Study guide
Landscape design, circulation, and coordinated details
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Landscape design, circulation, and coordinated details
Key Takeaways Explain This Topic AI
Design connects function, circulation, proportion, planting, drainage, and maintenance.
Establish site constraints and elevations before refining appearance.
Coordinate drawings and details so separate systems do not conflict.
Last updated: October 2026
Start with the site and users
Document boundaries, easements, utilities, buildings, doors, windows, existing plants, slopes, drainage, exposure, and important views. Confirm which boundaries and elevations are reliable survey information and which are preliminary observations. A tape measurement of a fence does not establish the legal property line. Record owner goals, accessibility needs, maintenance capacity, pets, play, storage, and expected use.
Separate constraints from preferences. An easement can prevent a permanent structure; a favorite paving color is a preference. A required overflow route cannot be erased to create a symmetrical planting bed. Identify likely permit and specialist-design needs early, especially for structures, retaining walls, steep slopes, electrical supply, and significant drainage changes.
Use a base plan and analyze movement and water before choosing decorative materials. People need safe routes between doors, vehicles, activity areas, and maintenance access. Water needs an approved path that does not conflict with those routes or neighboring property. Trees need adequate soil and crown volume. These systems occupy the same limited space, so a successful design resolves them together.
Organize spaces and circulation
Create functional zones, such as arrival, gathering, play, service, and quiet garden. Give primary paths an obvious destination and appropriate capacity. A narrow service path behind shrubs differs from the main route used by several people carrying furniture. Avoid placing a gate so its swing blocks the route or an open gate hides a vehicle sightline.
Consider the experience from several locations and seasons. A focal point should be visible from the intended approach, while a screen should block the actual unwanted view. A deciduous tree may open a winter view that an evergreen would retain. Maintain safe clearances around corners, lighting, stairs, and utility equipment. The mature planting plan should preserve those clearances.
Accessibility requirements apply where triggered, with geometry that must be tested from finished elevations. A drawing labeled “accessible” is not sufficient if the route contains excessive cross slope, steps, narrow gates, or unstable surfaces. Coordinate site slopes with the applicable route and ramp criteria rather than resolve drainage by steepening the path after layout.
Visual principles with practical consequences
Scale relates an element to its setting and users; proportion relates parts to each other. A massive wall in a small yard can dominate the space even when structurally sound. Balance can be symmetrical or asymmetrical. Repetition of plants, materials, or forms creates continuity, while excessive repetition can flatten seasonal interest. Emphasis establishes a focal point without making every object compete for attention.
Use unity through a limited, compatible material palette and consistent detailing. A repeated paver module can simplify layout and reduce cuts. Contrast in texture, leaf size, color, or form can make an important feature legible. Plant massing should respond to mature dimensions and cultural compatibility rather than create a pattern that requires plants to be kept permanently undersized.
These principles do not override construction needs. A perfectly centered tree may conflict with a sewer easement. A visually flat patio still needs its designed drainage plane. Resolve such conflicts visibly in the design, explaining the adjustment and its function instead of allowing the crew to invent a solution during construction.
Coordinate systems and details
Review planting, grading, drainage, irrigation, lighting, and structural drawings together. Compare elevations at thresholds, drains, wall tops, stairs, and irrigation assemblies. A PVB's required relationship to downstream outlets can be lost if a planter is raised after irrigation design. A light can be hidden by a mature shrub. A drain cleanout can become inaccessible beneath a deck.
Details should show the material transitions that the plan view cannot explain: paving to soil, deck to building, wall to slope, pipe crossing, and planting on a structure. Identify materials, dimensions, joints, drainage, and required protection. Generic details must fit the actual site; a standard wall diagram does not approve an unusual surcharge or foundation condition.
Stage the work so hidden systems are inspected before concealment. Protect finished foundations from trenching damage and protected roots from storage and machinery. Budget access and construction sequence along with final appearance. A beautiful completed plan that cannot be built through the available gate needs redesign before materials arrive.
Evaluate the finished design
Walk the proposed routes, test critical elevations, and review maintenance tasks. Can the owner clean the drain, reach a valve, replace a light, mow safely, and inspect a tree tie? Does overflow remain safe when the inlet clogs? Compare expected maintenance with the owner's resources. Design quality includes predictable use and upkeep, not only the initial photograph.
Reference table
- Design stage Main output
- Site analysis Verified constraints and user needs
- Concept Functional spaces and circulation
- Coordination Compatible planting, elevations, drainage, and equipment
- Details Buildable material transitions and protection
- Review Safe use, maintenance, access, and overflow