15.2 Overflow Response, Bypass Pumping, CMOM Programs and Sewer Sulfide Control

Oregon Water and Wastewater Operator Certification Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Oregon Operator Programs and DEQ Wastewater Certification

1.1 Dual-Agency Structure: DEQ Wastewater and OHA Drinking Water Programs 1.2 DEQ Wastewater System Classification and Supervision Rules 1.3 DEQ Certificates: Qualifications, OIT, Provisional Path, Exams and Fees

2 Chapter 2: OHA Drinking Water Certification and Certificate Renewal

2.1 OHA System Classification, Direct Responsible Charge and the Filtration Endorsement 2.2 OHA Certificates: Experience Tables, OIT, Exams, Fees and Small Water System Certification 2.3 Renewal, CEUs, Reinstatement, Reciprocity and Discipline for DEQ and OHA Certificates

3 Chapter 3: Federal Rules, Oregon Water Quality Standards and Cyanotoxins

3.1 Clean Water Act, Safe Drinking Water Act & NPDES Permitting 3.2 Willamette Basin TMDL and Oregon Water Quality Standards 3.3 Harmful Algal Blooms (HABs) & Oregon Cyanotoxin Rules (OAR 333-061-0510)

4 Chapter 4: Source Water, Intakes and Wells

4.1 Raw Water Sources, Intake Structures & Pretreatment 4.2 Groundwater Sources and Wells: Hydraulics, Construction and Protection

5 Chapter 5: Coagulation, Clarification and Filtration

5.1 Coagulation, Flocculation & Jar Testing Dynamics 5.2 Sedimentation, Clarification & Media Filtration Systems 5.3 Slow Sand, Diatomaceous Earth, Cartridge and Membrane Filtration

6 Chapter 6: Drinking Water Disinfection

6.1 Disinfection Chemistry, Chlorination Dynamics & CT Calculations 6.2 UV, Ozone, Chlorine Dioxide, Chloramines and Disinfection Byproduct Control

7 Chapter 7: Specialty Water Treatment and Residuals

7.1 Iron and Manganese Removal, Softening, and Taste and Odor Control 7.2 Corrosion Control, Lead and Copper, and Fluoridation 7.3 Water Treatment Residuals: Sludge, Backwash Water and Membrane Concentrate

8 Chapter 8: Distribution System Infrastructure

8.1 Distribution System Hydraulics, Piping Materials & Storage Facilities 8.2 Valves, Fire Hydrants & Water Main Installation / Disinfection 8.3 Service Connections, Meters, Water Loss Control and Utility Locating

9 Chapter 9: Distribution Operations, Cross-Connection Control and Water Quality

9.1 Storage Tank and Booster Pump Station Operation, Inspection and Disinfection 9.2 Cross-Connection Control & Backflow Prevention Assemblies (OAR 333-061-0070) 9.3 Water Quality in Distribution: Water Age, Nitrification & Flushing Programs

10 Chapter 10: Wastewater Preliminary and Primary Treatment and Lagoons

10.1 Preliminary Treatment: Screening, Grit Removal & Flow Measurement 10.2 Primary Clarification & Sedimentation Hydraulics 10.3 Stabilization Ponds and Aerated Lagoons

11 Chapter 11: Biological Wastewater Treatment

11.1 Secondary Treatment: Activated Sludge Process Control & Variations 11.2 Fixed-Film Treatment: Trickling Filters, RBCs, MBBR and IFAS 11.3 Biological Nutrient Removal: Nitrification, Denitrification & Phosphorus Removal

12 Chapter 12: Tertiary Treatment, Disinfection, Recycled Water and Small Systems

12.1 Tertiary Filtration, Membrane Bioreactors and Oregon Recycled Water Classes 12.2 Wastewater Disinfection and Dechlorination 12.3 Small Wastewater Systems, Septage Handling and Odor Control

13 Chapter 13: Solids Handling and Biosolids

13.1 Sludge Thickening, Conditioning & Dewatering Technologies 13.2 Anaerobic and Aerobic Digestion Operations & Control 13.3 Biosolids Quality, Land Application Rules & OAR 340-050 / 40 CFR 503

