Study guide
Oregon 811 notices and utility protection
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Oregon 811 notices and utility protection
Key Takeaways Explain This Topic AI
Notify at least two full business days before excavation, excluding the notification day.
Ticket validity is 45 calendar days from notification.
The tolerance zone extends 24 inches from each facility's outside edge.
Investigate private lines and report damage, including protective-coating scrapes.
Last updated: October 2026
Note
Statutory Mandate: Striking an underground utility can trigger explosions, electrocution, hazardous chemical releases, and massive financial liability. Under Oregon law ( ORS 757.542 through 757.562 ) and administrative rules ( OAR Chapter 952 ), contacting the Oregon Utility Notification Center (OUNC / 811) is a mandatory legal obligation prior to any excavation. Excavators must pre-mark their site in white and honor the statutory 24-inch tolerance zone.
The Oregon Utility Notification Center (OUNC) Legal Framework
The Oregon Utility Notification Center (OUNC) is a state-chartered entity established by the Oregon Legislature to operate a statewide, one-call notification clearinghouse:
Governing Law: Oregon Revised Statutes ( ORS 757.542–757.562 ) and Oregon Administrative Rules ( OAR Chapter 952 ).
Definition of Excavation (OAR 952-001-0010): Any operation in which earth, rock, or other material on or below the ground is moved, removed, or displaced by any means, including grading, trenching, ditching, augering, drilling, scraping, post-hole digging, driving stakes, and deep planting.
Who Must Notify: Any contractor, landscaper, utility employee, or property owner planning excavation. Landscape contractors—routinely digging for irrigation, patios, wall footings, and specimen trees—are fully subject to OUNC rules.
Enforcement and liability
Oregon's excavation-notification rules can lead to enforcement and damage liability when an excavator fails to notify, preserve markings, or protect a facility. A locate ticket does not insure the contractor against damage. Record the ticket, positive responses, site markings, private-utility review, and changes in the excavation footprint. Use the current Oregon Utility Notification Center rules rather than memorize an unsupported generic fine schedule.
Mandatory Notification Timelines: The Two Full Business Days Rule
Under OAR 952-001-0050, an excavator must notify OUNC (calling 811 or online via digsafelyoregon.com ) not less than 2 full business days and not more than 10 business days prior to beginning excavation.
The Business Day Definition and Day-of-Notice Rule
Business Day: Any day from 12:00 AM to 11:59 PM, excluding Saturdays, Sundays, and legal state and federal holidays.
The Day of Notice Rule: The business day on which notice is transmitted does not count as one of the two full business days!
Counting full business days
The notification day does not count, and weekends and holidays do not count as business days. A notice placed on Wednesday allows Thursday and Friday as two full business days. Excavation can begin after those days have elapsed, including on Saturday if all other requirements are satisfied. Monday is the next ordinary weekday, not the earliest legally possible start. For a Wednesday start with no holidays, a request placed by the preceding Friday supplies Monday and Tuesday as the two full business days.
Notify no more than ten business days before starting. A ticket remains valid for 45 calendar days from notification; confirm renewal and marking requirements before that period expires. A change in location or scope can require another request even before the original ticket expires.
Pre-Marking the Site: The White-Lining Mandate
Under OAR 952-001-0040 , the excavator must pre-mark the proposed excavation boundary before submitting a locate request to OUNC. This practice is known as "white-lining" :
Acceptable Materials: White spray paint (water-based chalk on turf), white pin-flags, white stakes, or white chalk on paved surfaces.
Techniques: Marking continuous white borders, dashed boundary lines, corner "L" brackets, or center lines with arrows indicating trench width.
Purpose: Eliminates ambiguity, confines utility locating effort to the actual work footprint, and avoids unnecessary markings across private lawns.
Exception: Permitted only when the excavation boundary can be unambiguously described in plain text (e.g., "entire rectangular front lawn from sidewalk to foundation"), though white-lining remains the regulatory default.
APWA Uniform Color Code Standard
Utility locators mark buried infrastructure according to the American Public Works Association (APWA) Uniform Color Code , adopted under OAR 952-001-0070:
Color Utility Classification Common Landscape Hazard Notes
RED Electric Power , Cables, Conduit, Street Lighting High voltage; extreme risk of arc flash and electrocution.
