Study guide
14.1 Gravity Sewer Design, Manholes & Inflow/Infiltration (I/I) Management
Oregon Water and Wastewater Operator Certification Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Oregon Operator Programs and DEQ Wastewater Certification
1.1 Dual-Agency Structure: DEQ Wastewater and OHA Drinking Water Programs 1.2 DEQ Wastewater System Classification and Supervision Rules 1.3 DEQ Certificates: Qualifications, OIT, Provisional Path, Exams and Fees
2 Chapter 2: OHA Drinking Water Certification and Certificate Renewal
2.1 OHA System Classification, Direct Responsible Charge and the Filtration Endorsement 2.2 OHA Certificates: Experience Tables, OIT, Exams, Fees and Small Water System Certification 2.3 Renewal, CEUs, Reinstatement, Reciprocity and Discipline for DEQ and OHA Certificates
3 Chapter 3: Federal Rules, Oregon Water Quality Standards and Cyanotoxins
3.1 Clean Water Act, Safe Drinking Water Act & NPDES Permitting 3.2 Willamette Basin TMDL and Oregon Water Quality Standards 3.3 Harmful Algal Blooms (HABs) & Oregon Cyanotoxin Rules (OAR 333-061-0510)
4 Chapter 4: Source Water, Intakes and Wells
4.1 Raw Water Sources, Intake Structures & Pretreatment 4.2 Groundwater Sources and Wells: Hydraulics, Construction and Protection
5 Chapter 5: Coagulation, Clarification and Filtration
5.1 Coagulation, Flocculation & Jar Testing Dynamics 5.2 Sedimentation, Clarification & Media Filtration Systems 5.3 Slow Sand, Diatomaceous Earth, Cartridge and Membrane Filtration
6 Chapter 6: Drinking Water Disinfection
6.1 Disinfection Chemistry, Chlorination Dynamics & CT Calculations 6.2 UV, Ozone, Chlorine Dioxide, Chloramines and Disinfection Byproduct Control
7 Chapter 7: Specialty Water Treatment and Residuals
7.1 Iron and Manganese Removal, Softening, and Taste and Odor Control 7.2 Corrosion Control, Lead and Copper, and Fluoridation 7.3 Water Treatment Residuals: Sludge, Backwash Water and Membrane Concentrate
8 Chapter 8: Distribution System Infrastructure
8.1 Distribution System Hydraulics, Piping Materials & Storage Facilities 8.2 Valves, Fire Hydrants & Water Main Installation / Disinfection 8.3 Service Connections, Meters, Water Loss Control and Utility Locating
9 Chapter 9: Distribution Operations, Cross-Connection Control and Water Quality
9.1 Storage Tank and Booster Pump Station Operation, Inspection and Disinfection 9.2 Cross-Connection Control & Backflow Prevention Assemblies (OAR 333-061-0070) 9.3 Water Quality in Distribution: Water Age, Nitrification & Flushing Programs
10 Chapter 10: Wastewater Preliminary and Primary Treatment and Lagoons
10.1 Preliminary Treatment: Screening, Grit Removal & Flow Measurement 10.2 Primary Clarification & Sedimentation Hydraulics 10.3 Stabilization Ponds and Aerated Lagoons
11 Chapter 11: Biological Wastewater Treatment
11.1 Secondary Treatment: Activated Sludge Process Control & Variations 11.2 Fixed-Film Treatment: Trickling Filters, RBCs, MBBR and IFAS 11.3 Biological Nutrient Removal: Nitrification, Denitrification & Phosphorus Removal
12 Chapter 12: Tertiary Treatment, Disinfection, Recycled Water and Small Systems
12.1 Tertiary Filtration, Membrane Bioreactors and Oregon Recycled Water Classes 12.2 Wastewater Disinfection and Dechlorination 12.3 Small Wastewater Systems, Septage Handling and Odor Control
13 Chapter 13: Solids Handling and Biosolids
13.1 Sludge Thickening, Conditioning & Dewatering Technologies 13.2 Anaerobic and Aerobic Digestion Operations & Control 13.3 Biosolids Quality, Land Application Rules & OAR 340-050 / 40 CFR 503
