Study guide

Wall drainage, backfill, and geogrid

Oregon Landscape Contractor License Study Guide 2026

Track your progress as you read

Finished sections get a check mark.

1 1. Licensing and business: 1

Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility

2 2. Licensing and business: 2

Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens

3 3. Licensing and business: 3

LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing

4 4. Site safety and utilities

Excavation safety and hazard controls Oregon 811 notices and utility protection

5 5. Soil science and site preparation: 1

Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity

6 6. Soil science and site preparation: 2

Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds

7 7. Plants, turf, and establishment: 1

Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions

8 8. Plants, turf, and establishment: 2

Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth

9 9. Plants, turf, and establishment: 3

Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations

10 10. Plants, turf, and establishment: 4

Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials

11 11. Paving and concrete: 1

Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout

12 12. Paving and concrete: 2

Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing

13 13. Paving and concrete: 3

Concrete joints and curing

14 14. Walls and exterior structures: 1

Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings

15 15. Walls and exterior structures: 2

Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure

16 16. Walls and exterior structures: 3

Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions

17 17. Walls and exterior structures: 4

Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality

18 18. Design, grading, and drainage: 1

Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures

19 19. Design, grading, and drainage: 2

Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall

20 20. Design, grading, and drainage: 3

Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets

21 21. Design, grading, and drainage: 4

Bioretention sizing, media, and plants Swales and current DEQ erosion controls

22 22. Irrigation design and operation: 1

Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting

23 23. Irrigation design and operation: 2

Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage

24 24. Irrigation design and operation: 3

Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves

25 25. Irrigation design and operation: 4

Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions

26 26. Irrigation design and operation: 5

Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup

27 27. Backflow and potable protection: 1

Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies

28 28. Backflow and potable protection: 2

Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports

Wall drainage, backfill, and geogrid

Key Takeaways Explain This Topic AI

Water loading requires a functional collection and outlet system.

Use designed filter and drain details for the actual materials.

Reinforcement strength, direction, length, and connection are design inputs.

Compact without displacing the face or damaging grid.

Last updated: October 2026

Drainage Aggregate, Perforated Pipe, and Geotextile Separation

Water behind a wall adds hydrostatic loading and can weaken soil or erode support. Water's unit weight is about 62.4 pounds per cubic foot; pressure increases by 62.4 pounds per square foot for each foot of water depth. At three feet depth, pressure is 187.2 psf at that point, not 62.4 pounds per cubic foot of pressure. Drainage is part of the design, not a substitute for checking groundwater and outlet feasibility.

Drainage aggregate and unit fill

Provide the design's drainage zone and clean compatible aggregate. Its thickness, height, gradation, and connection to outlets follow the wall system and site design. Fill hollow units as the manufacturer requires; not all units have the same cores or fill detail.

Keep soil fines from contaminating the drainage zone. A separator must be selected for filtration and flow with the actual soils, not only fabric weight or the woven/nonwoven name. Verify placement as the wall rises, since later correction may require dismantling the structure.

Drain pipe and outlet

Use the specified diameter, material, elevation, slope, and outlet arrangement. Two-row perforated pipe commonly places holes near the lower quadrants so collection begins near the drain bed; other products have different perforation patterns. Follow the product and design rather than require all holes to face one direction.

Provide an approved outlet that remains open and protected from erosion and pests as specified. A pipe with no effective lower outlet cannot drain the wall as intended. Surface runoff above the wall must also be managed so it does not continually saturate the backfill. Do not discharge onto a neighbor or road without authorization.

Filters and interfaces

Use the approved separator where native fines could enter drainage aggregate. The design may specify a fabric envelope, a graded filter, or another detail appropriate to the soil and water. Pipe socks are neither universally required nor universally banned.

Avoid folds, tears, and unapproved overlaps that obstruct the path or allow soil bypass. Keep filter placement coordinated with reinforcement connections and wall units. If a filter clogs, the system can retain water even though the pipe itself is clear, so diagnose the complete interface.

Retained Backfill Placement and Compaction Zones

Improper backfilling and compaction can displace units and reduce wall performance. Backfill material must be placed and compacted progressively as each block course is erected.

Lift Thickness and Soil Types

Backfill must be placed in uniform horizontal lifts not exceeding 6 to 8 inches of loose thickness.

Acceptable backfill soils include granular sands, gravels, or low-plasticity silty gravels. Heavy organic soils, expansive high-plasticity clays, and construction rubble must never be used in the reinforced zone.

The project may specify 95% Standard Proctor maximum dry density (ASTM D698) , as in common CMHA specifications; follow its actual density, moisture tolerance, and testing requirements.

Compaction near the facing

Use light equipment near the wall face according to the system's installation instructions and engineered exclusion distance. Heavy equipment can displace units or overload an incomplete wall. Keep fill lifts level, avoid pushing a large mound against the facing, and monitor alignment during compaction.

The permitted machine mass and distance depend on the wall system and design; a universal three-foot boundary and 250-pound limit are not Oregon law. Follow the specified density and moisture requirements while maintaining unit alignment. Stop and correct movement before additional courses conceal the defect.

Geosynthetic Reinforcement (Geogrid): Mechanics, Sizing, and Tensioning

When a retaining wall exceeds its allowable gravity height or supports external surcharges, geogrid provides the tensile strength that soil naturally lacks.

Reinforcement direction and connections

Geogrid products have specified tensile properties and directions. Uniaxial products emphasize one direction; biaxial products distribute strength differently. Read the actual manufacturer data and wall design. Roll direction does not automatically prove the required strength direction.

Lay the specified strength axis into the retained mass, maintain the required wall connection, and follow approved overlap, tensioning, and coverage details. Do not splice or truncate the load path without design approval. A grid oriented wrongly can lose the reinforcement function even though it visually covers the soil.

Reinforcement length and orientation

Geogrid length, vertical spacing, strength, and connection capacity come from the wall design. Do not size reinforcement by a universal 0.6 H 0.6H 0.6 H shortcut. Surcharges, slopes, water, soil strength, wall height, and the facing connection can change the requirement. A reinforcement zone must fit within property and utility constraints; grid cannot simply be cut short at a boundary.

Place the grid in its specified principal strength direction, normally extending into the retained soil, and remove slack according to the installation instructions. A roll's long direction is not automatically its strong direction. Keep overlapping and connection details consistent with the design. If a pipe or foundation interrupts the reinforcement, obtain a revised detail rather than cut an opening without review.

Geogrid Tensioning and Backfilling Protocol

Ensure the soil lift beneath the geogrid elevation is compacted to 95% Standard Proctor density and screeded completely flat, flush with the top of the receiving block course.

Lay the geogrid flat over the modular blocks, hooking it over the shear pins, rear lip, or lugs according to manufacturer instructions. Geogrid should extend forward to within 1 inch of the front face.

Pull the geogrid taut away from the wall face into the excavation zone to eliminate all slack, folds, or wrinkles.

Stake the back edge of the geogrid firmly into the compacted backfill using metal U-pins or mounds of aggregate to maintain continuous tension.

Spread backfill aggregate starting at the back of the wall blocks and pushing backward toward the cut hillside. Never push soil toward the wall face, as this creates ripples and slack in the reinforcement.

Provide the specified compacted cover before equipment crosses the grid. Six inches is a common minimum in installation guidance; the wall system, grid, equipment, and approved design control. Do not turn or brake equipment in a way that displaces or damages reinforcement.