YELLOW Natural Gas , Oil, Steam, Petroleum, Gas Lines Pressurized explosive gas; ignition risk from sparks or machinery heat.
ORANGE Communications , Telephone, CATV, Fiber Optics High data volume; severing fiber optics incurs massive repair costs.
BLUE Potable Drinking Water Lines and Mains Pressurized domestic water; flooding risk and property damage.
GREEN Sewers and Drain Lines (Sanitary and Storm) Gravity-flow or pressurized lines; contamination risk.
PURPLE Reclaimed Water , Irrigation Lines, Slurry Lines Non-potable recycled water systems and municipal irrigation mains.
WHITE Proposed Excavation Limits (White-Lining) Marked by the contractor to define project boundaries.
PINK Temporary Survey Markings , Grade Benchmarks Survey pins, property lines, and grade stakes.
Public vs. Private Underground Utilities
Caution
The Private Utility Trap: OUNC member utilities only locate lines they own and maintain—typically up to the service meter or public right-of-way demarcation point . Locators do not mark private lines , such as:
Secondary electrical conduits to detached garages, workshops, pool pumps, or outdoor kitchens.
Private irrigation mainlines, lateral piping, and low-voltage lighting wires.
Private gas lines running to outdoor barbecues, patio heaters, or fire pits.
Private sewer laterals, septic tanks, and drain fields.
Contractors must visually inspect site conditions, review owner records, and hire a private utility locator when excavating near private infrastructure.
The Oregon Tolerance Zone: 24-Inch Hand-Dig Mandate
Under OAR 952-001-0010 and OAR 952-001-0090 , Oregon law establishes an explicit safety buffer surrounding marked underground facilities known as the Tolerance Zone .
Dimensional Definition
The Tolerance Zone is defined as 24 inches (2 feet) horizontally from the outside lateral dimensions of each side of the underground facility , plus the facility's actual width. Total Tolerance Zone Width = 24 in (Left) + Facility Width + 24 in (Right) \text{Total Tolerance Zone Width} = 24\text{ in (Left)} + \text{Facility Width} + 24\text{ in (Right)} Total Tolerance Zone Width = 24 in (Left) + Facility Width + 24 in (Right)
Mechanized Equipment Prohibition
Within the 24-inch tolerance zone, mechanized excavation equipment is strictly prohibited until the facility has been visually exposed by non-destructive means:
Prohibited equipment includes backhoes, mini-excavators, trenchers, track skid steers, and power augers.
Permitted Non-Destructive Methods: Hand digging with non-powered hand tools (round-point shovels or spades used with gentle slicing motions; pickaxes and pry bars are prohibited), vacuum excavation (hydro-excavation or air-knife soft digging), and hand-potholing.
Support and Protection: Once exposed, utilities must be protected from mechanical impact and physically supported (slings or cribbing) to prevent sagging or joint rupture during backfilling.
- Ticket Lifecycles, Renewals, Emergencies, and Damage Procedures
- Locate Ticket Validity and Renewals
Validity Period: Standard OUNC locate tickets are valid for 45 calendar days from the notice date.
Ticket Renewals: If excavation continues beyond 45 days, the contractor must submit a renewal at least 2 full business days before the current ticket expires .
Mark Preservation: Contractors must protect locate marks. If paint or flags are obliterated by rain, grading, or traffic, work must stop in the unverified area and a re-mark request must be submitted (2 business days).
Emergencies and damaged facilities
Emergency procedures exist for conditions meeting the rule's emergency definition; a delayed schedule is not an emergency. Notify 811 and affected operators and take reasonable protective measures. Do not assume every utility will arrive within a guaranteed two-hour period. If marks are missing or inconsistent with visible evidence, stop and resolve the discrepancy before digging.
Response to a strike or suspected leak
Stop work and keep people away. For a suspected gas leak, move to a safe location, avoid operating switches or creating ignition sources near the leak, and call 911 and the utility from a safe location. Do not manipulate damaged equipment or try to repair a line. An electrical strike requires avoiding contact with energized equipment and following emergency instructions. Report even a scrape or damaged protective coating to the operator; burying it can leave a future corrosion or insulation failure. Preserve the scene and records after the immediate hazard has been controlled. Oregon 811 guidance .