Study guide
Evapotranspiration, soil depletion, and runtime
Oregon Landscape Contractor License Study Guide 2026
Track your progress as you read
Finished sections get a check mark.
1 1. Licensing and business: 1
Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility
2 2. Licensing and business: 2
Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens
3 3. Licensing and business: 3
LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing
4 4. Site safety and utilities
Excavation safety and hazard controls Oregon 811 notices and utility protection
5 5. Soil science and site preparation: 1
Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity
6 6. Soil science and site preparation: 2
Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds
7 7. Plants, turf, and establishment: 1
Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions
8 8. Plants, turf, and establishment: 2
Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth
9 9. Plants, turf, and establishment: 3
Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations
10 10. Plants, turf, and establishment: 4
Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials
11 11. Paving and concrete: 1
Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout
12 12. Paving and concrete: 2
Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing
13 13. Paving and concrete: 3
Concrete joints and curing
14 14. Walls and exterior structures: 1
Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings
15 15. Walls and exterior structures: 2
Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure
16 16. Walls and exterior structures: 3
Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions
17 17. Walls and exterior structures: 4
Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality
18 18. Design, grading, and drainage: 1
Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures
19 19. Design, grading, and drainage: 2
Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall
20 20. Design, grading, and drainage: 3
Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets
21 21. Design, grading, and drainage: 4
Bioretention sizing, media, and plants Swales and current DEQ erosion controls
22 22. Irrigation design and operation: 1
Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting
23 23. Irrigation design and operation: 2
Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage
24 24. Irrigation design and operation: 3
Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves
25 25. Irrigation design and operation: 4
Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions
26 26. Irrigation design and operation: 5
Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup
27 27. Backflow and potable protection: 1
Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies
28 28. Backflow and potable protection: 2
Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports
Evapotranspiration, soil depletion, and runtime
Key Takeaways Explain This Topic AI
Reference ET is adjusted for the plant and effective rainfall before calculating irrigation need.
Convert net depth to gross applied depth only with an explicit efficiency assumption.
Divide total runtime into cycles when application exceeds infiltration, while preserving the required total depth.
Last updated: October 2026
Demand is a water balance
Evapotranspiration, or ET, combines evaporation and plant transpiration. Reference ET describes an assumed reference surface under the weather conditions; a plant or landscape factor adjusts it for the selected vegetation. The factor and method must match the reference data and plant assumptions. Do not apply a turf coefficient to a sparse shrub planting without review.
Effective rainfall is the portion retained where roots can use it. Rain that runs off, drains below the roots, or falls after the soil reservoir is full does not all replace irrigation demand. A rain gauge measures depth but not effective storage. Soil observation and the scheduling method determine the useful contribution.
For a supplied weekly reference ET of 1.40 inches and a plant factor of 0.70, estimated plant ET is 0.98 inch. If effective rain is 0.28 inch and the soil-water accounting calls for full replacement over that period, net irrigation need is 0.70 inch. The factor is an example, not a universal Oregon lawn coefficient. Do not subtract the rain before applying the plant factor unless the particular method specifies that operation.
Storage determines interval
Available water depends on soil and effective root depth. Suppose the root zone holds 1.2 inches of available water and the selected management allowable depletion is fifty percent. The refill trigger is 0.60 inch depleted. With estimated use of 0.15 inch per day and no effective rain, that threshold is reached in four days. A smaller root zone would reach it sooner.
Do not let the depletion calculation become a rigid calendar rule. Forecast rain, seasonal demand, root stress, and observed moisture can justify adjustment. New stock can have a smaller root reservoir than established plants, while a compacted layer can reduce the actual depth. The schedule must use the root zone that exists, not the one hoped for in a plant description.
Overwatering after every small rain can fill the reservoir and create runoff or deep drainage. Track the balance rather than irrigate simply because the controller's weekday arrived. Soil-moisture sensors and ET controllers can support this decision only when correctly installed and configured.
Net depth, gross depth, and runtime
Net depth is the water intended to remain available in the root zone. Gross depth is what the system applies when the chosen efficiency assumption accounts for losses. If net need is 0.60 inch and assumed application efficiency is 0.80, gross depth is 0.60 divided by 0.80, or 0.75 inch. Multiplying by 0.80 would understate the required application.
At measured precipitation rate 1.5 inches per hour, 0.75 inch requires half an hour, or thirty minutes. The formula is runtime in minutes equals depth divided by precipitation rate times sixty. Use inches with inches per hour, or millimeters with millimeters per hour. Gallons delivered to one tree cannot be inserted directly into a depth equation without a wetted-area conversion.
Distribution uniformity can require a different scheduling approach to ensure the drier portion receives enough water. Do not blindly divide by both an efficiency and a uniformity value if the adopted method already combines the same losses. Identify the method and assumptions, then verify that extra runtime is not causing runoff in the wetter areas. Repair poor distribution before compensating with unlimited time.
Cycle and soak
If thirty minutes is the required total runtime but runoff begins after ten continuous minutes, divide the application into three ten-minute cycles with enough soak time between them. The total remains thirty minutes. Three thirty-minute cycles would triple the intended depth. Soak duration depends on infiltration, slope, soil, and equipment; it is not a universal twenty-minute interval.
The controller may interleave other zones during soak time. Check that the watering window and source constraints support the complete sequence. Several start times can accidentally repeat an entire program, so verify the controller's programming model. Use a rain or soil-moisture interruption correctly and explain manual overrides.
Verify and adjust
Inspect the wetted depth, plant condition, runoff, and meter or flow readings after scheduling. A calculated thirty-minute runtime with a clogged head does not produce the intended distribution. Recheck nozzle type and pressure after repairs, because precipitation can change. Reduce demand assumptions and runtime seasonally where warranted rather than leave the hottest-week program year round.
Record ET source, plant factor, effective rainfall, root storage, allowable depletion, precipitation, and any efficiency adjustment. This makes a schedule reviewable and lets a technician explain why it changed. A smart controller still needs correct inputs and maintenance; automation cannot infer every soil, plant, or equipment defect.
Reference table
- Supplied example step Calculation Result
- Gross depth 0.60 / 0.80 0.75 inch
- Runtime hours 0.75 / 1.5 0.5 hour
- Runtime minutes 0.5 × 60 30 minutes
- Three cycles 30 / 3 10 minutes each, with suitable soak