Study guide
Separation fabric, aggregate, and compaction
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Separation fabric, aggregate, and compaction
Key Takeaways Explain This Topic AI
Separation and reinforcement perform different functions.
Dense-graded aggregate contains controlled fines; clean drainage aggregate differs.
Compact controlled lifts using the specified density-test basis.
A penetration test does not directly measure dry density.
Last updated: October 2026
Geotextile Fabrics: Woven vs. Non-Woven Separation Layers
Geosynthetic fabrics play a vital separation and stabilization role in flexible pavement engineering. When aggregate base is placed directly over damp, cohesive subgrade soil without a geotextile barrier, repeated dynamic wheel and pedestrian traffic causes base rock aggregate to punch downward into the soft subgrade. Simultaneously, liquefied subgrade clay and silt pump upward into the aggregate voids. Within a few seasons, the base rock loses its interlocking friction angle, causing uneven settlement and wheel rutting.
Woven vs. Non-Woven Geotextile Comparison
Engineering Property Woven Geotextile (Stabilization) Non-Woven Geotextile (Drainage / Filtration)
Manufacturing Method Slit-film or monofilament polypropylene tapes woven into flat, high-tensile fabric Extruded polypropylene continuous filaments bonded via mechanical needle-punching
Primary Function Subgrade stabilization, aggregate confinement, high tensile load distribution Water permeability, soil filtration, particle separation in drainage paths
Tensile Modulus & Strength Exceptionally high tensile strength with low elongation under load Moderate tensile strength with high elongation (stretches under point stress)
Water Permittivity / Flow Lower flow rate (adequate for shedding water across sloping subgrades) High flow rate (rapid water passage without particle wash-out)
Ideal Landscape Applications Interlocking paver bases, vehicular driveways, weak clay subgrades, retaining wall base pads Perforated drain pipes (French drains), retaining wall backfill drainage, permeable paver (PICP) beds
Separation installation
Place the specified separator at its designed interface, commonly between native subgrade and aggregate base where separation is needed. Do not place it between bedding sand and base unless the approved design specifically calls for that arrangement. Clear harmful protrusions, lay it without damage, and follow the manufacturer's overlap and repair details.
Avoid equipment travel directly on unsupported fabric. Cover with the specified material and lift before compacting. Woven and nonwoven labels alone do not establish suitability: permeability, opening size, strength, and intended function matter. Use product-specific seam or overlap methods instead of assuming all seams should be heat-welded.
Aggregate Base Selection and Compaction Protocols
In flexible interlocking pavement construction, the aggregate base is the primary structural load-bearing member. It must possess high internal friction, resistance to moisture degradation, and zero internal settlement once compacted.
Base aggregate selection
Dense-graded crushed aggregate contains a range of sizes, including controlled fines, so particles interlock when compacted. Open-graded material intentionally has connected voids and uses a different foundation design, particularly for permeable pavement. A “three-inch minus” product contains fines and should not be described as clean open-graded drainage ballast.
Use the gradation, durability, and cleanliness specified for the pavement. A highway aggregate designation applies when adopted by the project; it is not automatically mandated for every private landscape path. Avoid rounded pea gravel as a substitute for a specified compacted dense-graded base. Drainage rock and load-supporting base are selected for different functions.
Lift Thickness Constraints
Warning
Match lift thickness to the specified aggregate, compactor, moisture, and density requirement. Several thinner lifts may be needed with a small plate compactor, while suitable larger equipment can handle different depths. Verify compaction through the lift, not only a hard-looking surface. A loose lower layer can settle under traffic even when the top looks firm.
Optimal Moisture Content (OMC) and Compaction Protocols
Compaction cannot be achieved if aggregate base material is either bone dry or water-saturated:
Optimal Moisture Content (OMC): Dense-graded aggregate must be conditioned with water to within +/- 1.5% of OMC (typically 5% to 8% moisture content by weight for crushed basalt). At OMC, thin water films lubricate the angular rock particles, allowing them to slide past one another and pack tightly into the densest possible configuration under vibratory action.
Dry Base Hazard: Dry rock creates high friction that resists compaction; once rains arrive, water enters the voids and causes delayed post-installation settlement.
Saturated Base Hazard: If aggregate is over-watered into a slurry, hydraulic pore water pressure prevents particles from interlocking, causing the base to roll, pump, and displace laterally under the compactor.
The Field Squeeze Test: Squeeze a handful of aggregate firmly. If it forms a tight, cohesive ball that holds its shape without crumbling and leaves the palm slightly damp without dripping water, the material is near OMC.
Compaction and verification
Use equipment compatible with the material and lift thickness. Compact each lift at suitable moisture rather than spread the full depth and compact only its surface. Follow the design's density requirement and test method; percent Standard Proctor and percent Modified Proctor are not interchangeable because the laboratory compactive efforts differ.
A density test compares field dry density with the appropriate laboratory maximum. A dynamic cone penetrometer measures penetration resistance; it does not directly measure dry density. Deflection, level checks, density results where required, and records of material and lifts support acceptance. Continue checking the designed drainage slope as the foundation rises.