14 Chapter 14: Wastewater Collection Systems and Pumping
14.1 Gravity Sewer Design, Manholes & Inflow/Infiltration (I/I) Management 14.2 Lift Station Design, Wet Wells & Submersible / Centrifugal Pumps 14.3 Collection System Maintenance, Pipeline Inspection (CCTV) & Trench Safety
15 Chapter 15: Collection System Rehabilitation and Overflow Control
15.1 Sewer Rehabilitation, Trenchless Renewal and New-Pipe Acceptance Testing 15.2 Overflow Response, Bypass Pumping, CMOM Programs and Sewer Sulfide Control
16 Chapter 16: Laboratory Procedures and Water Quality Testing
16.1 Drinking Water Microbiological Testing: Coliform, E. coli & RTCR 16.2 Wastewater Lab Analysis: BOD5, TSS, COD & Volatile Solids 16.3 Wastewater Lab: Nutrients, Alkalinity, Bacteria, Toxicity Testing and Lab Accreditation 16.4 Process Monitoring: pH, Turbidity, Dissolved Oxygen & Chlorine Residuals 16.5 Sampling Protocols, Quality Assurance / Chain of Custody & Reporting
17 Chapter 17: Equipment, Electrical Systems and Maintenance
17.1 Pumps, Blowers and Mechanical Maintenance Programs 17.2 Electrical Systems, Motors, Generators, Instrumentation and SCADA
18 Chapter 18: Applied Water and Wastewater Mathematics
18.1 Dimensional Analysis, Flow Conversions & Detention Time 18.2 Chemical Feed, Dosage Calculations & the Pounds Formula 18.3 Treatment Plant Hydraulics, Loading Rates (SOR, WOR) & Pumping Horsepower
19 Chapter 19: Utility Safety
19.1 OSHA Standards, Confined Space Entry & Hazardous Chemical Safety 19.2 Field Safety: Electrical Hazards, Fall Protection, Work Zones, PPE and Oregon OSHA Rules
20 Chapter 20: Emergency Preparedness, Security and Utility Management
20.1 Cascadia Subduction Zone (CSZ) Seismic Preparedness & Infrastructure Hardening 20.2 Wildfire Impacts on Watersheds, Post-Fire Water Quality & Emergency Operations 20.3 Security, Cybersecurity, Emergency Response Planning and Utility Management
14.1 Gravity Sewer Design, Manholes & Inflow/Infiltration (I/I) Management
Key Takeaways Explain This Topic AI
Gravity sewers operate under open-channel flow hydraulics governed by Manning's equation ( v = 1.486 n R 2 / 3 S 1 / 2 v = \frac{1.486}{n} R^{2/3} S^{1/2} v = n 1.486 R 2/3 S 1/2 ); lines must maintain a minimum self-cleansing velocity of 2.0 ft/s 2.0\text{ ft/s} 2.0 ft/s ( 0.6 m/s 0.6\text{ m/s} 0.6 m/s ) at design flow to prevent solids deposition, and not exceed 10 ft/s 10\text{ ft/s} 10 ft/s to avoid abrasive invert scour.
Common design standards (for example the Ten States Standards) set minimum slopes of 0.40% for 8-inch, 0.28% for 10-inch and 0.22% for 12-inch sewers to reach about 2 ft/s flowing full.
Manholes are required at all changes in sewer alignment, grade, pipe diameter, and pipe intersections, with a maximum spacing of 300 to 400 ft 300\text{ to }400\text{ ft} 300 to 400 ft for lines ≤ 15 in \le 15\text{ in} ≤ 15 in ; drop manholes are mandatory when an incoming invert is 2.0 ft 2.0\text{ ft} 2.0 ft or more above the outgoing invert to prevent turbulent stripping of corrosive H 2 S \text{H}_2\text{S} H 2 S gas.
Inflow represents direct, rapid stormwater intrusion (roof gutters, storm cross-connections, pick holes), whereas Infiltration represents delayed groundwater seepage through fractured pipes, leaking joints, and cracked service laterals during western Oregon wet-weather seasons.
Under standard Oregon NPDES conditions, overflows that may endanger health or the environment are reported by phone within 24 hours (DEQ regional office, or OERS at 1-800-452-0311 after hours) and in writing within 5 days.