14 Chapter 14: Wastewater Collection Systems and Pumping

14.1 Gravity Sewer Design, Manholes & Inflow/Infiltration (I/I) Management 14.2 Lift Station Design, Wet Wells & Submersible / Centrifugal Pumps 14.3 Collection System Maintenance, Pipeline Inspection (CCTV) & Trench Safety

15 Chapter 15: Collection System Rehabilitation and Overflow Control

15.1 Sewer Rehabilitation, Trenchless Renewal and New-Pipe Acceptance Testing 15.2 Overflow Response, Bypass Pumping, CMOM Programs and Sewer Sulfide Control

16 Chapter 16: Laboratory Procedures and Water Quality Testing

16.1 Drinking Water Microbiological Testing: Coliform, E. coli & RTCR 16.2 Wastewater Lab Analysis: BOD5, TSS, COD & Volatile Solids 16.3 Wastewater Lab: Nutrients, Alkalinity, Bacteria, Toxicity Testing and Lab Accreditation 16.4 Process Monitoring: pH, Turbidity, Dissolved Oxygen & Chlorine Residuals 16.5 Sampling Protocols, Quality Assurance / Chain of Custody & Reporting

17 Chapter 17: Equipment, Electrical Systems and Maintenance

17.1 Pumps, Blowers and Mechanical Maintenance Programs 17.2 Electrical Systems, Motors, Generators, Instrumentation and SCADA

18 Chapter 18: Applied Water and Wastewater Mathematics

18.1 Dimensional Analysis, Flow Conversions & Detention Time 18.2 Chemical Feed, Dosage Calculations & the Pounds Formula 18.3 Treatment Plant Hydraulics, Loading Rates (SOR, WOR) & Pumping Horsepower

19 Chapter 19: Utility Safety

19.1 OSHA Standards, Confined Space Entry & Hazardous Chemical Safety 19.2 Field Safety: Electrical Hazards, Fall Protection, Work Zones, PPE and Oregon OSHA Rules

20 Chapter 20: Emergency Preparedness, Security and Utility Management

20.1 Cascadia Subduction Zone (CSZ) Seismic Preparedness & Infrastructure Hardening 20.2 Wildfire Impacts on Watersheds, Post-Fire Water Quality & Emergency Operations 20.3 Security, Cybersecurity, Emergency Response Planning and Utility Management

15.2 Overflow Response, Bypass Pumping, CMOM Programs and Sewer Sulfide Control

Key Takeaways Explain This Topic AI

Under standard Oregon NPDES conditions, noncompliance that may endanger health or the environment, including overflows, is reported orally within 24 hours: to the DEQ regional office during business hours or to OERS at 1-800-452-0311 after hours, with a written submission within 5 days.

An overflow response stops the source, contains and recovers sewage, protects the public with signs, cleans and disinfects the area, samples when required, and documents volume, duration and cause.

Emergency bypass pumping needs pumps sized for peak flow with standby units, reliable plugs, secure hose routing and continuous monitoring.

CMOM programs cover legal authority, operation and maintenance, capacity assessment, overflow emergency response planning and regular audits.

Sulfide forms in anaerobic slime layers, especially in long force mains; control it with oxygen or nitrate, iron salts, pH elevation or oxidants, and resist crown corrosion with liners.

Last updated: October 2026

Reporting an Overflow in Oregon

Overflow reporting duties come from the permit. Oregon's standard NPDES general conditions require 24-hour reporting of any noncompliance that may endanger health or the environment. Information is given orally within 24 hours of becoming aware of it: call the DEQ regional office during business hours , or the Oregon Emergency Response System (OERS) at 1-800-452-0311 outside business hours. A written submission within 5 days describes:

  • the noncompliance and its cause;
  • the exact dates and times, and whether it is continuing;

steps taken or planned to reduce, eliminate and prevent recurrence.

Individual permits may add overflow-specific requirements, such as public notification, signs, sampling or monthly summaries with the DMR. Know your permit's wording.

Field Response Sequence

Safety first : traffic control, gas monitoring at open manholes, PPE.

Stop the source : clear the blockage, restart or bypass the pump station, or isolate the broken main.

Contain : sandbags, berms, plugging storm drains, vacuum trucks.

