Study guide
15.1 Sewer Rehabilitation, Trenchless Renewal and New-Pipe Acceptance Testing
Oregon Water and Wastewater Operator Certification Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Oregon Operator Programs and DEQ Wastewater Certification
1.1 Dual-Agency Structure: DEQ Wastewater and OHA Drinking Water Programs 1.2 DEQ Wastewater System Classification and Supervision Rules 1.3 DEQ Certificates: Qualifications, OIT, Provisional Path, Exams and Fees
2 Chapter 2: OHA Drinking Water Certification and Certificate Renewal
2.1 OHA System Classification, Direct Responsible Charge and the Filtration Endorsement 2.2 OHA Certificates: Experience Tables, OIT, Exams, Fees and Small Water System Certification 2.3 Renewal, CEUs, Reinstatement, Reciprocity and Discipline for DEQ and OHA Certificates
3 Chapter 3: Federal Rules, Oregon Water Quality Standards and Cyanotoxins
3.1 Clean Water Act, Safe Drinking Water Act & NPDES Permitting 3.2 Willamette Basin TMDL and Oregon Water Quality Standards 3.3 Harmful Algal Blooms (HABs) & Oregon Cyanotoxin Rules (OAR 333-061-0510)
4 Chapter 4: Source Water, Intakes and Wells
4.1 Raw Water Sources, Intake Structures & Pretreatment 4.2 Groundwater Sources and Wells: Hydraulics, Construction and Protection
5 Chapter 5: Coagulation, Clarification and Filtration
5.1 Coagulation, Flocculation & Jar Testing Dynamics 5.2 Sedimentation, Clarification & Media Filtration Systems 5.3 Slow Sand, Diatomaceous Earth, Cartridge and Membrane Filtration
6 Chapter 6: Drinking Water Disinfection
6.1 Disinfection Chemistry, Chlorination Dynamics & CT Calculations 6.2 UV, Ozone, Chlorine Dioxide, Chloramines and Disinfection Byproduct Control
7 Chapter 7: Specialty Water Treatment and Residuals
7.1 Iron and Manganese Removal, Softening, and Taste and Odor Control 7.2 Corrosion Control, Lead and Copper, and Fluoridation 7.3 Water Treatment Residuals: Sludge, Backwash Water and Membrane Concentrate
8 Chapter 8: Distribution System Infrastructure
8.1 Distribution System Hydraulics, Piping Materials & Storage Facilities 8.2 Valves, Fire Hydrants & Water Main Installation / Disinfection 8.3 Service Connections, Meters, Water Loss Control and Utility Locating
9 Chapter 9: Distribution Operations, Cross-Connection Control and Water Quality
9.1 Storage Tank and Booster Pump Station Operation, Inspection and Disinfection 9.2 Cross-Connection Control & Backflow Prevention Assemblies (OAR 333-061-0070) 9.3 Water Quality in Distribution: Water Age, Nitrification & Flushing Programs
10 Chapter 10: Wastewater Preliminary and Primary Treatment and Lagoons
10.1 Preliminary Treatment: Screening, Grit Removal & Flow Measurement 10.2 Primary Clarification & Sedimentation Hydraulics 10.3 Stabilization Ponds and Aerated Lagoons
11 Chapter 11: Biological Wastewater Treatment
11.1 Secondary Treatment: Activated Sludge Process Control & Variations 11.2 Fixed-Film Treatment: Trickling Filters, RBCs, MBBR and IFAS 11.3 Biological Nutrient Removal: Nitrification, Denitrification & Phosphorus Removal
12 Chapter 12: Tertiary Treatment, Disinfection, Recycled Water and Small Systems
12.1 Tertiary Filtration, Membrane Bioreactors and Oregon Recycled Water Classes 12.2 Wastewater Disinfection and Dechlorination 12.3 Small Wastewater Systems, Septage Handling and Odor Control
13 Chapter 13: Solids Handling and Biosolids
13.1 Sludge Thickening, Conditioning & Dewatering Technologies 13.2 Anaerobic and Aerobic Digestion Operations & Control 13.3 Biosolids Quality, Land Application Rules & OAR 340-050 / 40 CFR 503
14 Chapter 14: Wastewater Collection Systems and Pumping
14.1 Gravity Sewer Design, Manholes & Inflow/Infiltration (I/I) Management 14.2 Lift Station Design, Wet Wells & Submersible / Centrifugal Pumps 14.3 Collection System Maintenance, Pipeline Inspection (CCTV) & Trench Safety
