Study guide

Hydrozones and plant-based irrigation design

Oregon Landscape Contractor License Study Guide 2026

Track your progress as you read

Finished sections get a check mark.

1 1. Licensing and business: 1

Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility

2 2. Licensing and business: 2

Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens

3 3. Licensing and business: 3

LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing

4 4. Site safety and utilities

Excavation safety and hazard controls Oregon 811 notices and utility protection

5 5. Soil science and site preparation: 1

Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity

6 6. Soil science and site preparation: 2

Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds

7 7. Plants, turf, and establishment: 1

Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions

8 8. Plants, turf, and establishment: 2

Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth

9 9. Plants, turf, and establishment: 3

Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations

10 10. Plants, turf, and establishment: 4

Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials

11 11. Paving and concrete: 1

Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout

12 12. Paving and concrete: 2

Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing

13 13. Paving and concrete: 3

Concrete joints and curing

14 14. Walls and exterior structures: 1

Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings

15 15. Walls and exterior structures: 2

Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure

16 16. Walls and exterior structures: 3

Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions

17 17. Walls and exterior structures: 4

Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality

18 18. Design, grading, and drainage: 1

Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures

19 19. Design, grading, and drainage: 2

Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall

20 20. Design, grading, and drainage: 3

Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets

21 21. Design, grading, and drainage: 4

Bioretention sizing, media, and plants Swales and current DEQ erosion controls

22 22. Irrigation design and operation: 1

Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting

23 23. Irrigation design and operation: 2

Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage

24 24. Irrigation design and operation: 3

Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves

25 25. Irrigation design and operation: 4

Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions

26 26. Irrigation design and operation: 5

Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup

27 27. Backflow and potable protection: 1

Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies

28 28. Backflow and potable protection: 2

Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports

Hydrozones and plant-based irrigation design

Key Takeaways Explain This Topic AI

Group plants with compatible water needs, exposure, soil, and establishment stage.

A valve zone should support one coherent watering schedule and compatible application rates.

New and established plants can need different schedules even when they are the same species.

Last updated: October 2026

What a hydrozone controls

A hydrozone groups plants and site conditions that can be watered together. It is a horticultural decision supported by hydraulic design. A zone is not coherent merely because all its outlets fit under the meter capacity. The plants must also tolerate the same frequency and water depth, and the equipment must apply water at compatible rates.

Separate turf from shrubs when their root depth, water needs, or application method differ. Separate high-water plants from established drought-adapted plants. Consider shade, afternoon heat, wind, slopes, soil texture, and restricted root volume. A shaded bed near a north wall can dry differently from an exposed bed of the same species beside a west-facing paved surface.

Think beyond installation day. Newly planted material has a small functional root zone that often needs more frequent checks than established plants. An established tree's irrigation should address its larger active root area rather than repeatedly wet only the former nursery root ball. Temporary establishment zones or accessible supplemental watering can allow the long-term design to remain appropriate.

Root depth and soil storage

Roots obtain water where soil is moist, aerated, and physically accessible. Compaction, restrictive layers, and poor drainage can keep the effective root zone shallow even when the species can normally root deeper. Determine the practical root depth from site conditions rather than assign every tree a three-foot reservoir.

Available water is the difference between field-capacity and wilting-point water content over the effective root zone. If a soil stores an assumed 1.5 inches of available water per foot and effective roots extend one foot, total available water is 1.5 inches. At a selected fifty-percent allowable depletion, the refill trigger is 0.75 inch depleted. These are supplied design values, not universal settings for all soils and plants.

Coarse soil commonly stores less available water and may need smaller, more frequent applications. A fine soil may store more but accept water slowly, requiring cycle-soak to prevent runoff. Saturated fine soil can need less irrigation even when its surface looks dry. Check root-zone moisture rather than schedule from color alone.

Equipment and zone compatibility

Choose an application method suited to the plant and area. Sprinklers commonly serve turf; drip can target planting beds; micro-sprays may be appropriate where their distribution and maintenance fit. Narrow beds beside paving can be difficult to spray without overspray, while a groundcover mass may need broader wetting than a single emitter at every stem.

Keep materially different precipitation rates on separate schedules. A fixed spray applying roughly 1.5 inches per hour and a rotary device applying roughly 0.4 need different runtimes for the same depth. Those are illustrative rates; use the actual nozzle chart and field results. Sharing a valve would overwater one area or underwater the other unless the design specifically resolves the mismatch.

Also distinguish pressure needs. A drip product may require filtration and pressure regulation unlike nearby turf rotors. A regulated branch does not necessarily solve every scheduling conflict. Each zone should have a clear set of compatible devices and horticultural inputs that the owner can understand and maintain.

Practical layout decision

Suppose a yard contains sunny turf, shaded ferns, established oak planting, and new container trees. A single zone would impose one frequency on very different needs. A better plan separates turf application, the shade planting, the established dry-site area, and the new-tree establishment demand where necessary. The number of zones then must fit supply, controller capacity, and budget.

Do not add an extra zone solely for every plant name. Several compatible shrubs can share one bed zone when soils and exposure align. Conversely, one species on a hot shallow planter and in cool ground soil may need separate treatment. The goal is a coherent watering decision, not maximum valve count.

Explain the owner's future adjustments. As trees establish, reduce frequency when justified by observed moisture and rooting, while extending the wetted area. If a high-water plant is later added to a dry hydrozone, reassess rather than increase all watering and damage the original plants. Label the zone map by function and demand, not only “station one.”

Verify the design in operation

Observe wetting and drainage, confirm the equipment pressure and flow, and compare soil moisture across the zone. Catch cans evaluate sprinkler distribution; soil probing evaluates where water reaches roots. Both are needed because a uniform spray pattern can still exceed infiltration or miss a deep root requirement. Adjust the design or schedule from evidence and document the accepted settings.

Reference table

  • Condition Possible zoning consequence
  • Sunny turf versus shaded bed Different demand and application method
  • Coarse versus slow-infiltrating soil Different depth, interval, or cycling
  • New versus established plants Different effective roots and establishment checks
  • Dissimilar application rates Separate compatible schedules