Estimate volume : duration × estimated flow rate, the count-the-manholes method, or upstream flow data. Photograph everything.

Protect the public : post warning signs at affected waters and properties, and notify downstream water suppliers if an intake could be affected.

Clean up : recover solids and liquid, wash down hard surfaces back to the sewer, and apply lime or disinfectant to soil where appropriate.

Sample receiving water when required (upstream, at and downstream of the discharge) until bacteria return to background.

Document and report : start and stop times, volume, cause, receiving water, actions and corrective measures.

Emergency Bypass Pumping

Bypass pumping moves flow around a failed pipe, a pump station under repair, or a rehabilitation work zone.

Size pumps for peak wet-weather flow , not average flow, and provide a standby pump ready to start automatically or immediately.

Use reliable plugs (inflatable or mechanical) with backup, and secure hoses and fittings. Discharge hoses at road crossings need ramps or buried crossings.

Monitor continuously: levels upstream, fuel, pump operation and hose integrity. Night failures cause many overflows.

Plan the shutdown sequence so the plugs are removed without surging the downstream system.

CMOM: Capacity, Management, Operation and Maintenance

EPA's CMOM framework organizes a collection system program into:

  • Element Contents
  • Goals and organization Clear goals, staff roles, chain of communication during emergencies

Legal authority Sewer use ordinance: prohibited discharges, FOG and pretreatment requirements, inflow and lateral rules, enforcement

Operation and maintenance program Cleaning schedules, inspection (CCTV, manholes), pump station O&M, root and FOG control, equipment and parts inventory

  • Design and performance standards Standards for new and rehabilitated sewers and their inspection and testing
  • Capacity assessment and assurance Flow monitoring, modeling, I/I studies, capital improvement plans

Monitoring, measurement and modification Performance indicators: overflows per 100 miles, backups, cleaning footage

  • Overflow emergency response plan Detection, response, notification, cleanup and reporting procedures
  • Communications and audits Public reporting and periodic self-audits

Many Oregon NPDES permits require utilities to keep collection system maintenance or overflow response plans in this spirit.

Combined Sewer Overflows

A few older Oregon cities have combined sewers , which carry stormwater and sewage in one pipe. Their permitted combined sewer overflow (CSO) outfalls discharge during large storms. Portland's Big Pipe project (completed in 2011) greatly reduced the city's CSOs. Operators of CSO systems monitor CSO structures and storage basins, keep regulators and tide gates working, and report overflow events as the permit requires.

Hydrogen Sulfide in Collection Systems

Generation : sulfate-reducing bacteria in the anaerobic slime layer convert sulfate to sulfide. Force mains are prime locations because they run full with no air, and long detention allows sulfide to build up. Warm temperatures and high-strength wastewater speed it up.

Release and corrosion : turbulence at drops, force main discharges and junctions releases H2S gas. Acidithiobacillus bacteria on moist crowns oxidize it to sulfuric acid , which dissolves concrete (crown corrosion) and attacks metal. H2S is also deadly to workers.

  • Control Examples
  • Prevent formation Air or pure-oxygen injection in force mains; calcium nitrate
  • Precipitate Ferrous or ferric salts
  • Keep in solution Magnesium hydroxide to raise pH (keeps sulfide as HS-)
  • Oxidize Hydrogen peroxide, hypochlorite, permanganate
  • Design and operation Shorter force main detention, smooth drop structures, ventilation, routine cleaning
  • Protect structures Corrosion-resistant liners and coatings; PVC and HDPE pipe; manhole inserts

Track sulfide and pH at discharge points, monitor gas levels at problem manholes, and inspect concrete for corrosion. Exposed aggregate, missing cover over rebar and soft, pasty surfaces are signs of active attack.

Worked Example: Estimating Overflow Volume

A crew finds a manhole overflowing at about 25 gpm, estimated by timing a bucket fill at a nearby discharge point and comparing with reference charts. Records show it began 3 hours 20 minutes earlier.

  • Duration = 200 minutes
  • Volume ≈ 25 gpm × 200 min = 5,000 gallons

Report the estimate, the method used and the uncertainty. Refine it later with pump station run times, flow meter data or rainfall records, and update DEQ in the written report.