Backflow installation, winter care, and reports

Oregon Landscape Contractor License Study Guide 2026

Track your progress as you read

Finished sections get a check mark.

1 1. Licensing and business: 1

Exam structure, reference use, and license routes Oregon jurisdiction, license phases, and eligibility Bonds, insurance, and financial responsibility

2 2. Licensing and business: 2

Employee status, paid work, and payroll calculations Hiring, breaks, sick time, and workplace protections Contracts, cancellation, guarantees, and liens

3 3. Licensing and business: 3

LCP supervision and clear project communication Direct costs and overhead allocation Margin, markup, changes, and job costing

4 4. Site safety and utilities

Excavation safety and hazard controls Oregon 811 notices and utility protection

5 5. Soil science and site preparation: 1

Soil texture, structure, and pore space Density, regional profiles, and soil water Soil pH, diagnosis, and exchange capacity

6 6. Soil science and site preparation: 2

Amendments and fertilizer calculations Compaction, decompaction, and topsoil protection Topsoil placement, finish grades, and weeds

7 7. Plants, turf, and establishment: 1

Planting plans, stock sizes, and quantity takeoffs Botanical identification, plant types, and growth habits Mature size, landscape use, and exposure decisions

8 8. Plants, turf, and establishment: 2

Hardiness, microclimates, and plant names Native plant choices and invasive plants Nursery stock, root flares, and planting depth

9 9. Plants, turf, and establishment: 3

Backfill, staking, and mulch Turf species, mixtures, and site suitability Seed, sod, and establishment calculations

10 10. Plants, turf, and establishment: 4

Pruning and integrated pest management Pest diagnosis, weeds, and pesticide credentials

11 11. Paving and concrete: 1

Pavement foundations, drainage, and excavation Separation fabric, aggregate, and compaction Bedding, restraints, and square layout

12 12. Paving and concrete: 2

Paver laying, cuts, patterns, and joint fill Natural stone and rigid or flexible setting Concrete mixture, placement, and finishing

13 13. Paving and concrete: 3

Concrete joints and curing

14 14. Walls and exterior structures: 1

Segmental wall systems and foundations Wall drainage, backfill, and geogrid Earth pressure, stone walls, and footings

15 15. Walls and exterior structures: 2

Masonry reinforcement, wall permits, and failure Lumber dimensions, grades, fasteners, and finishing Treated lumber and outdoor exposure

16 16. Walls and exterior structures: 3

Wood durability, hardware, and post geometry Fences, decks, ledgers, and arbors Landscape steps, stairs, and safe transitions

17 17. Walls and exterior structures: 4

Low-voltage lighting design, wiring, and commissioning Water features, pumps, liners, and water quality

18 18. Design, grading, and drainage: 1

Landscape design, circulation, and coordinated details Surveying, benchmarks, and elevation checks Planting on roofs, decks, and other structures

19 19. Design, grading, and drainage: 2

Drawing sets, legends, and scale Contours, spot elevations, and benchmarks Slope ratios, pitch, and foundation fall

20 20. Design, grading, and drainage: 3

Earthwork, accessible routes, and swales Water sources and French drains Inlets, conveyance, cleanouts, and outlets

21 21. Design, grading, and drainage: 4

Bioretention sizing, media, and plants Swales and current DEQ erosion controls

22 22. Irrigation design and operation: 1

Irrigation site survey and available water Hydrozones and plant-based irrigation design Sprinkler layout, arcs, and zone flow accounting

23 23. Irrigation design and operation: 2

Irrigation symbols, plans, and material takeoffs Pressure, elevation, friction, and budgets Sprinkler types, pressure, and coverage

24 24. Irrigation design and operation: 3

Matched precipitation and runtime formulas Drip irrigation, filtration, and wetted root volume Pipe materials, bore, velocity, and valves

25 25. Irrigation design and operation: 4

Valve service, wiring, and smart controls Controller circuits and electrical troubleshooting Plant culture and root-zone watering decisions

26 26. Irrigation design and operation: 5

Evapotranspiration, soil depletion, and runtime Catch-can audits and irrigation repair diagnosis Installation, testing, winterization, and startup

27 27. Backflow and potable protection: 1

Cross-connections, hazards, and reverse flow Air gaps and physical potable-water separation Vacuum breakers, checks, and RP assemblies

28 28. Backflow and potable protection: 2

Potable, irrigation, and reclaimed-water piping Backflow assembly selection and hydraulic cases Backflow installation, winter care, and reports

Backflow installation, winter care, and reports

Key Takeaways Explain This Topic AI

Use current Oregon rules, approved orientation, and accessible clearances.