Last updated: October 2026
7.1 Gravity Sewer Design, Manholes & Inflow/Infiltration (I/I) Management
A municipal wastewater collection system is a vast subterranean network designed to convey domestic, commercial, and industrial wastewater from consumer service laterals to the headworks of a wastewater treatment facility. Unlike pressurized water distribution systems, modern sanitary sewers are primarily engineered as gravity conveyance systems operating under open-channel flow principles.
In Oregon, municipal collection networks face unique operational and environmental demands. The Pacific Northwest experiences prolonged, intense wet-weather seasons characterized by heavy rainstorms and elevated seasonal water tables. Certified collection system operators must master open-channel hydraulics, conduit materials, manhole appurtenances, inflow/infiltration diagnostics, and strict environmental reporting protocols mandated by the Oregon Department of Environmental Quality (DEQ) .
Gravity Sewer Hydraulics & Manning's Equation
Gravity sewers do not flow under continuous hydrostatic pressure; instead, wastewater flows by gravity with a free, unpressurized water surface exposed to ambient atmospheric pressure. Gravity flow hydraulics are governed by Manning's Equation for open-channel flow:
v = 1.486 n R 2 / 3 S 1 / 2 v = \frac{1.486}{n} R^{2/3} S^{1/2} v = n 1.486 R 2/3 S 1/2
Where:
- v v v = mean flow velocity (feet per second, ft/s \text{ft/s} ft/s )
- n n n = Manning's roughness coefficient (dimensionless measure of internal pipe wall friction)
R R R = hydraulic radius (feet), defined as cross-sectional flow area divided by wetted perimeter ( R = A / P w R = A / P_w R = A / P w )
S S S = energy slope or hydraulic gradient (feet of vertical drop per foot of horizontal run, ft/ft \text{ft/ft} ft/ft )
Volumetric flow discharge ( Q Q Q , in cubic feet per second, cfs \text{cfs} cfs ) is determined by combining Manning's equation with the continuity equation ( Q = v ⋅ A Q = v \cdot A Q = v ⋅ A ):
- Q = 1.486 n A R 2 / 3 S 1 / 2 Q = \frac{1.486}{n} A R^{2/3} S^{1/2} Q = n 1.486 A R 2/3 S 1/2
- Circular Pipe Geometry & The Hydraulic Radius
For a circular sewer pipe of internal diameter D D D (ft) flowing completely full:
- Flow cross-sectional area: A = π D 2 4 A = \frac{\pi D^2}{4} A = 4 π D 2
- Wetted perimeter: P w = π D P_w = \pi D P w = π D
Hydraulic radius: R = A P w = π D 2 / 4 π D = D 4 R = \frac{A}{P_w} = \frac{\pi D^2 / 4}{\pi D} = \frac{D}{4} R = P w A = π D π D 2 /4 = 4 D
When a circular pipe flows exactly half-full ( d = D / 2 d = D / 2 d = D /2 ), the cross-sectional area and wetted perimeter are both cut in half, meaning that the hydraulic radius remains identically R = D / 4 R = D / 4 R = D /4 . Consequently, the theoretical velocity of a pipe flowing half-full is identical to the velocity when flowing completely full.
Manning's Roughness Coefficient ( n n n )
The roughness coefficient n n n reflects the frictional drag exerted by the pipe wall against the flowing liquid. Smoother pipes have lower n n n values, allowing higher velocities at lower slopes:
Sewer Pipe Material Nominal Manning's n n n Operational Considerations
Modern PVC (ASTM D3034) & Fusible HDPE 0.009 − 0.010 0.009 - 0.010 0.009 − 0.010 Exceptionally smooth; standard engineering designs typically use n = 0.011 − 0.013 n = 0.011 - 0.013 n = 0.011 − 0.013 for conservative long-term slime buildup allowance.
Vitrified Clay Pipe (VCP) 0.013 0.013 0.013 Historically widespread; smooth ceramic glaze; chemically inert; rigid.
Ductile Iron Pipe (Epoxy / Polyurethane Lined) 0.011 − 0.013 0.011 - 0.013 0.011 − 0.013 Smooth interior polymer lining prevents corrosion and provides low friction.
Smooth Finished Concrete Pipe 0.012 − 0.013 0.012 - 0.013 0.012 − 0.013 Standard for large interceptors ( > 24 in >24\text{ in} > 24 in ); susceptible to biogenic acid attack if unlined.
