Irrigation symbols, plans, and material takeoffs
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Irrigation symbols, plans, and material takeoffs
Key Takeaways Explain This Topic AI
Read symbols from the project's legend and confirm the current revision.
Separate mainline, lateral, swing pipe, control wire, and drainage quantities.
Reconcile the plan, hydraulic schedule, controller stations, and installed record.
Last updated: October 2026
Read the complete drawing set
An irrigation plan can show sprinklers, emitters, valves, pipe routes, sleeves, controller, sensors, backflow protection, and source connection. Symbols vary by designer, so begin with the legend and equipment schedule. A dotted line may be wire on one drawing and a different pipe type on another. The legend, not a memorized convention, determines its meaning.
Confirm scale and revision before measuring. A reduced print or screen zoom can change a physical ruler's meaning. Use stated dimensions first and calibrate a scale measurement against a known distance. A plan-view length also may not include vertical risers, route changes around obstacles, or required service loops. Label assumptions in the takeoff.
Review details and specifications for pipe series, fittings, cover, joints, valve boxes, filters, pressure regulation, wire, sleeves, and testing. A nominal one-inch line is incomplete without its material and wall series. A controller symbol does not establish how many stations or what electrical supply is provided. Resolve missing information before ordering.
Count by system and segment
Separate the constantly pressurized mainline from valve-controlled laterals. Count swing connections and drip tubing independently because their materials, pressure ratings, and installation methods differ. Trace pipe sizes at reductions and branches; the number of feet in one size must correspond to the actual labeled segments.
Suppose a plan shows eighty feet of mainline, two laterals of sixty and forty feet, and seven heads requiring separate swing connections. The basic rigid-pipe takeoff is 180 feet before vertical allowances and purchasing waste, but it is not all one pipe category. Seven swing connections are counted separately. If a proposed route changes, revise both length and hydraulic loss rather than simply add leftover pipe.
Count fittings by actual junction: tees, elbows, reducers, couplings, threaded adapters, unions, caps, and isolation valves. Do not estimate all fittings as a universal ten-percent pipe allowance. A long straight line and a compact valve manifold can have the same pipe length with very different fitting counts. Allow maintenance disassembly where specified.
Valve and controller coordination
Create a valve schedule showing station number, served area, design flow, pressure requirement, valve type, regulation or filter, and pipe connection. Confirm each station on the drawing appears on the controller and vice versa. A spare station is capacity for expansion, not proof that the water supply can serve another simultaneous zone.
Route conventional station conductors and the common return according to the design, and include waterproof splice locations, service loops, and protection. One shared common conductor has a different count from one independent two-conductor home run per valve. Two-wire decoder systems require their own compatible cable, decoder, grounding, surge, and topology requirements. Do not apply a conventional wire count to them.
For a simple conventional system with six station wires and one common following the same route, the basic conductor count is seven, plus any specified spares. A 100-foot route represents 700 conductor-feet before slack if individual conductors are counted; a seven-conductor cable is purchased as cable length instead. Clarify the unit basis so the purchasing order is not multiplied twice.
Sleeves, crossings, and site constraints
Coordinate sleeves beneath paving before that paving is installed. Verify diameter, number, location, end protection, and access for future pulling or repair. A sleeve intended for irrigation pipe may not be approved for sharing with unrelated electrical service. Identify crossings and separation details with the relevant authorities.
Overlay the irrigation drawing with planting, drainage, lighting, and structural work. A valve box cannot sit where a stair footing will be excavated later. A head needs finished-grade information, while an assembly can need a specified height relative to downstream outlets. Make those relationships visible before separate crews build conflicting elements.
Field records and final reconciliation
Record installed departures with dimensions from stable features, photographs before backfill, pipe sizes, valve locations, and wire or decoder identities. Do not leave the owner only the original design when the route moved ten feet around a root. Update the quantity and commissioning records to reflect approved changes.
At completion compare installed heads and nozzles with the schedule, controller labels with valves, and total zone flows with the design. Confirm all isolation and maintenance access. A reconciled record supports troubleshooting, excavation protection, and future changes. The takeoff is therefore part of design verification and long-term operation, not merely a shopping list.
Reference table
- Takeoff category Keep separate because
- Mainline Continuous pressure and source routing
- Laterals Valve-controlled demand and branch sizing
- Swing pipe and drip tubing Different materials and connections
- Wire or decoder path Electrical system and purchasing units
- Sleeves and fittings Actual crossings and junction geometry