Study guide
Concrete joints and curing
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Concrete joints and curing
Key Takeaways Explain This Topic AI
Joint spacing ratios require matching units.
A conventional quarter-depth cut in a four-inch slab is one inch.
Cut before random cracks while using the specified saw procedure.
Curing preserves moisture and temperature for hydration.
Last updated: October 2026
Contraction and Isolation Joints: Engineering Spacing and Cut Depth
Portland cement concrete shrinks by an amount dependent on mixture, moisture, restraint, and curing as moisture evaporates and hydration reactions progress. Uncontrolled shrinkage produces random, jagged tensile cracks across the slab. Proper jointing does not prevent cracking; rather, it introduces intentional lines of weakness that dictate precisely where cracks occur.
Contraction joints
Contraction joints create planned weak planes to encourage shrinkage cracks at selected locations. Common guidance uses spacing about twenty-four to thirty times slab thickness, with matching units. A four-inch slab gives 96–120 inches, or eight to ten feet. The formula is not twenty-four feet for each inch of thickness and does not establish a mandatory minimum spacing.
Keep panels near square, address reentrant corners, and follow the design's aspect ratio and maximum spacing. Conventional saw cuts commonly reach at least one-quarter thickness, while approved early-entry systems can have their own detail. A four-inch slab's quarter-thickness is one inch.
Cut before uncontrolled cracking but after the system permits cutting without unacceptable raveling. Timing depends on temperature, mixture, setting, and saw method. Early-entry cutting can occur sooner than conventional sawing; a universal four-to-twelve-hour delay is not valid. Check conditions and the specified procedure rather than wait automatically until the next day.
Isolation (Expansion) Joints
Isolation joints isolate the concrete slab from adjacent rigid, immovable structures such as house foundations, basement retaining walls, existing concrete driveways, structural footings, and utility vaults.
Material: The specified full-depth compressible strip, commonly fiberboard or suitable foam. One-half inch is a common example; actual width and sealant detail come from the design.
Installation: Must extend the entire vertical depth of the concrete slab (from top surface down to the aggregate base). Never allow concrete paste to bridge over or beneath an isolation strip. Isolation joints permit independent vertical and horizontal expansion without inducing crushing or buckling stresses.
Worked joint geometry
For a specified four-inch slab with a joint plan using thirty times thickness, spacing is 120 inches, or ten feet. A fourteen-by-ten-foot panel has aspect ratio 1.4; whether acceptable follows the project's joint design. A long narrow sixteen-by-four-foot panel has ratio four and presents a different cracking risk.
Thickness and joint geometry do not prescribe strength, slump, air content, or reinforcement. Those inputs are selected for the actual exposure and load. A vehicle pavement cannot be approved merely because its joint spacing calculation is correct. Verify all details and coordinate joints with adjacent paving and structures.
If forms actually create a three-and-one-half-inch thickness, a quarter-depth conventional cut is seven-eighths inch. Do not calculate from the nominal two-by-four form size as though it were four inches deep. Check actual slab thickness at the cut location and use the approved saw system.
Concrete Curing Protocols and Strength Development
Curing is the active preservation of satisfactory moisture content and temperature within freshly placed concrete during its early stages to facilitate the ongoing chemical reaction between Portland cement and water, termed hydration .
Moisture, temperature, and curing period
Concrete hardens through hydration rather than simply drying. Premature moisture loss and unsuitable temperature reduce development and can damage the surface. Curing must begin at the appropriate finishing stage and preserve moisture and temperature for the specified period.
Seven days of moist curing is a common conventional specification, but mixture and project requirements can differ. Twenty-eight days is a common strength-test age, not the instant every mix reaches its final ultimate strength. Do not promise a universal seventy-percent strength at seven days or fifty-percent loss from any single drying event.
Protect fresh work from rain damage, evaporation, freezing, traffic, and rapid temperature changes as required. A curing compound must suit later coatings or bonded finishes; an incompatible residual film can become a bond breaker. Verify the design's loading and form-removal conditions rather than open the patio simply because it looks dry.
Approved Curing Methods for Landscape Contractors
Liquid Membrane-Forming Curing Compounds (ASTM C309): The most practical and widely used commercial method. A uniform coat of liquid acrylic or resin-based curing compound is spray-applied across the slab immediately following the broom finish after bleed water evaporates. The compound dries into an impervious plastic membrane that limits moisture loss from the slab, ensuring sustained internal hydration. White-pigmented compounds reflect solar heat during hot summer pours.
Moisture-Retaining Coverings (Wet Burlap & Polyethylene Sheeting): High-end residential and structural work uses clean burlap blankets saturated with water laid directly over the hardened concrete, covered with 4-mil white polyethylene plastic sheeting. Keep the covering continuously wet for the specified curing period; do not let drying blankets draw moisture from the concrete.
Ponding or Continuous Sprinkling: Continuously flooding the slab or maintaining fine water sprayers. Highly effective, but labor-intensive and rarely feasible on sloping landscape flatwork.