Corrugated Metal / Aging Brick Sewers 0.020 − 0.024 0.020 - 0.024 0.020 − 0.024 Severe frictional resistance; common only in legacy combined storm/sanitary vaults.
Velocity Thresholds: Self-Cleansing vs. Scouring Limits
Gravity sewers must be hydraulically engineered to operate within a specific velocity envelope:
Minimum Self-Cleansing Velocity ( 2.0 ft/s 2.0\text{ ft/s} 2.0 ft/s / 0.61 m/s 0.61\text{ m/s} 0.61 m/s ) : Wastewater carries dense inorganic solids (sand, grit, eggshells with specific gravities of 2.65 2.65 2.65 ) and coagulated organic solids. If wastewater velocity falls below 2.0 ft/s 2.0\text{ ft/s} 2.0 ft/s , these suspended solids settle out along the pipe invert. Settled solids create blockages, constrict flow area, and enter anaerobic decomposition, producing toxic and corrosive hydrogen sulfide ( H 2 S \text{H}_2\text{S} H 2 S ) gas. Collection lines must achieve at least 2.0 ft/s 2.0\text{ ft/s} 2.0 ft/s daily during peak dry-weather flow.
Maximum Permissible Velocity ( 10.0 ft/s 10.0\text{ ft/s} 10.0 ft/s / 3.05 m/s 3.05\text{ m/s} 3.05 m/s ) : When sewer slopes are excessively steep, flow velocities exceed 10.0 ft/s 10.0\text{ ft/s} 10.0 ft/s . Velocities above 10 ft/s 10\text{ ft/s} 10 ft/s cause abrasive rolling grit to gouge and erode the pipe invert, generate severe hydraulic turbulence at manhole junctions, and induce supercritical flow wave fronts that entrain air and strip hazardous gases into the atmosphere.
Regulatory Minimum Slopes by Diameter
To reach a self-cleansing velocity of about 2.0 ft/s 2.0\text{ ft/s} 2.0 ft/s when flowing full (assuming n = 0.013 n = 0.013 n = 0.013 ), common design standards such as the Ten States Standards set minimum slopes by pipe diameter. Agencies adopt these or their own design standards. As pipe diameter increases, the hydraulic radius ( D / 4 D/4 D /4 ) increases, allowing the pipe to achieve 2.0 ft/s 2.0\text{ ft/s} 2.0 ft/s at a flatter slope:
Nominal Pipe Diameter Minimum Slope (ft/ft) Minimum Slope (Percent) Minimum Fall per 100 ft 100\text{ ft} 100 ft
8 inches 8\text{ inches} 8 inches ( 200 mm 200\text{ mm} 200 mm ) 0.0040 0.0040 0.0040 0.40 % 0.40\% 0.40% 0.40 ft 0.40\text{ ft} 0.40 ft ( 4.8 inches 4.8\text{ inches} 4.8 inches )
10 inches 10\text{ inches} 10 inches ( 250 mm 250\text{ mm} 250 mm ) 0.0028 0.0028 0.0028 0.28 % 0.28\% 0.28% 0.28 ft 0.28\text{ ft} 0.28 ft ( 3.4 inches 3.4\text{ inches} 3.4 inches )
12 inches 12\text{ inches} 12 inches ( 300 mm 300\text{ mm} 300 mm ) 0.0022 0.0022 0.0022 0.22 % 0.22\% 0.22% 0.22 ft 0.22\text{ ft} 0.22 ft ( 2.6 inches 2.6\text{ inches} 2.6 inches )
15 inches 15\text{ inches} 15 inches ( 375 mm 375\text{ mm} 375 mm ) 0.0015 0.0015 0.0015 0.15 % 0.15\% 0.15% 0.15 ft 0.15\text{ ft} 0.15 ft ( 1.8 inches 1.8\text{ inches} 1.8 inches )
18 inches 18\text{ inches} 18 inches ( 450 mm 450\text{ mm} 450 mm ) 0.0012 0.0012 0.0012 0.12 % 0.12\% 0.12% 0.12 ft 0.12\text{ ft} 0.12 ft ( 1.4 inches 1.4\text{ inches} 1.4 inches )
21 inches 21\text{ inches} 21 inches ( 525 mm 525\text{ mm} 525 mm ) 0.0010 0.0010 0.0010 0.10 % 0.10\% 0.10% 0.10 ft 0.10\text{ ft} 0.10 ft ( 1.2 inches 1.2\text{ inches} 1.2 inches )
Note
Most design standards, including the Ten States Standards, set 8 inches as the minimum diameter for public gravity sanitary sewers. Local public works design standards control details such as any exception for short dead-end runs.
