Study guide

Seed, sod, and establishment calculations

Oregon Landscape Contractor License Study Guide 2026

Track your progress as you read

Finished sections get a check mark.

1 1. Licensing and business: 1

Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility

2 2. Licensing and business: 2

Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens

3 3. Licensing and business: 3

LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing

4 4. Site safety and utilities

Excavation safety and hazard controls Oregon 811 notices and utility protection

5 5. Soil science and site preparation: 1

Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity

6 6. Soil science and site preparation: 2

Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds

7 7. Plants, turf, and establishment: 1

Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions

8 8. Plants, turf, and establishment: 2

Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth

9 9. Plants, turf, and establishment: 3

Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations

10 10. Plants, turf, and establishment: 4

Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials

11 11. Paving and concrete: 1

Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout

12 12. Paving and concrete: 2

Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing

13 13. Paving and concrete: 3

Concrete joints and curing

14 14. Walls and exterior structures: 1

Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings

15 15. Walls and exterior structures: 2

Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure

16 16. Walls and exterior structures: 3

Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions

17 17. Walls and exterior structures: 4

Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality

18 18. Design, grading, and drainage: 1

Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures

19 19. Design, grading, and drainage: 2

Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall

20 20. Design, grading, and drainage: 3

Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets

21 21. Design, grading, and drainage: 4

Bioretention sizing, media, and plants Swales and current DEQ erosion controls

22 22. Irrigation design and operation: 1

Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting

23 23. Irrigation design and operation: 2

Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage

24 24. Irrigation design and operation: 3

Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves

25 25. Irrigation design and operation: 4

Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions

26 26. Irrigation design and operation: 5

Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup

27 27. Backflow and potable protection: 1

Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies

28 28. Backflow and potable protection: 2

Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports

Seed, sod, and establishment calculations

Key Takeaways Explain This Topic AI

Pure live seed fraction equals purity times germination as decimals.

Divide required live seed by that fraction to find bulk seed.

Lay sod along contours on slopes and inspect soil beneath it.

Establishment watering follows moisture and weather rather than fixed timer minutes.

Last updated: October 2026

Step-by-Step Seedbed Preparation

Grading and root medium: Relieve compaction where appropriate without damaging utilities or retained roots. Use the specified root-zone depth and grades; drainage near a foundation and a general turf surface have different criteria. Remove debris and avoid abrupt compacted interfaces.

Soil testing: Sample representative areas and apply lime only when supported by pH, buffering, and turf needs. Western Oregon location alone does not justify a fixed fifty-to-one-hundred-pound application. Moss can reflect moisture, shade, and weak turf rather than prove acidity.

Fertility: Use soil results and establishment needs to select nutrients. High-phosphorus starter fertilizer is not universally necessary, and sod can already be fertilized by its producer. Distinguish pounds of nutrient from pounds of product.

Fine grading: Produce an even, firm, friable seedbed with the specified drainage. Light rolling can improve contact; avoid compacting wet soil. Inspect for local hollows rather than assume one roller-fill fraction fits every machine. OSU lawn establishment guidance .

Seeding Dynamics, Timing, and Pure Live Seed (PLS) Mathematics

Commercially packaged turfgrass seed contains varying proportions of pure seed, inert matter (chaff, stems), weed seed, other crop seed, and non-viable seed. Evaluating seed quality and calculating application rates requires using the Pure Live Seed (PLS) metric.

The Pure Live Seed Formula PLS % = Purity % × Germination % 100 \text{PLS \%} = \frac{\text{Purity \%} \times \text{Germination \%}}{100} PLS % = 100 Purity % × Germination % ​

To determine the actual weight of bulk seed required to satisfy a specified PLS seeding rate: Bulk Seed Required (lbs/1,000 sq ft) = Target PLS Rate PLS % / 100 \text{Bulk Seed Required (lbs/1,000 sq ft)} = \frac{\text{Target PLS Rate}}{\text{PLS \%} / 100} Bulk Seed Required (lbs/1,000 sq ft) = PLS % /100 Target PLS Rate ​

Worked PLS Mathematical Example

Project Scope: A 10,000-square-foot lawn specification calls for 5.0 lbs PLS per 1,000 square feet .

Seed Tag Analysis: Purity = 90.0%; Germination = 80.0%.

