication within an hour and an unavailable LCP returning the call by the end of the day.

Record decisions and communicate approved changes to the people actually performing the work.

Last updated: October 2026

Supervision must cover the work

An unlicensed construction worker must be employed by the licensed landscape contracting business and directly supervised by an LCP licensed for the phase being performed. The LRB guide defines direct supervision through project instruction, knowledge of the LCP by name, knowledge of how to contact that person, and ability to communicate within an hour; if unavailable, the LCP must return the employee's call by the end of the day. This is an operating obligation, not merely a licensing application entry.

Assign the supervisor before mobilization. Explain the current drawing, materials, grades, limits of work, hazards, and inspection points. Confirm comprehension by having the worker describe the planned task and what conditions require stopping. An instruction such as “finish the wall” leaves unanswered its bottom elevation, drainage detail, reinforcement, and whether an inspection is required before backfilling.

The supervising phase must fit the task. A Planting Only LCP cannot independently direct irrigation installation outside that phase. An LCP working beyond the individual's phase requires the applicable direct supervision. A company with multiple crews needs a contact and coverage arrangement that actually works for all of them. Test the communication method at a remote or low-signal site rather than discover its failure after the crew encounters a buried facility.

Instructions and stop points

Use a short pre-task briefing to identify the task, accepted detail, tools, hazards, quality checks, and stop points. For a paver project, stop points might include subgrade acceptance, drainage-slope confirmation, base density where specified, and restraint installation. For irrigation, include utility clearance, pipe material, joint cure, flushing, water testing, and controller commissioning. The exact checks change by task; repeating the same generic checklist for every job does not establish competent supervision.

Workers should stop when field conditions contradict the design. Examples include water entering a wall excavation, a plant root flare hidden far below nursery soil, a missing locate mark near a gas meter, or a foundation discovered under a proposed trench. Communicate the evidence and the location. The LCP should determine whether to inspect, obtain a design revision, contact the authority, or change sequencing before the crew improvises a hidden defect.

Use photographs with scale, marked plan locations, and measured elevations rather than descriptions such as “the hole looks wet.” Record who made a decision and which revision authorizes it. An instruction sent privately to one foreman can fail if another crew works from an old plan the next morning. Distribute the accepted revision, remove obsolete copies from active use, and verify that quantities and cost assumptions were updated.

Customer communication and changes

Explain scope, schedule, access, noise, watering responsibility, and site protection before work. Translate technical consequences into practical choices. If a patio cannot drain toward the planned outlet, show the elevations and explain the needed correction rather than merely call the original design “wrong.” Distinguish an observed fact from a proposed solution and identify any price or schedule effect.

LCB requires written, mutually agreed changes; the customer and business do not need signatures on every change order when another written agreement documents acceptance. Preserve the accepted text or email, revised material specification, and affected drawing. A conversation with a tenant or neighbor is not necessarily authorization from the contracting owner. Confirm who has authority to approve scope and price.

Listening is part of estimating and dispute prevention. Repeat the customer's requested outcome in concrete terms, such as a dry walking surface after ordinary rain or a low-maintenance planting with specified summer irrigation. Avoid promising “maintenance free” or guaranteed drainage under every storm. State the design assumptions and what happens when they are exceeded, including overflow routes and maintenance needs.

Closeout and future responsibility

At completion, walk the work with the customer, record unfinished items, provide instructions, and explain guarantees. Show isolation valves, controller programs, drain cleanouts, and any components requiring periodic testing. Have the customer demonstrate essential operations where possible. A printed manual left in a wet valve box is unlikely to support successful maintenance.

Document final settings and photographs before the owner changes them. Record planting quantities and substitutions, actual pipe or wire locations, and the contact for a problem. A later brown patch can result from a closed supply valve, plugged nozzle, changed program, or installation fault; good closeout evidence speeds diagnosis. LCB's LRB guide describes the supervision and communication expectations that support this workflow.

Field application

For an absent LCP, identify coverage before the crew starts and confirm the substitute holds the required phase. A voicemail box full of old messages is not a working contact system. At a low-signal site, establish an alternate communication method and a stop-work instruction if it fails. The requirement concerns actual instructions and availability; documenting a name alone does not demonstrate the crew can obtain a decision.

Reference table

  • Crew question Required working answer
  • Who supervises? Named LCP with appropriate phase
  • What is authorized? Current instructions and accepted revision
  • How do we obtain a decision? Working contact method and rule-compliant availability
  • What changes are approved? Preserved written mutual agreement