Partial-Depth Flow Dynamics (Hydraulic Elements)
Sewers rarely flow completely full. In open-channel flow, hydraulic efficiency varies dynamically with the ratio of flow depth to total diameter ( d / D d / D d / D ):
Maximum Flow Velocity ( d / D ≈ 0.81 d / D \approx 0.81 d / D ≈ 0.81 ) : Peak flow velocity does not occur when the pipe is full ( d / D = 1.0 d / D = 1.0 d / D = 1.0 ). Maximum velocity occurs when the pipe flows at approximately 81 % 81\% 81% of full depth , where velocity reaches roughly 114 % 114\% 114% of the full-pipe velocity . At this depth, the hydraulic radius is maximized while avoiding the additional frictional drag from the pipe crown.
Maximum Volumetric Discharge ( d / D ≈ 0.93 d / D \approx 0.93 d / D ≈ 0.93 ) : Maximum carrying capacity occurs when the pipe flows at approximately 93 % 93\% 93% of full depth , delivering roughly 107 % 107\% 107% of the full-pipe discharge . When depth increases from 0.93 0.93 0.93 to 1.0 1.0 1.0 , the top perimeter suddenly adds significant frictional surface area without adding meaningful flow area, actually choking discharge capacity.
Sewer Pipe Materials & Physical Properties
Choosing pipe materials for wastewater collection requires evaluating chemical resistance to biogenic sulfuric acid, abrasion resistance, structural crush strength, joint watertightness, and seismic flexibility.
1. Polyvinyl Chloride (PVC) Pipe (ASTM D3034 / ASTM F679)
PVC is the predominant piping material installed in modern municipal collection systems for diameters up to 15 inches 15\text{ inches} 15 inches (under ASTM D3034) and 18 to 48 inches 18\text{ to }48\text{ inches} 18 to 48 inches (under ASTM F679).
Standard Dimension Ratio (SDR) : SDR represents the ratio of outside pipe diameter to wall thickness ( S D R = O D / t SDR = OD / t S D R = O D / t ). The standard municipal gravity sewer class is SDR 35 ; for deeper burial ( > 15 ft >15\text{ ft} > 15 ft ) or high water tables, heavier-walled SDR 26 is specified.
Joints : Bell-and-spigot joints utilizing locked-in elastomeric rubber gaskets that provide watertight, flexible seals resisting root penetration and groundwater infiltration.
Performance : 100% immune to electrochemical soil corrosion and biogenic sulfuric acid attack. Lightweight and manufactured in 13 - 13\text{-} 13 - to 20 -foot 20\text{-foot} 20 -foot lengths, reducing the frequency of joints. However, PVC is flexible and relies heavily on properly compacted side bedding (haunching) to prevent ovalization and pipe deflection.
2. Ductile Iron Pipe (DIP)
Applications : Specified where extreme structural beam strength is required: shallow bury under heavy arterial roadways ( < 3 ft <3\text{ ft} < 3 ft of cover), bridge crossings, aerial stream crossings, unstable soils, or where separation distances to potable drinking water mains cannot meet state minimums.
Internal Lining Requirements : Raw municipal wastewater generates hydrogen sulfide gas. While ductile iron has high structural tensile strength, bare ductile iron is rapidly destroyed by sulfuric acid. Ductile iron sewer pipe must be lined with factory-applied ceramic-filled amine-cured novolac epoxy (such as Protecto 401) or high-build polyurethane to isolate the metal barrel from corrosive headspace gases.
3. Vitrified Clay Pipe (VCP)
Historical Significance : The dominant sewer material installed in Oregon communities from the late 19th century through the 1970s.
Characteristics : Formed from baked clay and ceramic shale vitrified at over 2 , 000 ∘ F 2,000^{\circ}\text{F} 2 , 00 0 ∘ F . Chemically inert to virtually all acids, bases, and aggressive industrial solvents. Excellent resistance to abrasive invert scour.
