Study guide

Valve service, wiring, and smart controls

Oregon Landscape Contractor License Study Guide 2026

Track your progress as you read

Finished sections get a check mark.

1 1. Licensing and business: 1

Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility

2 2. Licensing and business: 2

Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens

3 3. Licensing and business: 3

LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing

4 4. Site safety and utilities

Excavation safety and hazard controls Oregon 811 notices and utility protection

5 5. Soil science and site preparation: 1

Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity

6 6. Soil science and site preparation: 2

Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds

7 7. Plants, turf, and establishment: 1

Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions

8 8. Plants, turf, and establishment: 2

Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth

9 9. Plants, turf, and establishment: 3

Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations

10 10. Plants, turf, and establishment: 4

Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials

11 11. Paving and concrete: 1

Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout

12 12. Paving and concrete: 2

Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing

13 13. Paving and concrete: 3

Concrete joints and curing

14 14. Walls and exterior structures: 1

Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings

15 15. Walls and exterior structures: 2

Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure

16 16. Walls and exterior structures: 3

Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions

17 17. Walls and exterior structures: 4

Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality

18 18. Design, grading, and drainage: 1

Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures

19 19. Design, grading, and drainage: 2

Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall

20 20. Design, grading, and drainage: 3

Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets

21 21. Design, grading, and drainage: 4

Bioretention sizing, media, and plants Swales and current DEQ erosion controls

22 22. Irrigation design and operation: 1

Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting

23 23. Irrigation design and operation: 2

Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage

24 24. Irrigation design and operation: 3

Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves

25 25. Irrigation design and operation: 4

Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions

26 26. Irrigation design and operation: 5

Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup

27 27. Backflow and potable protection: 1

Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies

28 28. Backflow and potable protection: 2

Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports

Valve service, wiring, and smart controls

Key Takeaways Explain This Topic AI

Provide isolation and access for valve maintenance.

Use approved buried splices and system-compatible wire.

Include both outgoing and common return in voltage-drop calculations.

Sensors and ET controls need representative installation and correct inputs.

Last updated: October 2026

Valve Features

Flow Control Stem: A manual threaded brass or plastic handle on top of the valve that physically limits the upward travel of the diaphragm. It is used to throttle downstream dynamic pressure, prevent valve chatter, and provide a 100% mechanical manual shutoff.

Internal vs. External Bleed:

Internal Bleed: Turning the solenoid 1/4-turn counterclockwise vents water internally into the downstream lateral, opening the valve manually without flooding the valve box.

External Bleed: A separate manual thumb-screw bleeds water directly out of the upper chamber into the valve box. Ideal for flushing sediment, sand, or construction grit out of the valve bonnet.

Scrubber / Dirty Water Valves: Specialty valves equipped with a stainless steel cleaning pin or rotating filter screen that mechanically clears the diaphragm bleed hole during every cycle, essential when pumping from ponds, rivers, or rural irrigation canals.

Valve Manifold Construction Standards

A professional valve manifold must incorporate:

Upstream Isolation Valve: A full-port brass or Schedule 80 PVC ball valve positioned immediately upstream of the manifold so technicians can service valves without shutting down the property's water supply.

Threaded Slip Unions: Every valve should feature a threaded union on its inlet and outlet to allow valve removal or diaphragm replacement in minutes without cutting PVC pipe.

Valve Box and Drainage Sump: Manifolds must be housed in heavy-duty rectangular valve boxes with locking lids set flush with lawn or mulch grade. The bottom must contain a 2- to 4-inch deep sump of washed 3/4" drain rock to facilitate drainage, exclude burrowing pests, and keep mud off components.

Low-Voltage Field Wiring, Connections, and Sizing

Irrigation control systems utilize Class 2 low-voltage AC circuitry (24VAC) to actuate valve solenoids from the timer.

Wiring materials and identification

Use outdoor/direct-burial or protected wiring approved for the controller system and installation. Irrigation cable and individual conductors have several listed forms; not every system requires cable designated UF. Follow the manufacturer's wire-size and distance table, local electrical requirements, and protection at crossings.

