Study guide
Landscape steps, stairs, and safe transitions
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Landscape steps, stairs, and safe transitions
Key Takeaways Explain This Topic AI
Calculate risers from total elevation change and check uniformity.
Stair dimensions, guards, handrails, and landings follow the applicable code and use.
Foundations and drainage prevent settlement that can create dangerous uneven steps.
Last updated: October 2026
Determine what rules apply
Landscape steps can be garden features, building access, required egress, or part of a public route. Those uses can trigger different codes, permits, accessibility provisions, guardrails, and handrails. Identify the jurisdiction and function before choosing geometry. A private informal path is not automatically governed by every public stair provision, but it still needs safe, durable construction.
An accessible route generally cannot be replaced with stairs alone. Where access is required, coordinate an appropriate ramp or other permitted route and its landings. A sign saying “watch your step” does not correct a required accessible connection. Review thresholds, door swings, and emergency routes as part of the complete design.
Measure finished elevations at the top and bottom, including planned paving, soil settlement, and door clearance. A staircase calculated from rough ground before the patio thickness is chosen can end with a short final riser. Use one datum and record whether each elevation refers to subgrade, foundation, or finished walking surface.
Riser and tread calculations
Total rise divided by the selected number of risers gives uniform riser height. Suppose total finished rise is thirty-six inches. Six risers produce six inches each; five produce 7.2 inches each. The acceptable choice depends on applicable limits, comfort, available run, and the design. Do not simply use whichever produces the least material.
The number of treads is commonly one fewer than risers when the upper landing serves as the final walking surface. Six risers with five twelve-inch treads use sixty inches of horizontal tread run before any required landing allowance. Confirm the actual stair arrangement; a separate top tread or intermediate landing changes the geometry. Show the relationship in a section drawing instead of relying on a mental sketch.
Uniformity matters. A single riser that differs appreciably from the others disrupts the user's rhythm and can cause a fall. Check the code's permitted variation and construction tolerance. Account for tread thickness, mortar, nosing, slope, and finish material in each level. A nominally uniform foundation can produce nonuniform finished risers if one cap is thicker.
Material and foundation choices
Concrete, masonry, stone, timber, and modular retaining-wall step systems need different supports and connection details. Natural stone's uneven thickness requires careful bedding and selection. A narrow stone supported only at its edges can crack. Timber in soil needs appropriate treatment and secure anchorage; a loose landscape tie is not automatically a stable stair.
Prepare the foundation for expected loads, frost, drainage, and soil conditions. Compact appropriate material in controlled lifts and avoid building on organic debris or unresolved soft fill. Steps need support at landings and transitions as well as under the center of the run. Retaining the sides can require its own design, especially where a stair cuts into a slope.
Manage water so it does not pond on treads, undermine the base, or freeze at the landing. A slight designed drainage slope differs from an inconsistent tread plane. Follow the code and material system's limits. Preserve an approved outlet, and do not direct concentrated runoff onto the stair from an adjacent bed or roof.
Rails, guards, lighting, and visibility
Handrails provide graspable support; guards prevent falls from elevated edges. They are not interchangeable. Trigger heights, graspability, continuity, openings, and structural loading come from the applicable code. A decorative post-and-rope edge is not automatically a compliant guard or handrail. Show approved connections so the rail does not rely on a loosely set paving stone for support.
Light the approach, tread edges, and landings without glare. Avoid placing a fixture where a foot can strike it or where mature plants will cover it. Use surface texture suited to wet weather, and consider contrast that helps users distinguish a change in level. Do not create a single unexpected step in an otherwise level path when a safer graded transition is practical.
Field verification and maintenance
Set stringlines or instrument targets for each finished elevation. Dry-fit modular or natural units where useful, measure the first and last risers, and check the complete run before permanent setting. Inspect the landing after adjacent paving is placed; that work can change the final riser. Keep work closed to users until supports, mortar or concrete cure, and rails are ready.
At closeout, inspect rocking units, loose connections, ponding, trip edges, and clear route width. Explain cleaning and repair needs, especially where algae, leaf debris, or winter ice affect traction. A staircase remains safe through stable support, consistent geometry, appropriate protection, and maintenance rather than one correct rise calculation alone.
Reference table
- Thirty-six-inch rise example Result
- Six equal risers 6 inches each
- Five equal risers 7.2 inches each
- Six risers with upper landing as final surface Usually five treads
- Five twelve-inch treads 60 inches run before other landing allowances