Calculate PLS Percentage: PLS % = 90.0 × 80.0 100 = 72.0 % ( 0.72 ) \text{PLS \%} = \frac{90.0 \times 80.0}{100} = 72.0\% \quad (0.72) PLS % = 100 90.0 × 80.0 ​ = 72.0% ( 0.72 )

Calculate Bulk Application Rate per 1,000 sq ft: Bulk Rate = 5.0 lbs 0.72 = 6.944 lbs per 1,000 sq ft \text{Bulk Rate} = \frac{5.0 \text{ lbs}}{0.72} = 6.944 \text{ lbs per 1,000 sq ft} Bulk Rate = 0.72 5.0 lbs ​ = 6.944 lbs per 1,000 sq ft

Calculate Total Bulk Seed for 10,000 sq ft: Total Bulk Seed = 6.944 lbs × 10 = 69.44 lbs (approx. 70 lbs) \text{Total Bulk Seed} = 6.944 \text{ lbs} \times 10 = 69.44 \text{ lbs (approx. 70 lbs)} Total Bulk Seed = 6.944 lbs × 10 = 69.44 lbs (approx. 70 lbs)

Warning

Applying 50 lbs of bulk seed based solely on raw bag weight would provide only 3.6 lbs PLS/1,000 sq ft, under-seeding the lawn by 28% and resulting in a thin turf canopy susceptible to weed invasion.

Seeding Technique and Seasonal Windows

Application Method: Calibrate drop or rotary broadcast spreaders. Divide seed into two equal halves. Apply the first half in parallel strips, and apply the second half at a right angle (90 degrees perpendicular) to the first pass. This eliminates striping and bare skips.

Covering Seed: Lightly rake to cover seed to a depth of 1/8 to 1/4 inch . Never bury seed deeper than 1/4 inch, as small turf seeds lack the carbohydrate reserves to emerge from deep burial. Roll lightly to guarantee seed-to-soil contact. Mulch with weed-free straw, hydromulch, or thin peat moss.

The Optimal Seeding Window (Late Summer / Early Fall): In Western Oregon, mid-August to late September is the premier seeding window. Soil temperatures are warm (65°F to 75°F), accelerating germination; autumn rains commence; and summer annual weed competition (crabgrass) ceases. Spring seeding (April–May) encounters cold, saturated soils, slow germination, intense broadleaf weed competition, and oncoming summer drought.

Sod Installation Standards and Post-Care Establishment

Sod provides an immediate, mature lawn surface and instant erosion control, but requires meticulous handling and installation:

Professional Sod Installation Protocols

Soil Preparation: Prepare the grade and rooting environment for sod; soil-test needs and the sod producer's fertilizer history determine whether lime or preplant nutrients are appropriate. Lightly moisten the soil bed before laying sod; never lay sod on hot, dry soil.

Installation Pattern: Lay the first strip along a straight reference edge (walkway, driveway, or stringline). Stagger end joints in a brick-bond (running bond) pattern. Butt all edges and ends tightly together; never overlap edges or leave gaps between pads. Do not stretch sod rolls, as stretched sod shrinks upon drying, leaving exposed seam gaps.

Slope Anchoring: Lay sod across the slope, along the contours rather than straight uphill and downhill. Where the specified slope or conditions require anchoring, secure the pieces with the appropriate stakes or staples. Review erosion and maintenance safety; sod is not a substitute for stabilizing an unsafe slope.

Rolling: If appropriate for the soil and sod, roll lightly to improve contact without crushing wet soil. Use a suitable roller load, inspect seams and edges, and water promptly to wet both the sod and underlying root medium.

Establishment watering and mowing

Seed needs consistent moisture near the surface until germination and early rooting; sod needs water that penetrates the sod and prepared soil beneath it. Inspect both layers rather than assume a damp blade means the roots received water. Use short, appropriately timed applications when needed to avoid puddling or washing seed downslope. Frequency depends on weather, soil, sprinkler rate, and rooting stage; “three fifteen-minute cycles” is not a universal schedule.

Reduce frequency and water deeper as roots establish. Tug gently at sod to assess rooting, inspect soil moisture, and avoid traffic on saturated soil. Begin mowing when the turf is rooted and tall enough for the selected species' height; remove no more than about one-third of the leaf blade in a mowing. Use sharp blades and avoid heavy equipment on soft ground. Inspect seams, edges, shaded areas, and upper slopes separately because they may dry differently.