Study guide
Swales and current DEQ erosion controls
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Swales and current DEQ erosion controls
Key Takeaways Explain This Topic AI
The renewed 1200-C permit became effective December 15, 2025.
Smaller work can be covered through a larger common development plan.
Stabilization completion varies among fourteen-day, seven-day, and specified buffer conditions.
Initiate required stabilization immediately when its cessation trigger applies.
Last updated: October 2026
Vegetated swales and maintenance
A swale can convey runoff, slow flow, filter sediment, or provide treatment depending on its design. Cross-section, longitudinal slope, vegetation, check structures, and hydraulic loading must match that function. One minimum nine-minute residence time does not apply to every Oregon swale.
Dense vegetation slows shallow distributed flow, while concentrated high-velocity flow can erode the channel or bypass treatment. Preserve a safe overflow route and use the specified erosion-resistant inlet and outlet protection. Remove accumulated sediment without excavating the approved profile or damaging established plants. Replant bare areas and investigate repeated scour rather than continually replace plants in a hydraulically unsuitable location.
Oregon DEQ NPDES 1200-C Construction Stormwater Permit
Under the federal Clean Water Act and Oregon Revised Statutes (ORS 468B), the Oregon Department of Environmental Quality (DEQ) regulates stormwater discharges from construction sites to protect state waterways from sediment pollution.
Permit scope and project responsibilities
The DEQ 1200-C permit renewed effective December 15, 2025 regulates qualifying construction stormwater discharges to surface waters. Coverage generally includes one acre or more of disturbance and smaller portions of a common plan of development that reaches the threshold. A small landscape subcontract does not automatically escape coverage when it is part of a larger development. Other local and DEQ permit arrangements may apply.
Identify the permit holder, approved erosion and sediment control plan (ESCP), inspection responsibilities, and stabilization sequence before clearing. Qualified preparation requirements depend on project conditions; do not claim every private yard plan must bear a professional engineer's stamp. The landscaping crew must follow the approved controls and coordinate changes with the responsible party. Current DEQ construction stormwater permit .
Installing and inspecting erosion controls
Install the approved controls before the disturbance they are intended to protect. Silt fences intercept distributed sheet flow; they are not dams for a channel. Key fabric into the ground using the approved trench or installation method, anchor it securely, and keep runoff from bypassing the ends. Fabric laid loosely on the surface can be undercut. Trench geometry, post spacing, and support depend on the selected detail rather than one universal statewide six-by-six-inch trench.
Wattles shorten effective slope length and slow shallow runoff. Use the specified contour placement, anchoring, and ground contact. A gap below a wattle can concentrate flow and scour soil. Check after rainfall and repair displacement. Do not put a sheet-flow control in a concentrated channel unless the approved detail is designed for that load.
Stabilized access reduces tracking onto roads. Select the specified aggregate, underlayment, length, width, and thickness for the site and vehicles. Dimensions differ by jurisdiction and project type: Portland's detail distinguishes residential access from other projects. Maintain the rock and remove tracked sediment promptly without washing it into drains. Portland erosion-control manual and details .
Protect receiving storm-drain inlets with approved controls while preserving necessary overflow and traffic safety. A full filter bag can obstruct drainage and cause flooding. Inspect sediment accumulation, repair damage, and maintain stockpile covers, perimeter controls, concrete-washout containment, and spill prevention. Document corrections and notify the responsible person when an installed control cannot handle the observed flow.
Renewed permit stabilization deadlines
Under the renewed 1200-C permit, immediately initiate stabilization where work has permanently ceased or will be inactive for fourteen or more calendar days. For disturbance limited to less than five acres at one time, complete installation as soon as practicable and no later than fourteen calendar days after initiation. Five acres or more at one time, specified impaired-water discharges, and specified areas upgradient of encroached buffers use a seven-day completion deadline.
Encroached-buffer areas under the identified compliance options require exposed soil stabilized at each day's end and permanent cessation stabilization completed within three days after immediate initiation. These distinctions replace an unsupported general “wet season seven days/dry season fourteen days” rule. Vegetative stabilization includes protective cover while vegetation establishes, not simply scattering seed before a storm.
Record the cessation date, initiation, controls used, inspections, and corrective actions. Temporary stabilization keeps soil in place until work resumes; final stabilization must satisfy the permit before controls are removed or coverage terminated. Protect concrete washout, fuels, stockpiles, and access routes as separate pollutant sources.
Scheduling example
Suppose a covered project disturbs three acres at a time and a finished slope will sit inactive for eighteen calendar days. Initiate stabilization immediately when the inactive period is established, then apply the completion deadline for the project's qualifying category. Do not wait until day fourteen to start. If the site instead falls within a specified impaired-water or buffer condition, its shorter deadline controls. The same crew and acreage do not override the receiving-water condition.
Before leaving the area, check that cover is secured, drainage remains open, and follow-up inspections are assigned. A purchase order for seed is not installed stabilization. Preserve dates and photographs so the permit holder can demonstrate the actual sequence and address failure after storms.
Stabilization decision table
Condition under the renewed permit Initiation Completion limit
Permanent cessation or planned inactivity of at least fourteen calendar days Immediately Use the qualifying category below
Less than five acres disturbed at one time, without a listed shorter-deadline condition Immediately when triggered As soon as practicable, within fourteen calendar days
Five acres or more, or specified impaired-water / upgradient-buffer conditions Immediately when triggered As soon as practicable, within seven calendar days
Specified encroached-buffer condition Stabilize exposed soil at each day's end Permanent cessation: within three days after immediate initiation
Confirm the permit's exact condition and approved ESCP before selecting a row. The table is a study aid; it does not change inspection, final-stabilization, or discharge requirements.