Study guide

Inlets, conveyance, cleanouts, and outlets

Oregon Landscape Contractor License Study Guide 2026

Track your progress as you read

Finished sections get a check mark.

1 1. Licensing and business: 1

Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility

2 2. Licensing and business: 2

Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens

3 3. Licensing and business: 3

LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing

4 4. Site safety and utilities

Excavation safety and hazard controls Oregon 811 notices and utility protection

5 5. Soil science and site preparation: 1

Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity

6 6. Soil science and site preparation: 2

Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds

7 7. Plants, turf, and establishment: 1

Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions

8 8. Plants, turf, and establishment: 2

Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth

9 9. Plants, turf, and establishment: 3

Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations

10 10. Plants, turf, and establishment: 4

Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials

11 11. Paving and concrete: 1

Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout

12 12. Paving and concrete: 2

Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing

13 13. Paving and concrete: 3

Concrete joints and curing

14 14. Walls and exterior structures: 1

Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings

15 15. Walls and exterior structures: 2

Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure

16 16. Walls and exterior structures: 3

Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions

17 17. Walls and exterior structures: 4

Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality

18 18. Design, grading, and drainage: 1

Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures

19 19. Design, grading, and drainage: 2

Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall

20 20. Design, grading, and drainage: 3

Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets

21 21. Design, grading, and drainage: 4

Bioretention sizing, media, and plants Swales and current DEQ erosion controls

22 22. Irrigation design and operation: 1

Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting

23 23. Irrigation design and operation: 2

Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage

24 24. Irrigation design and operation: 3

Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves

25 25. Irrigation design and operation: 4

Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions

26 26. Irrigation design and operation: 5

Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup

27 27. Backflow and potable protection: 1

Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies

28 28. Backflow and potable protection: 2

Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports

Inlets, conveyance, cleanouts, and outlets

Key Takeaways Explain This Topic AI

Inlet sizing needs rainfall, area, runoff, grade, and debris assumptions.

Pipe capacity and inlet interception are different checks.

Keep sediment and maintenance access under control.

Outlet elevation and downstream conditions can govern performance.

Last updated: October 2026

Area Drains, Catch Basins, and Conveyance Piping

Surface drainage structures collect concentrated stormwater runoff from pavements, patios, lawn low points, and roof downspouts before it can saturate the subgrade.

Inlet and pipe capacity

Size inlets from drainage area, runoff characteristics, design rainfall, grade, debris exposure, and the available outlet. A six-inch basin is not automatically suitable for every five-hundred-square-foot yard. Inlet interception capacity can be less than the connected pipe capacity, particularly where water bypasses a grate on a slope.

The Rational Method uses Q = C I A Q=CIA Q = C I A with units and the applicable conversion constant. In conventional US usage, acres and inches per hour produce approximately cubic feet per second; square feet cannot be inserted without conversion. A one-acre paved catchment with assumed C = 0.9 C=0.9 C = 0.9 and I = 2 I=2 I = 2 in/hr produces about 1.8 cfs. Use a locally appropriate storm and method, not this illustrative intensity as an Oregon design standard.

The Sediment Sump

A catch basin may include a sump below the outlet to collect sediment. Its dimensions and maintenance interval follow the selected detail, sediment load, and inspection findings. Not every inlet has a four-to-six-inch sump. Check it after significant runoff, remove debris before storage is exhausted, and dispose of collected material appropriately. A full sump can pass sediment into the downstream pipe even when the grate looks clear.

Grate Types and Environmental Applications

Pedestrian grates: Set the grate to the designed surface elevation. Where accessibility requirements apply, openings must not pass a half-inch sphere, and elongated openings run perpendicular to the dominant travel direction. Check slip resistance, trip hazards, cane and wheel interaction, and the applicable accessible-route criteria.

Atrium grates: Raised grates can remain partly open when leaves accumulate around the base, but they still need inspection. Use them where their projection does not create a pedestrian or maintenance hazard.