Vulnerabilities : Extremely brittle, heavy, and manufactured in short lengths ( 3 to 6 ft 3\text{ to }6\text{ ft} 3 to 6 ft ). Older installations utilized mortar or oakum joints that crack under ground movement, making unlined VCP the leading source of root intrusion and groundwater infiltration in older Pacific Northwest systems.
4. High-Density Polyethylene (HDPE)
Butt-Fusion Joint Integrity : HDPE pipe segments are heat-fused end-to-end to create a monolithic, continuous pipeline with zero mechanical joints.
Applications : The premier material for trenchless pipeline rehabilitation, including pipe bursting and horizontal directional drilling (HDD) under rivers, wetlands, and highway embankments.
Seismic Resilience : Due to the severe threat posed by the Cascadia Subduction Zone, western Oregon utilities increasingly prioritize HDPE. Its ability to bend and deform without separating absorbs massive lateral ground displacement and soil liquefaction.
Manhole Design, Placement & Drop Assemblies
Manholes provide surface access to buried collection infrastructure for inspection, hydraulic jetting, flow monitoring, and emergency clearing.
Placement & Spacing Mandates
Standard municipal collection guidelines require manholes at:
Every horizontal change in pipe alignment (bends).
Every change in pipeline grade or slope.
Every change in nominal pipe diameter.
Every pipeline intersection or lateral junction.
The terminal dead-end of all public gravity mains (to provide jetting access).
Maximum Spacing Thresholds :
For sewer pipes 15 inches 15\text{ inches} 15 inches and smaller : Manholes must be spaced at intervals no greater than 300 to 400 feet 300\text{ to }400\text{ feet} 300 to 400 feet ( 90 to 120 m 90\text{ to }120\text{ m} 90 to 120 m ) to ensure hydraulic jetting hoses and mechanical cleaning equipment can span the entire reach.
For pipes 18 to 30 inches 18\text{ to }30\text{ inches} 18 to 30 inches : Spacing may extend up to 500 feet 500\text{ feet} 500 feet .
Manhole Invert Channels & Benches
The floor of a sanitary manhole must feature a smooth, hydraulically contoured U-shaped invert channel:
Invert Channel Depth : The channel depth must match the full diameter or at least three-quarters ( 0.75 0.75 0.75 ) of the pipe diameter to confine sewage flow within the channel.
Bench Sloping : The benches on either side of the channel slope upward toward the manhole wall, commonly about 1 2 \frac{1}{2} 2 1 to 1 inch per foot 1\text{ inch per foot} 1 inch per foot (roughly 4 to 8 percent). This steep slope ensures that when high flows surcharge above the channel, settled rags and solids slide back into the active stream as water levels recede, preventing septic decomposition on the shelf. CROSS-SECTION OF DROP MANHOLE
- [ Manhole Cover ]
- │
- [ Concrete Rings ]
- │
- Incoming Sewer Line ──────┬─────┼─────────► Cleanout Riser with Plug
- │ │
- │ │ (Fall > 2.0 ft)
- Drop │ │
- Pipe │ │
- │ │
- ▼ │
- Base Channel ◄────────────┴─────┴──────────► Outgoing Gravity Main
- (Smooth invert transition eliminates splashing and gas stripping)
- Drop Manholes: Physics & Corrosion Control
When a sewer main connects to a downstream manhole at an elevation significantly higher than the exiting main invert, standard entry causes severe operational problems.
The Two-Foot Rule : A Drop Manhole assembly is mandatory whenever the vertical drop between the invert of the incoming sewer pipe and the invert of the outgoing sewer pipe exceeds 2.0 feet 2.0\text{ feet} 2.0 feet ( 24 inches 24\text{ inches} 24 inches / 0.6 m 0.6\text{ m} 0.6 m ) .
External vs. Internal Drop Assemblies :
External Drop : An exterior tee fitting is installed on the incoming line outside the precast manhole barrel. A vertical drop pipe conveys the sewage down the outside of the manhole wall, entering the manhole base at the channel elevation through a 90 ∘ 90^{\circ} 9 0 ∘ sweep. An inspection cleanout branch extends straight through the manhole wall to allow rodding.