15 Chapter 15: Collection System Rehabilitation and Overflow Control
15.1 Sewer Rehabilitation, Trenchless Renewal and New-Pipe Acceptance Testing 15.2 Overflow Response, Bypass Pumping, CMOM Programs and Sewer Sulfide Control
16 Chapter 16: Laboratory Procedures and Water Quality Testing
16.1 Drinking Water Microbiological Testing: Coliform, E. coli & RTCR 16.2 Wastewater Lab Analysis: BOD5, TSS, COD & Volatile Solids 16.3 Wastewater Lab: Nutrients, Alkalinity, Bacteria, Toxicity Testing and Lab Accreditation 16.4 Process Monitoring: pH, Turbidity, Dissolved Oxygen & Chlorine Residuals 16.5 Sampling Protocols, Quality Assurance / Chain of Custody & Reporting
17 Chapter 17: Equipment, Electrical Systems and Maintenance
17.1 Pumps, Blowers and Mechanical Maintenance Programs 17.2 Electrical Systems, Motors, Generators, Instrumentation and SCADA
18 Chapter 18: Applied Water and Wastewater Mathematics
18.1 Dimensional Analysis, Flow Conversions & Detention Time 18.2 Chemical Feed, Dosage Calculations & the Pounds Formula 18.3 Treatment Plant Hydraulics, Loading Rates (SOR, WOR) & Pumping Horsepower
19 Chapter 19: Utility Safety
19.1 OSHA Standards, Confined Space Entry & Hazardous Chemical Safety 19.2 Field Safety: Electrical Hazards, Fall Protection, Work Zones, PPE and Oregon OSHA Rules
20 Chapter 20: Emergency Preparedness, Security and Utility Management
20.1 Cascadia Subduction Zone (CSZ) Seismic Preparedness & Infrastructure Hardening 20.2 Wildfire Impacts on Watersheds, Post-Fire Water Quality & Emergency Operations 20.3 Security, Cybersecurity, Emergency Response Planning and Utility Management
15.1 Sewer Rehabilitation, Trenchless Renewal and New-Pipe Acceptance Testing
Key Takeaways Explain This Topic AI
Rehabilitation choices follow condition grades from CCTV inspection and the cost of the consequences of failure, not just pipe age.
Cured-in-place pipe (CIPP) inverts a resin-saturated liner into the host pipe and cures it with hot water, steam or UV light; laterals are then reopened with a robotic cutter.
Pipe bursting pulls a new HDPE pipe through the old one, breaking it outward, and can upsize capacity; sliplining inserts a smaller pipe and grouts the annulus.
Low-pressure air testing of new gravity sewers times a 1.0 psi drop (from 3.5 to 2.5 psig, adjusted for groundwater), and vacuum testing of manholes times the drop from 10 to 9 inches of mercury.
Before cutting roots or obstructions in a sewer, check for cross bores: gas lines accidentally bored through the sewer can be ruptured by cutters.
Last updated: October 2026
From Inspection to Decision
CCTV inspection coded to NASSCO PACP gives each pipe segment structural and operation-and-maintenance grades from 1 (minor) to 5 (failure imminent or occurring). Utilities combine those grades with the consequence of failure to rank work. Consequence factors include pipe depth and size, traffic, nearby waterways and critical customers. Typical outcomes:
- Condition Typical response
- Roots, grease, debris only Cleaning, root control, FOG enforcement
- Isolated joint leaks or a single defect Spot repair or chemical grouting
- Widespread cracks or leaking joints with the pipe still round Full-length lining (CIPP)
- Undersized pipe or severe deformation Pipe bursting (upsizing) or open-cut replacement
- Collapse or loss of grade (sags) Open-cut replacement
- Trenchless Rehabilitation Methods
Cured-in-place pipe (CIPP). A felt or fiberglass tube saturated with resin (polyester, vinyl ester or epoxy) is inverted into the host pipe with water or air pressure, or pulled in. It is then cured with hot water, steam or UV light , creating a tight-fitting new pipe inside the old one.