Traffic-rated grates: Specify the loading appropriate to actual vehicles and the approved structure. A manufacturer's rating for a grate does not establish the capacity of a poorly supported basin or collar; distinguish wheel, axle, and complete assembly ratings.

Conveyance Piping Hydraulics: Smooth PVC vs. Corrugated HDPE

Water intercepted by surface catch basins and roof downspouts must be conveyed via solid (non-perforated) pipe . Pipe hydraulic flow capacity is dictated by pipe diameter, slope, and interior surface roughness (Manning's roughness coefficient, n n n ): Manning’s Equation Flow: Q = 1.486 n × A × R 2 / 3 × S 1 / 2 \text{Manning's Equation Flow: } Q = \frac{1.486}{n} \times A \times R^{2/3} \times S^{1/2} Manning’s Equation Flow: Q = n 1.486 ​ × A × R 2/3 × S 1/2

Smooth-wall pipe: Generally has a lower roughness coefficient than a comparable corrugated interior. Use the approved Manning coefficient and actual internal diameter in gravity-flow calculations. Smoothness cannot prevent clogging from leaves or a blocked outlet.

Corrugated-interior pipe: Generally creates more resistance and can retain sediment in its corrugations. Do not assume one fixed percentage capacity reduction applies to every product. The calculation must account for roughness, gradient, flow depth, and downstream conditions.

Pipe capacity depends on internal diameter, slope, roughness, depth of flow, entrance losses, and downstream conditions. Smooth-wall pipe commonly has less friction than comparable corrugated pipe. Do not assign a maximum drainage area without rainfall and runoff assumptions. Use the approved hydraulic calculation, account for inlet and outfall controls, and preserve cleanout access.

Warning

Keep roof and concentrated surface runoff in the designed conveyance system. Feeding it into a groundwater collection trench can discharge water through perforations and wet the area the drain was intended to protect. An engineered infiltration or stormwater system may use perforated distribution pipe deliberately; that is a different designed function. Confirm capacity, setbacks, and approved disposal before connecting sources.

Cleanouts, Venting, and Outfall Discharge Engineering

Provide the access, outlet protection, and maintenance arrangements required by the design. A drainage layout is incomplete if it has nowhere lawful and hydraulically suitable to discharge. Establish responsibility for access and cleaning at project handoff.

Cleanouts: Place access where specified and where direction changes or run length make maintenance necessary. Use suitable sweep fittings and accessible capped risers. A generic fifty-to-one-hundred-foot spacing is not a statewide requirement for every yard drain.

Daylight outfalls: Confirm an approved receiving location, stable grade, and permission before discharging. Use the specified animal protection without restricting required flow; screens can collect debris and need cleaning. Protect the end from damage and bank erosion.

Pop-up emitters: These need sufficient hydraulic head and a safe receiving surface. They do not create a lower outfall on a flat site, and water remaining in the pipe can be vulnerable to freezing or sediment accumulation. Check the actual product and drainage detail.

Energy dissipation: Size riprap, an apron, or another dissipator for discharge and receiving-soil conditions. Do not select an ODOT rock class solely from a generic six-to-twelve-inch stone rule. A failed apron can move the erosion problem farther downstream.

Inlet-to-outlet field check

Trace a proposed yard-drain route from the lowest surface spot to its approved outlet before ordering materials. Suppose the inlet pipe invert is elevation 102.40 feet and the planned outlet invert is 101.80 feet over sixty horizontal feet. Available fall is 0.60 foot, giving a one-percent slope. If a utility crossing requires raising the pipe above the inlet invert, that profile cannot continuously drain by gravity. Resolve the conflict with the designer instead of hiding a hump in the trench. Check the grate elevation separately: adequate pipe fall will not help runoff that cannot reach the inlet.

At closeout, use an appropriate water check, inspect for ponding and leakage, and record cleanout locations. A brief hose test confirms some flow but does not demonstrate capacity for the design storm. Persistent sediment can indicate eroding upstream soil, poor pretreatment, or a damaged filter rather than a need for a larger pipe alone.