Conventional systems use station conductors and a common return. White common identification is a frequent convention, not a universal law for every system. Label actual functions and preserve records. Spares can support future repair where specified; their count is a design choice rather than a mandatory two-wire allowance.

Waterproof Splices

Underground valve boxes are humid, wet environments subject to seasonal flooding. Standard wire nuts wrapped in electrical tape will corrode rapidly from electrolysis, causing high electrical resistance and valve failure.

Warning

Use connectors listed and approved for the actual wet or direct-burial location, conductor combination, and electrical application. Follow preparation and sealing instructions. A generic indoor wire nut, loose tape, or an improvised seal is not adequate protection for an underground irrigation splice.

Conventional Multi-Conductor vs. Two-Wire Decoder Systems

Specification Conventional Multi-Conductor Wiring Two-Wire Decoder Systems

Wiring Architecture One dedicated hot wire per valve + one shared common wire Single 2-wire path (12 or 14 AWG twisted-pair) looping through all valves

Signal Transmission Direct 24VAC current sent over dedicated wire Bidirectional digital data signals + continuous AC power over the pair

Valve Actuation Controller energizes individual wire Controller sends digital address; decoders at valves respond and fire solenoid

Economic Crossover Cost-effective for systems up to 12–18 valves Highly economical for large commercial sites, parks, and golf courses (30–200+ valves)

Expansion Ease Requires trenching new wire back to controller Simply splice a new decoder into the existing two-wire path anywhere on the site

Wire sizing and voltage drop

Use the valve manufacturer's operating-voltage range, inrush current, holding current, and wire-sizing table. Conventional solenoid valves often use a nominal 24-VAC supply, but an assumed nineteen-volt minimum is not universal. Account for the outgoing conductor and common return, simultaneous valves, splice condition, and total length.

For an illustrative circuit, assume allowable drop 5 V and current 0.4 A. Maximum total loop resistance is 5 / 0.4 = 12.5 5/0.4=12.5 5/0.4 = 12.5 ohms. If the stated conductor resistance is 6.5 ohms per thousand feet, the two-wire loop is 13 ohms per thousand feet of one-way distance, so allowable one-way distance is 12.5 / 13 ( 1000 ) = 961.5 12.5/13(1000)=961.5 12.5/13 ( 1000 ) = 961.5 feet. Use the supplied resistance basis correctly; do not confuse loop resistance with single-conductor resistance. Actual design includes manufacturer guidance and temperature effects.

Smart Evapotranspiration (ET) Controllers & Conservation Sensors

Traditional electromechanical irrigation controllers operate on rigid calendar days and set runtimes regardless of rain or temperature. ET and moisture-based controls can improve scheduling when configured correctly.

Smart Evapotranspiration (ET) Controllers

Smart controllers calculate daily plant water demand by tracking Evapotranspiration (ET) —the combined loss of water from soil evaporation and plant transpiration: E T 0 = f ( Solar Radiation , Air Temperature , Relative Humidity , Wind Speed ) ET_0 = f(\text{Solar Radiation}, \text{Air Temperature}, \text{Relative Humidity}, \text{Wind Speed}) E T 0 ​ = f ( Solar Radiation , Air Temperature , Relative Humidity , Wind Speed )

Smart controllers gather data via on-site weather stations or cellular/Wi-Fi meteorological feeds, automatically scaling zone runtimes up during hot, windy periods and scaling them down during cool, overcast weather.

Sensors and applicable requirements

Rain, freeze, soil-moisture, and flow sensors can suspend or adapt watering and detect faults. Whether a particular sensor is required depends on the applicable building, water-conservation, local, and project requirements. Do not claim every new automatic irrigation system in Oregon is subject to one identical rain-sensor mandate.

Install the sensor in a representative location and verify controller compatibility. A rain sensor sheltered under an eave will not sense the lawn's rain; a moisture probe beside a drip emitter may read wet while much of the root zone is dry. Test the interruption function and explain any bypass switch to the owner. ET control requires accurate plant, soil, exposure, and sprinkler-rate inputs.