Internal Drop : Used during retrofits; utilizes a specialized polymer or fiberglass drop stack bolted to the interior manhole wall.
Why Drop Manholes Are Mandatory :
Corrosive Gas Stripping : Cascading sewage forms free-falling droplets that violently entrain air and strip dissolved hydrogen sulfide ( H 2 S \text{H}_2\text{S} H 2 S ) gas out of liquid solution into the manhole air space. Moisture on the concrete crown absorbs this gas, where autotrophic Acidithiobacillus bacteria oxidize H 2 S \text{H}_2\text{S} H 2 S into concentrated sulfuric acid ( H 2 SO 4 \text{H}_2\text{SO}_4 H 2 SO 4 ) . The biogenic acid attacks the alkaline calcium carbonate in the concrete matrix, causing crown rot —turning concrete into structural mush (calcium sulfate / gypsum) and causing catastrophic roadway collapses.
Atmospheric Toxicity & Worker Safety : Uncontrolled stripping creates immediately lethal concentrations of H 2 S \text{H}_2\text{S} H 2 S ( > 100 ppm >100\text{ ppm} > 100 ppm ) in the manhole chamber.
Solids Deposition : Splashing splatters raw fecal solids and grease onto manhole rungs, walls, and benches, generating severe odor complaints and bacterial breeding grounds.
Inflow and Infiltration (I/I) Management
Inflow and Infiltration ( I / I I/I I / I ) represents extraneous, unpolluted water that enters the sanitary sewer system, robbing conveyance and treatment capacity. INFLOW vs. INFILTRATION ENTRY PATHWAYS
- INFLOW (Direct Stormwater) INFILTRATION (Groundwater Seepage)
- ┌───────────────────────────────────┐ ┌───────────────────────────────────────┐
- │ • Roof Gutters / Downspouts │ │ • Cracked / Fractured Main Pipes │
- │ • Area Yard Drains / Driveways │ │ • Leaking / Offset Pipe Joints │
- │ • Cross-Connected Catch Basins │ │ • Defective Private Building Laterals │
- │ • Unsealed Manhole Pick Holes │ │ • Porous Brick Manhole Chimney Rings │
- │ • Foundation / Sump Pumps │ │ • Tree Root Penetrations │
- └───────────────────────────────────┘ └───────────────────────────────────────┘
- ▲ Immediate Peak Flow ▲ Delayed, Sustained Base Flow
- 1. Inflow
Definition : Direct stormwater runoff that enters the sewer system from dedicated surface connections.
Characteristics : Instantaneous response to rainfall events. Hydrographs show razor-sharp peaks that mirror rainfall intensity curves, multiplying dry weather flows by 500 % to 1 , 000 % 500\%\text{ to }1,000\% 500% to 1 , 000% within minutes.
Primary Sources : Illegal residential roof downspouts plumbed into sewer cleanouts, parking lot catch basins cross-connected to sanitary lines, unsealed manhole pick holes submerged in street gutters, and basement foundation sumps.
2. Infiltration
Definition : Groundwater that enters collection pipes and service laterals through defective, below-ground structural components.
Characteristics : Delayed, seasonal response. Flow rates rise gradually as winter rains saturate the soil column and elevate the regional groundwater table above the pipeline elevation. Infiltration persists for weeks or months after storms cease.
Primary Sources : Cracked or crushed clay pipe barrels, deteriorated mortared joints, unsealed manhole chimney rings, root-penetrated service lateral connections, and leaking pipe-to-manhole boot seals.
The Western Oregon Wet-Weather Challenge
In western Oregon (the Willamette Valley and coastal basins), municipal systems experience high annual precipitation ( 40 to 100 + inches/year 40\text{ to }100+\text{ inches/year} 40 to 100 + inches/year ). Saturated clay soils and high water tables create severe wet-weather peaking factors ( Q peak / Q average > 5.0 Q_{\text{peak}} / Q_{\text{average}} > 5.0 Q peak / Q average > 5.0 ). Unchecked I / I I/I I / I overwhelms pump station pumping capacity, washes out biological biomass at activated sludge plants, and triggers illegal raw sewage discharges into sensitive rivers.