Cleaning and CCTV beforehand are critical; roots and protruding taps must be removed.
After curing, a robotic cutter reinstates service laterals from inside the main.
Some resins release styrene during curing. Manage odors and vapors in buildings, and watch confined-space atmospheres.
Pipe bursting. A bursting head is pulled or pushed through the old pipe, fracturing it outward, while a new pipe (usually fusion-welded HDPE) follows behind. It can increase diameter and is good for brittle clay or cast iron. Watch for nearby utilities and for heave or settlement near shallow lines.
Sliplining. A smaller new pipe is inserted into the host and the annular space is grouted. It is simple, but it loses some diameter.
Fold-and-form and close-fit liners. These are thermoplastic pipes folded for insertion, then expanded with heat and pressure.
Spot repairs and grouting. Short sectional liners fix single defects. Chemical grout (acrylamide, acrylate or urethane) is injected at leaking joints using a packer and sealed after an air test of the joint. Grouting controls infiltration but does not add structural strength.
Lateral rehabilitation. Lateral-main connection liners (top hats) and lateral lining seal one of the largest infiltration sources. Private laterals often need a cost-sharing or ordinance-based program.
Manhole Rehabilitation
Chimney seals (internal or external rubber sleeves) stop infiltration between the frame and cone.
Inflow dishes under lids and raised frames keep street runoff out.
Cementitious or epoxy liners restore walls attacked by hydrogen sulfide corrosion.
Grout leaking pipe penetrations and rebuild benches and inverts .
Cross-Bore Safety
A cross bore happens when a gas line or other utility installed by horizontal directional drilling passes through a sewer main or lateral. A root cutter or rodder can rupture the gas line, causing explosions inside buildings. Before cutting a blockage, especially in a lateral, check CCTV records and known cross-bore locations. If a sewer backup is near a newer gas service installed by boring, stop and call the gas utility first.
Acceptance Testing of New Sewers and Manholes
Test Procedure (summary) Purpose
Low-pressure air test (ASTM F1417 for plastic, C828 for clay) Plug the section, pressurize to about 4 psig and let it stabilize, then time the drop from 3.5 to 2.5 psig ; compare with minimum times for the diameter and length. Raise test pressures by the groundwater backpressure above the pipe (0.433 psi per ft). Finds leaking joints and damaged pipe
Deflection (mandrel) test Pull a go/no-go mandrel through flexible pipe, commonly sized for 5 percent deflection, after backfill has settled (often 30 days) Confirms bedding and haunching held the pipe round
Manhole vacuum test (ASTM C1244) Seal the manhole, draw 10 inches of mercury , and time the drop to 9 inches against the specified minimum Finds leaks in joints, pipe connections and walls
CCTV final inspection Video the new line before acceptance Confirms grade (no sags), joints and service connections
Hydrostatic test (force mains) Hold test pressure for a set time and measure makeup water Pressure pipe leakage
Safety during air testing: never stand in front of plugs while pressurized, and use pressure relief devices. A plug blown out at a few psi on a large pipe carries enormous force.
Measuring Results
I/I programs should measure flow before and after rehabilitation, using temporary flow meters and rainfall data, to show results. Rehabilitating public mains alone often removes less infiltration than expected, because water migrates to unrehabilitated laterals. That is why whole-basin approaches including laterals often perform best.
Worked Example: Adjusting an Air Test for Groundwater
Groundwater stands 4.6 feet above the top of a new sewer.
Backpressure = 4.6 ft × 0.433 psi/ft ≈ 2.0 psi
Instead of timing the drop from 3.5 to 2.5 psig, time the drop from 5.5 to 4.5 psig .
Without the adjustment, groundwater pushing in through a leaking joint would offset the air leaking out and hide the defect. Check the project specification for any maximum test pressure, and plug and brace laterals before the test. Plugs under pressure can blow out with enough force to injure workers, so nobody enters a manhole while a line is pressurized.