Freeze protection follows actual climate and product instructions.

Qualified testing follows installation, repair, relocation, and annual requirements.

Test reports must be provided within ten working days.

Last updated: October 2026

Note

Backflow installation must satisfy applicable plumbing rules, OHA installation requirements, the listed model, and local authority instructions. OHA rules and water-supplier programs also govern qualified testing, reporting, and enforcement. Installers and testers have distinct qualifications.

Installation review and access

Use OAR 333-061-0071, the applicable OPSC, the water supplier's requirements, and the approved model's installation instructions. Oregon requires access for operation, maintenance, inspection, and in-line testing. Its diagrams and approved installation standards establish clearances; do not invent a universal twelve-inch side/six-inch rear/forty-eight-inch maximum schedule for every assembly.

RP relief valves must be protected from any submersion, with approved air-gap drainage. DC assemblies can be below grade in an adequately drained vault, with watertight caps or plugs on test cocks and no continuous immersion. A vault drain must not connect directly to a sanitary or storm drain. The five-foot height/platform rule applies to RP and DC installations; approved reduced clearances for assemblies with pipes two inches or smaller require authority approval and accessible servicing.

PVB and SVB assemblies must stand twelve inches above the highest downstream piping and outlets. AVBs require six inches. Check the highest actual point, including raised beds and uphill piping, rather than only the head beside the assembly. New grading can change compliance. Verify approved orientation on OHA's assembly list because a similar-looking model can have different approval conditions. Current Oregon drinking-water rules .

Freeze protection and seasonal drainage

Freeze protection depends on climate, exposure, operation, and product instructions. Insulation delays freezing but does not create heat. A heated enclosure must provide the required access, ventilation, drainage, and safe electrical installation. Do not declare one enclosure class mandatory for every eastern Oregon property.

For seasonal shutdown, isolate and drain according to the assembly manufacturer. Some ball valves and test cocks use a partially open storage position to release trapped water; that is product-specific procedure, not a universal forty-five-degree mandate for all equipment. A removable assembly can be drained and stored when the installation permits that approach. Never blow irrigation compressor air through the assembly; isolate it and use the downstream irrigation connection. Restore it correctly and obtain required testing before return to service.

Licensing Boundaries: Landscape Contractor (LCP) vs. Licensed Plumber

Understanding the statutory boundary between Oregon Landscape Contractors Board (LCB) licensing and Oregon Building Codes Division (BCD) plumbing licensing is critical for legal compliance:

Potable Water Service Tap & Meter: Tapping into a municipal potable water main, setting a water meter, and running the primary domestic service lateral to a commercial or residential structure falls strictly under the jurisdiction of a licensed plumbing contractor under ORS Chapter 693 and the OPSC.

Landscape Irrigation Scope: Under ORS 671.520 and OAR Chapter 808, an Oregon licensed Landscape Contracting Business with an individual Landscape Construction Professional (LCP) holding the All Phase or Irrigation Only phase is legally authorized to install, alter, and repair landscape irrigation systems. This statutory authority includes physically mounting, piping, and connecting approved backflow prevention assemblies to the irrigation mainline downstream of the potable service tap.

Interior Building Connections: If an irrigation water source originates inside a residential basement, crawlspace, or commercial mechanical room, the initial pipe penetration, isolation shutoff, and potable tie-in must be performed by a licensed plumbing contractor under a local plumbing permit. Once the piping exits the building foundation to grade, the landscape contractor may proceed with exterior irrigation installation.

Testing qualifications, triggers, and reporting

Oregon's water suppliers enforce cross-connection programs and required testing. Assemblies are tested at installation, after repair or relocation, and at least annually, with additional tests where required. The tester must meet OAR 333-061-0072: this includes Authority-certified testers and the specified qualifying journeyman or apprentice plumber pathways. A plumbing or LCP license by itself is not a blanket tester authorization.

Use approved procedures and calibrated equipment. Record the assembly's make, model, size, serial number, location, test results, repair, and final passing result. Test reports go to the water user, water supplier, and tester's permanent records and must be provided within ten working days in the supplier's accepted form. An unexplained annual “certification sticker” is not a substitute for the test report.

When an assembly fails, follow the water supplier's corrective instructions and deadline, repair appropriately, and retest. Suppliers can discontinue service under their cross-connection enforcement requirements, but do not invent a universal ten-to-thirty-day grace period. Keep the system isolated when required until protection is restored.