I/I Diagnostic & Investigation Methodologies
Diagnostic Technique Primary Target Operational Procedure & Field Application
Smoke Testing Direct Inflow & Shallow Infiltration Non-toxic zinc chloride or glycol smoke is injected into isolated pipe sections using high-velocity blowers. Plumes exiting roof gutters, lawn drains, or sidewalk cracks reveal illegal stormwater tie-ins and broken shallow laterals.
Dye Water Tracing Direct Inflow & Cross-Connections Concentrated non-toxic fluorescent dye (fluorescein or rhodamine) is introduced into suspected storm drains, catch basins, or surface swales with wash water while downstream sanitary manholes are visually monitored.
Flow Isolation & Nighttime Weiring Deep Infiltration Portable acoustic Doppler flow meters or V-notch weirs are deployed at manholes between 1 : 00 AM 1:00\text{ AM} 1 : 00 AM and 4 : 00 AM 4:00\text{ AM} 4 : 00 AM (when residential domestic use is near zero). Flow measured during this window represents pure groundwater infiltration.
Closed-Circuit Television (CCTV) Structural Infiltration & Joint Leaking Crawler cameras travel through pipes recording real-time gushing joints, weeping cracks, protruding taps, and structural collapse under PACP standards.
Sanitary Sewer Overflows (SSOs) & Oregon DEQ Reporting
A Sanitary Sewer Overflow (SSO) is an unpermitted discharge of untreated or partially treated raw sewage from a collection system into waterways, public streets, parks, or private basements before reaching the wastewater treatment plant.
Common Root Causes of SSOs
Severe wet-weather I / I I/I I / I hydraulic capacity exceedance.
Conduit blockages from Fats, Oils, and Grease (FOG), wet wipes, and massive root intrusions.
Lift station mechanical failures, loss of electrical utility power, or telemetry failures.
Structural pipeline collapses or contractor excavation strikes.
Environmental & Public Health Consequences
Raw sewage carries pathogenic bacteria ( Salmonella , Campylobacter , E. coli ), viruses (Norovirus, Hepatitis A), and protozoan cysts ( Cryptosporidium , Giardia ). Discharges into Oregon streams severely deplete dissolved oxygen, smother salmonid spawning gravels with organic solids, spike toxic un-ionized ammonia concentrations, and force downstream drinking water intake closures and shellfishing bans.
Oregon DEQ Mandatory Notification Protocols
NPDES permits issued under OAR 340-045 carry standard general conditions (Schedule F) that set the reporting workflow for overflows: MUNICIPAL SSO REPORTING PROTOCOL (OREGON DEQ)
- [ SANITARY SEWER OVERFLOW DETECTED ]
- │
- ▼
- ORAL REPORT AS SOON AS POSSIBLE, WITHIN 24 HOURS
- DEQ regional office (business hours) or OERS
- 1-800-452-0311 (after hours)
- (Noncompliance that may endanger health/environment)
- │
- ▼
- CONTAINMENT & PUBLIC SAFETY
- Deploy vacuum trucks, sandbags, and berms
- Post public warning signs at contaminated waterways
- Disinfect and lime affected soil surfaces
- │
- ▼
- WRITTEN 5-DAY INCIDENT REPORT
Submit formal report to DEQ within 5 days:
- Exact spill location and coordinates
- Start time, end time, and total duration
- Estimated total volume discharged (gallons)
- Name of affected receiving water body
- Root cause determination
- Corrective actions taken to prevent recurrence
Oral Report Within 24 Hours :
Report by phone as soon as possible, and no later than 24 hours after becoming aware of the overflow: to the DEQ regional office during business hours, or to the Oregon Emergency Response System (OERS) at 1-800-452-0311 outside business hours.
OERS is the state's 24-hour emergency clearinghouse and relays reports to DEQ and other agencies. Utilities should also warn downstream water suppliers directly when an intake may be affected.
Public Health Protection & Containment :
Crews must immediately contain the spill using sandbag berms, bypass pumps, or vacuum recovery trucks.
Public access points, parks, and stream banks must be posted with warning signage advising the public to avoid water contact.
Detailed 5-Day Written Report :
Within 5 days of becoming aware of the incident, the utility must submit a written report to DEQ detailing the exact volume, duration, environmental impact, cleanup procedures, and long-term capital or operational remediations.