Study guide

Segmental wall systems and foundations

Oregon Landscape Contractor License Study Guide 2026

Track your progress as you read

Finished sections get a check mark.

1 1. Licensing and business: 1

Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility

2 2. Licensing and business: 2

Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens

3 3. Licensing and business: 3

LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing

4 4. Site safety and utilities

Excavation safety and hazard controls Oregon 811 notices and utility protection

5 5. Soil science and site preparation: 1

Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity

6 6. Soil science and site preparation: 2

Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds

7 7. Plants, turf, and establishment: 1

Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions

8 8. Plants, turf, and establishment: 2

Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth

9 9. Plants, turf, and establishment: 3

Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations

10 10. Plants, turf, and establishment: 4

Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials

11 11. Paving and concrete: 1

Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout

12 12. Paving and concrete: 2

Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing

13 13. Paving and concrete: 3

Concrete joints and curing

14 14. Walls and exterior structures: 1

Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings

15 15. Walls and exterior structures: 2

Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure

16 16. Walls and exterior structures: 3

Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions

17 17. Walls and exterior structures: 4

Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality

18 18. Design, grading, and drainage: 1

Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures

19 19. Design, grading, and drainage: 2

Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall

20 20. Design, grading, and drainage: 3

Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets

21 21. Design, grading, and drainage: 4

Bioretention sizing, media, and plants Swales and current DEQ erosion controls

22 22. Irrigation design and operation: 1

Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting

23 23. Irrigation design and operation: 2

Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage

24 24. Irrigation design and operation: 3

Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves

25 25. Irrigation design and operation: 4

Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions

26 26. Irrigation design and operation: 5

Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup

27 27. Backflow and potable protection: 1

Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies

28 28. Backflow and potable protection: 2

Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports

Segmental wall systems and foundations

Key Takeaways Explain This Topic AI

Gravity and reinforced walls resist loads differently.

Foundation, setback, and embedment follow the wall design.

Verify base units before errors propagate upward.

Last updated: October 2026

Note

Segmental walls use modular units with system-specific foundation, embedment, drainage, and reinforcement details. Distinguish gravity from reinforced walls, check actual loads and soil, and build the approved design rather than rely on generic height or grid-length rules.

Segmental Retaining Wall Mechanics: Gravity vs. MSE Systems

Segmental Retaining Walls ( SRWs ) are modular, dry-stacked retaining structures composed of manufactured high-density concrete units. Unlike traditional mortared masonry or cast-in-place concrete walls, SRWs do not utilize wet mortar between courses. Instead, the individual units interlock mechanically and accommodate slight ground movements and seasonal freeze-thaw cycles without cracking.

Shear Interlock Mechanisms

To resist the lateral earth pressure exerted by retained soils, modular SRW units rely on engineered shear interlock systems across adjacent courses:

Integrated Rear Lips or Flanges: Molded concrete lips projecting downward along the rear bottom edge of the block that hook over the rear top edge of the course below. This lip automatically establishes a consistent backward setback batter (typically 3/4 inch to 1 inch per vertical course, or 3° to 12° from vertical).

Shear Pins and Dowels: High-strength fiberglass, nylon, or composite pins inserted into pre-drilled vertical core holes in the blocks. The pins fit into receiving slots in the units above, locking adjacent courses together against shear forces while setting the course setback.

Integral Concrete Shear Lugs and Keys: Top-face or bottom-face tongue-and-groove concrete lugs that nest into corresponding channels in mating blocks, providing high shear capacity without loose hardware.

Gravity SRW vs. Mechanically Stabilized Earth (MSE) Walls

SRW installations are categorized structurally into two distinct operational systems based on wall height and loading:

Gravity SRW Systems: Rely entirely on the combined mass (self-weight) of the modular dry-stack concrete units, their depth from front to back, and their built-in setback batter to counterbalance lateral soil thrust. Unreinforced gravity walls are strictly limited in height by manufacturer specifications—typically 3 to 4 feet maximum height under level backfill conditions with stable soils.

Geosynthetic-Reinforced / Mechanically Stabilized Earth (MSE) Walls: When wall height exceeds the manufacturer's unreinforced gravity threshold, or when the wall supports a surcharge (such as a sloped backfill, driveway, parking lot, or structure), horizontal layers of geosynthetic reinforcement (geogrid) must be integrated between block courses. The geogrid embeds deep into the backfill mass behind the wall, interlocking with the compacted aggregate. This transforms the retained soil and geogrid into a unified, coherent composite gravity mass capable of safely retaining slopes exceeding 20 feet in height.

Leveling Pad Preparation and Subgrade Standards

The long-term structural integrity of an SRW depends completely on the stability of its foundation leveling pad. Because SRWs are flexible dry-stacked systems, any settlement, dip, or unlevel spot in the base pad will telegraph upward through every successive course, causing misaligned joints, gaping faces, and potential wall failure.

Foundation excavation

Use the wall-system and engineered detail for leveling-pad width, thickness, embedment, and drainage. The foundation must bear on suitable soil, not organic debris or unresolved soft fill. Verify elevation and step the base according to the detail where terrain changes.

Do not substitute one generic six-inch pad or trench width for every wall. A wall carrying a surcharge or founded on weak soil may require a different design. Keep excavation safe and protect adjacent roots, utilities, and structures. Confirm acceptance before placing units over concealed conditions.

Leveling materials and compaction

Use the specified aggregate or concrete leveling pad. Dense-graded crushed aggregate and clean open-graded stone have different properties; an ODOT three-quarter-inch-minus product is not the same gradation as AASHTO No. 57. The system detail determines material, thickness, lift, density, and any concrete alternative.

Compact aggregate in controlled lifts at suitable moisture and verify levels and bearing. A stated 95% Standard Proctor requirement compares field dry density with the ASTM D698 laboratory maximum; 95% Modified Proctor uses a different basis. For an assumed Standard Proctor maximum of 125 pounds per cubic foot, 95% is 118.75. A field result of 117 would fail that stated criterion, while 120 would meet it, subject to the full acceptance requirements.

Check the first course

Check front-to-back and along-wall levels using appropriate instruments and the system's tolerance. Small foundation errors can accumulate through successive courses. Do not import one eighth-inch-over-ten-feet tolerance into every product.

Dry-set and check base units, clean contact surfaces, maintain the specified setback, and confirm corners and curves with the actual unit geometry. Record base elevation and embedment before concealing them. If a unit rocks, correct its support rather than shim it with unsuitable loose material.

Base Unit Embedment (Burial) Rules

The lowest course of SRW modular blocks must never be set directly on surface grade. It must be permanently embedded (buried) beneath the finished grade at the front of the wall toe.

Purpose of Embedment

Prevents Toe Kickout: Lateral earth pressure exerts maximum shear force along the wall base. Passive soil resistance from the buried front soil locks the base block in place.

Protects the Leveling Pad: Burial prevents surface runoff from washing out, eroding, or undermining the compacted aggregate base pad.

Frost Heave Protection: In cold interior regions of Oregon (such as Central and Eastern Oregon), embedment helps place the base pad beneath the regional frost penetration depth.

Embedment is a design detail

Buried base units protect against sliding, scour, frost effects, and loss of toe support. Required embedment depends on wall height, grade at the toe, foundation conditions, erosion exposure, and the particular wall system. Use the engineered or manufacturer's detail; a rule such as one inch per foot of height is not a statewide statutory requirement.

Distinguish exposed height from total structural height, which includes embedded courses. A six-inch and an eight-inch block produce different course counts. Establish the bottom and top elevations on the drawing and calculate courses from the actual unit dimensions. Do not reduce embedment to save excavation without approval.