Study guide
Pruning and integrated pest management
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Pruning and integrated pest management
Key Takeaways Explain This Topic AI
Prune at appropriate branch unions without damaging the collar.
Use a staged cut for heavy limbs to avoid bark tearing.
IPM uses identification, monitoring, thresholds, and appropriate combined controls.
Last updated: October 2026
Note
Pruning follows a defined objective and the tree's condition. Use appropriate ANSI A300 specifications, safe work methods, and an IPM process that combines identification, monitoring, thresholds, prevention, treatment, and evaluation. Pesticide work must satisfy ODA requirements and the label.
ANSI A300 Pruning Standards and Shigo's CODIT Model
The American National Standards Institute ( ANSI A300 ) establishes standard practices for woody plant maintenance. Modern pruning is grounded in Dr. Alex Shigo's Compartmentalization of Decay in Trees (CODIT) model, which demonstrates that trees do not 'heal' damaged tissue; instead, they chemically and physically wall off (compartmentalize) injured wood.
Primary Pruning Methods
Crown Cleaning: Selective removal of dead, dying, diseased, crowded, weakly attached, and low-vigor branches from the canopy.
Crown Thinning: Selective removal of live branches to reduce canopy density, increase light penetration, and reduce wind resistance during severe winter storms. Set pruning dose from species, age, condition, and objective. Twenty-five percent is a common upper guideline, not a target or a universal safe allowance; mature or stressed trees can tolerate much less.
Crown Raising: Removing selected lower branches to provide the clearance required for the actual sidewalk, road, or structure. Check local clearance criteria and preserve enough live crown; a generic height range is not the legal requirement everywhere.
Crown Reduction: Decreasing canopy height or spread by cutting leaders back to lateral branches that are at least one-third the diameter of the parent stem being removed.
The Three-Cut Method for Heavy Limbs (>1.5 to 2 Inches Diameter)
When removing large branches, attempting a single cut from above causes the weight of the falling branch to peel bark down the trunk, creating massive structural wounds. Contractors must utilize the three-cut method:
Cut 1 (The Undercut): Make a cut on the underside of the limb, 6 to 12 inches outward from the branch collar , cutting approximately one-third of the way through the branch. This undercut acts as a clean break-point that stops tearing bark.
Cut 2 (The Top Relief Cut): Make a cut on the top of the limb, 1 to 2 inches farther out from the undercut. Cut all the way through from above. As the branch severs, it snaps cleanly between the two cuts without stripping trunk bark.
Cut 3 (The Final Collar Cut): Make the final cut cleanly just outside the branch bark ridge and the branch collar . The cut angles downward and outward along the collar line.
Caution
Prohibited Pruning Practices:
Flush Cuts: Cutting flush against the parent trunk removes the branch collar. The branch collar contains specialized overlapping xylem and defensive chemical barriers. Removing it creates large trunk wounds, inviting deep internal heartwood rot.
Stub Cuts: Leaving a long protruding branch stub prevents woundwood (callus tissue) from rolling over the cut, leaving decaying wood that serves as an entry conduit for fungal pathogens.
Tree Topping: Indiscriminate reduction to stubs can remove excessive leaf area, create large wounds, and stimulate weakly attached shoots. Properly specified heading cuts for a particular plant objective are not synonymous with tree topping. Topping is an inappropriate routine pruning method; do not confuse it with a properly specified reduction cut or a distinct specialty practice.
Pruning Timing and Physiological Responses
Pruning timing alters carbohydrate reserves, flowering displays, and vegetative vigor:
Dormant Season (Late Winter: January through February): The premier window for structural pruning of most deciduous shade and fruit trees in Western Oregon. Leaves are gone, revealing branching architecture; branch structure is easier to inspect. Disease risk, species, weather, and the pruning objective can change timing; pathogens are not universally inactive during those months.
Summer Pruning (July through August): Used to reduce excessive vegetative vigor, suppress water sprouts, and remove suckers. Pruning during active summer growth removes foliage that would otherwise synthesize carbohydrates for winter storage.
Pruning Flowering Shrubs:
Spring-Flowering Shrubs ( Rhododendron , Azalea , Lilac , Forsythia , Camellia ): Form flower buds during the prior summer and autumn on 'old wood.' Prune immediately after blooming in the spring. Pruning in winter or early spring removes the developing flower buds.
Summer- and Fall-Flowering Shrubs (summer-flowering Spiraea , Potentilla , Hydrangea paniculata , and Abelia ): Form flower buds on 'new wood' generated during the current spring flush. Prune in late winter or early spring during dormancy.
The 5-Step Integrated Pest Management (IPM) Framework
Integrated Pest Management (IPM) is an ecosystem-based strategy that focuses on long-term pest and disease suppression through coordinated physical, cultural, biological, and chemical tactics:
Detailed Breakdown of the IPM Steps
Step 1: Regular Inspection and Monitoring (Scouting): Systematically inspect landscape plantings. Record pest life stages, population densities, natural predator presence, and weather trends. Utilize yellow sticky cards, pheromone traps, and degree-day tracking models.
Step 2: Accurate Pest & Disease Identification: Distinguish between abiotic disorders (e.g., drought, mechanical injury, iron chlorosis from high pH, or salt burn) and biotic pathogens (fungi, bacteria, viruses, insects). Understand the pest's life cycle to target its most vulnerable stage.
Step 3: Setting Action Thresholds: Establish Aesthetic Injury Levels (AIL) and Economic Injury Levels (EIL) . The mere presence of a pest does not warrant chemical treatment; landscapes naturally support pest populations without sustaining unacceptable aesthetic or structural damage.
Step 4: Multi-Tactic Prevention and Control Hierarchy:
Cultural Controls: Select disease-resistant cultivars; adjust planting depth; irrigate via drip to prevent wet foliage; maintain proper soil pH; prune for canopy airflow.
Physical / Mechanical Controls: Hand-remove caterpillars; prune out blighted shoots; use appropriately installed physical barriers where suitable; dislodge aphids with a controlled water stream without damaging plants.
Biological Controls: Conserve and release beneficial predatory insects (lady beetles, lacewings, predatory mites, parasitic wasps) and microbial agents ( Bacillus thuringiensis / Bt).
Chemical Controls: When warranted by identification, thresholds, timing, and risk, select an effective labeled treatment and minimize exposure to people, plants, and beneficial organisms. IPM does not require every possible nonchemical method to fail first. Soaps and oils also have label restrictions and phytotoxicity risks.
Step 5: Post-Treatment Evaluation: Assess whether pest populations dropped below action thresholds, verify non-target beneficial insect survival, and check for phytotoxicity.
Use a written objective and consider tree age, condition, species, and site before assigning pruning dose or timing. ISA pruning guidance connects these choices with tree biology.