Study guide
Irrigation site survey and available water
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Irrigation site survey and available water
Key Takeaways Explain This Topic AI
Record source flow and pressure together under relevant operating conditions.
Survey elevation, exposure, plants, soils, obstacles, and maintenance constraints.
Meter rating, service capacity, pipe velocity, and nozzle pressure are separate checks.
Last updated: October 2026
Begin with the landscape
An irrigation design starts with a measured base plan and the planting's water needs. Record beds, turf, trees, paving, buildings, slopes, retained plants, and areas that must stay dry. Identify wind exposure, shade, reflected heat, soil texture, restrictive layers, and infiltration behavior. Draw the property and use constraints rather than assume sprinklers can be placed anywhere along its perimeter.
Measure elevation differences from the proposed source to potential heads and assemblies. A thirty-foot vertical rise costs about thirteen psi of pressure before friction, using 0.433 psi per foot. A long horizontal run creates friction but not that elevation loss. Confusing distance and rise can either oversize the equipment or produce a zone that cannot operate.
Locate utilities and private infrastructure before routing trenches. Consider protected roots, foundations, septic systems, future construction, gate access, and traffic loads. Position valves, filters, controllers, and isolation devices where they can be serviced. A technically correct hydraulic layout can still be unbuildable or unsafe if it crosses a protected feature without an approved detail.
Identify the source
Determine whether water comes from a municipal service, well, pump, storage tank, reclaimed system, or another source. Record meter model and size, service material and diameter, pressure regulation, allowed flow, operating schedule, and any water restrictions. An unrestricted source is not an unlimited source. Well yield and pump capacity must both support the planned duty.
Check potable protection and authority requirements before connecting. An irrigation system with chemical addition or another water source changes the cross-connection assessment. Reclaimed water requires its own identification, permitted use, and separation. Do not connect two sources with a simple selector valve and assume a check valve makes the arrangement acceptable.
Review source reliability and concurrent demand. Domestic fixtures, other irrigation zones, pressure cycling, and seasonal supply changes can reduce available pressure. Design for the specified operating condition and record it. If the owner intends two zones to run simultaneously, the hydraulic analysis must include both rather than assume each operates alone.
Measure a flow-pressure relationship
Measure static pressure with no flow at the identified point. Then measure pressure while a known flow is drawn through the appropriate test arrangement. Use suitable gauges, flow measurement, and safe discharge. A bucket test computes flow from volume and time, but a wide-open hose test without working pressure does not establish the available flow at the nozzle's required pressure.
For example, filling five gallons in twenty seconds gives fifteen gpm: five divided by twenty times sixty. If the source pressure during that test is only twenty psi, the result cannot support a design that assumes fifteen gpm at forty psi. A different controlled test may show ten gpm at forty psi. Record both quantity and pressure instead of selecting the larger flow because it looks favorable.
The measurement location matters. A gauge downstream of the meter and backflow assembly already includes losses through those components at the test flow. Subtracting them again double counts. A reading upstream requires including them in the downstream budget. Sketch the source and test arrangement and label what the reported pressure represents.
Convert findings to design constraints
Set the allowable simultaneous flow using supplier limits, meter/service ratings, measured pressure, pump or well conditions, and required reserve. Then verify distribution piping and equipment losses at that flow. Do not use a universal fraction of meter capacity as a substitute for actual data. Some design references apply a conservative fraction of maximum ratings; the basis and equipment must be known.
Check pressure at the hydraulically controlling outlet, which may be distant, high, or both. Lower outlets may need regulation to avoid misting. A pump can require pressure controls or storage designed for its cycling behavior. Increasing pipe diameter reduces friction but does not correct an inadequate source yield or excessive elevation lift.
Document the survey
Create a concise design-data sheet with date, source, test point, static and working readings, measured flow, meter and service details, elevations, soils, planting needs, and uncertainty. Identify assumptions requiring confirmation before construction. A missing pipe diameter should appear as an unresolved design input rather than an invented value.
Share the constraints with the owner before proposing zones and costs. A limited supply may require more zones, longer available watering windows, lower-flow equipment, or a changed planting plan. Explain that slower application can suit a soil better but may increase runtime. Good survey information prevents purchasing equipment that cannot operate under the actual site's conditions.
Reference table
- Survey input Design use
- Working pressure and flow together Establish usable supply condition
- Source and test point Identify losses already included
- Elevations Calculate uphill loss and downhill gain
- Soil and plants Establish application and schedule needs
- Utilities and access Route buildable, serviceable systems