1 1. Licensing and business: 1

Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility

2 2. Licensing and business: 2

Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens

3 3. Licensing and business: 3

LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing

4 4. Site safety and utilities

Excavation safety and hazard controls Oregon 811 notices and utility protection

5 5. Soil science and site preparation: 1

Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity

6 6. Soil science and site preparation: 2

Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds

7 7. Plants, turf, and establishment: 1

Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions

8 8. Plants, turf, and establishment: 2

Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth

9 9. Plants, turf, and establishment: 3

Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations

10 10. Plants, turf, and establishment: 4

Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials

11 11. Paving and concrete: 1

Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout

12 12. Paving and concrete: 2

Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing

13 13. Paving and concrete: 3

Concrete joints and curing

14 14. Walls and exterior structures: 1

Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings

15 15. Walls and exterior structures: 2

Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure

16 16. Walls and exterior structures: 3

Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions

17 17. Walls and exterior structures: 4

Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality

18 18. Design, grading, and drainage: 1

Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures

19 19. Design, grading, and drainage: 2

Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall

20 20. Design, grading, and drainage: 3

Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets

21 21. Design, grading, and drainage: 4

Bioretention sizing, media, and plants Swales and current DEQ erosion controls

22 22. Irrigation design and operation: 1

Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting

23 23. Irrigation design and operation: 2

Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage

24 24. Irrigation design and operation: 3

Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves

25 25. Irrigation design and operation: 4

Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions

26 26. Irrigation design and operation: 5

Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup

27 27. Backflow and potable protection: 1

Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies

28 28. Backflow and potable protection: 2

Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports

Bedding, restraints, and square layout

Key Takeaways Explain This Topic AI

Bedding sand is a setting layer, not a repair for low base areas.

Use the specified restraint and its fasteners.

A 3-4-5 triangle provides a square layout check.

Last updated: October 2026

Note

For conventional sand-set concrete pavers, use specified durable bedding sand, a consistent setting layer, adequate edge restraint, suitable pattern, and complete joint fill. CMHA recommends concrete-sand grading with additional fines limits. Permeable, mortar-set, and other systems have different details.

Bedding Sand: ASTM C33 Specifications vs. Stone Dust Prohibition

The bedding sand layer serves two critical engineering functions in a flexible pavement system: it provides a smooth, uncompacted setting bed that absorbs minor dimensional height variations inherent in manufactured concrete pavers, and it forces angular sand upward into the bottom an allowance established by a mock-up of the paver joints during initial vibratory compaction, initiating bottom-up joint interlock.

Strict Material Specification: ASTM C33 Concrete Sand

Under CMHA technical specifications, bedding sand must conform strictly to ASTM C33 (or CSA A23.1) for concrete fine aggregate. Bedding sand must consist of clean, hard, naturally occurring silica sand or manufactured crushed stone sand characterized by sharp, angular particle geometry. It must be thoroughly washed to eliminate clay and organic loam, with less than 1% passing the No. 200 (0.075 mm) sieve .

The Prohibition of Stone Dust and Screenings

A critical failure mode in residential landscape contracting is the substitution of stone dust, quarry screenings, decomposed granite, or masonry sand for washed concrete sand.

Warning

CMHA does not recommend stone dust or limestone screenings for conventional bedding sand because grading, fines, and durability can impair performance. Use the specified durable sand and check contamination. This recommendation does not establish that every quarry material contains the same percentage of fines or fails by the same mechanism.

Bedding thickness and screeding

For conventional sand-set concrete pavers, CMHA guidance commonly uses one inch of loose screeded bedding sand. It consolidates during seating; do not specify a universal half-inch reduction. A mock-up can establish the actual finished-height allowance for the paver, sand, and compactor combination. Bedding is a setting layer, not a tool for correcting low spots in the aggregate base.

Set screed rails to the designed plane, remove them, fill the rail grooves, and avoid walking on the finished bed. Keep bedding material consistent and protected from contamination and excessive moisture. Correct the foundation first when a stringline reveals a depression.

Edge Restraint Systems and Mechanical Fastening

Interlocking concrete pavements operate under the law of horizontal containment. When a dynamic wheel load applies braking or turning forces to a paver, that force is transferred horizontally through the joint sand to adjacent pavers until it reaches the pavement perimeter. If the perimeter is unrestrained, edge pavers shift laterally outward, widening joint gaps. Once joints open beyond 3/16 inch (5 mm) , joint sand falls out, vertical shear transfer ceases, and the entire pavement unravels.

Types of Commercial and Masonry Edge Restraints

Engineered Plastic / Aluminum Commercial Edging: L-shaped commercial edging manufactured from heavy-gauge polyvinyl chloride (PVC) or structural aluminum alloy. Features an upright vertical support wall that rests against the paver face and a horizontal bottom flange with pre-drilled spike bosses that sits directly on the compacted aggregate base extension.

Poured Concrete Bond Beam (Troweled Concrete Toe): Cast-in-place concrete curb troweled against the outer edge pavers. Mixed with fiber reinforcement, the concrete is placed along the perimeter at a 45-degree angle starting 1/2 inch below the paver top chamfer down to the aggregate base shoulder. It must be buried beneath adjacent sod or mulch.

Monolithic Concrete Curb / Submerged Curb: Precast or cast-in-place concrete curbs set on a compacted base footing flush with or slightly above the paver surface, providing superior lateral resistance for commercial vehicular roadways.

Restraint attachment

Install the restraint on a stable supporting foundation at the specified elevation. Plastic, metal, concrete, and proprietary restraints have different fasteners and attachment rules. Follow the system's fastener type, spacing, and base requirements; do not declare all plastic spikes unacceptable or one spike spacing valid for every restraint.

Check curved edges, corners, and vehicular turning areas because spreading forces can be greater there. A restraint unsupported by the base or installed only in bedding sand can move with the pavement. Permeable-pavement foundations may need a different anchorage detail from dense-graded foundations.

Paver Layout, Geometry, and Precision Cutting Protocols

Establishing perfect baseline geometry ensures paver joints remain straight and square across large fields, eliminating unsightly tapering or wedge-shaped cut pieces at borders.

Establishing Square: The 3-4-5 Baseline Method

Never assume building foundations, garage walls, or property line fences are square. Contractors must establish a true perpendicular 90-degree reference line using the 3-4-5 Pythagorean theorem :

Establish a primary baseline along the longest straight edge of the project (e.g., parallel to the house wall).

Measure exactly 3 feet (or 6, 9, or 12 feet for larger projects) along the baseline from a corner point.

Measure exactly 4 feet (or 8, 12, or 16 feet) perpendicular from the same corner point.

Adjust the perpendicular line until the diagonal distance between the two points measures exactly 5 feet (or 10, 15, or 20 feet).

Erect high-tension braided nylon string lines along both perpendicular axes, elevated 1/4 inch above the target finished paver surface.