1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Masonry reinforcement, wall permits, and failure
Key Takeaways Explain This Topic AI
Oregon's retaining-wall rules consider building impacts as well as height.
The four-foot reference is measured footing bottom to wall top.
Surcharge and ascending slope can change permit treatment.
Sliding, overturning, bearing, and slope failure need separate review.
Last updated: October 2026
Reinforced cells and grout
Install bar size, spacing, laps, cover, anchorage, and grout according to the structural detail. Keep cells clear for consolidation and required inspection. Mortar joining the units does not replace reinforcement or grout in a design that requires them.
Coordinate drainage outlets and joints so they do not compromise reinforcing continuity. Inspect before concealment and allow appropriate curing. A memorized bar diameter or lap multiple does not approve a wall with different soil, height, or load.
Hydrostatic Pressure Relief and Waterproofing
Because mortared walls are impermeable, water trapped behind them cannot seep through joints. Without dedicated drainage, hydrostatic pressure will rapidly build up and crack or overturn the wall:
Weep Holes: Schedule 40 PVC or clay sleeves of 2 to 4 inches in diameter must be installed through the wall stem directly above finished grade, spaced horizontally every 4 to 6 feet along the base of the wall . The inlet of each weep hole must be protected on the back face by a pocket of clean crushed rock wrapped in non-woven filter fabric to prevent soil blockage.
Closed Collector Pipe Alternative: Alternatively, a continuous 4-inch perforated drain pipe embedded in a 12-inch column of clean washed rock can be installed along the back of the footing and sloped to daylight.
Back-Face Waterproofing: The back face of a mortared wall in contact with earth must be parged smooth with Portland cement mortar, coated with an elastomeric bituminous damp-proofing/waterproofing membrane , and covered with a dimpled drainage board (core mat). This prevents moisture from wicking through the masonry, which causes white efflorescence, paint peeling, and winter freeze-thaw spalling.
Oregon retaining-wall jurisdiction
Oregon's 2023 Residential Specialty Code requires permits statewide for retaining walls that safeguard building users, support a regulated building, or retain material that could impact a regulated building. Municipalities may regulate other walls by ordinance, with the code's restrictions on local height thresholds. The code measures the four-foot reference height from the bottom of the footing to the top of the wall, not merely the exposed face or the difference between grades.
The local threshold may not include walls four feet or less under the stated conditions, except walls supporting ascending slopes steeper than 3:1 or a nonsoil surcharge. Do not import a generic IRC rule or label footing-to-top height “unbalanced fill.” Review the actual wall, nearby buildings, slopes, and surcharges with the local building department. Permit exemption does not remove the duty to build safely or comply with other applicable requirements.
A vehicle, building, stored material, or upper terrace can add load. Multiple walls can interact; one fixed terrace setback does not make them structurally independent. Obtain a design addressing the complete slope and surcharge conditions. Whether an engineer is required follows the jurisdiction and design requirements, not the assumption that every wall over a certain exposed height must have identical details. 2023 ORSC Chapter 1 .
The Five Primary Retaining Wall Failure Modes
Landscape contractors must understand how and why retaining walls fail in order to diagnose site distress and construct compliant structures:
Failure Mode Physical Mechanism Primary Engineering Prevention Strategy
1. Sliding Failure The entire wall translates horizontally along its base because lateral soil thrust exceeds the base friction. Increase base embedment, install a concrete shear key beneath the footing, widen the base pad, or install geogrid reinforcement ( F S s l i d i n g ≥ 1.5 FS_{sliding} \ge 1.5 F S s l i d in g ≥ 1.5 ).
2. Overturning Failure The wall rotates forward around its toe pivot point because lateral overturning moments exceed the stabilizing resisting moment. Introduce a backward setback batter (1 to 2 in/ft), widen the footing toe and heel, increase wall mass, or install geogrid reinforcement ( F S o v e r t u r n i n g ≥ 2.0 FS_{overturning} \ge 2.0 F S o v er t u r nin g ≥ 2.0 ).
3. Bearing Capacity Failure The downward and rotational load at the front toe crushes or punches into soft subgrade soil, causing the wall to sink and tilt forward. Excavate soft native soils, construct a wider and thicker crushed aggregate leveling pad, or pour an engineered reinforced concrete strip footing.
4. Deep-Seated Global Failure A rotational shear slip circle passes deep beneath the entire wall foundation through native subsoil layers, taking the entire hillside with it. Requires geotechnical slope stability analysis, regrading slope geometry, deep soil nails, driven piles, or extended geogrid embedment lengths ( L > 1.0 H L > 1.0H L > 1.0 H ).
5. Hydrostatic Pressure Accumulation Undrained groundwater saturates backfill, exerting 62.4 lbs/ft³ of hydrostatic fluid pressure that doubles or triples total lateral force. The #1 cause of wall failure in Oregon. Install 12 inches of clean washed rock (ODOT 3/4"-clean), 4-inch perforated pipe sloped to daylight, weep holes, and geotextile wrap.